Council archive · source document
08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
_ Ww SITE MANAGEMENT RULES FOR ENVIRONMENTAL PROTECTION — CONS TRUCTION PHASE B-4 G) Erosion and sediment control 1. No sediment is to be discharged to the natural drainage lines or wetland. 2. All on site works and disturbed areas are to be located within areas protected by sediment and erosion control works. 3. Any damage to water quality, erosion and sediment control structures is to be repaired immediately. H) Community Relations 1. Site personnel are to respect the privacy of residents of the area and take actions to minimise any nuisance. 2. Any complaints are to be reported immediately to the Principal Contractor or SEO. DECLARATION Ihave read, understood and will comply with the Site Management Rules during the construction of the project. Name?........ ec eee ceeeeeeeeceeeeeesnes Employer. ...........0::0ccccceeeecceees Sigmature....... 00... cccccsecceeceeeseeeees Date Authorisation:........0 ccc ccccceeeceeseesssesssssseeesccceececeneceseseeeeeeeans (signature of Principal Contractor or SEO and date) (copy of site plan showing management areas to be provided) (note — the above declaration is to be detachable and copies retained by the employee and Principal Contractor) G:ADMINIB15184,G, DAMR.B15184.001.05.DOC 22/705 08:07 mem * OCEANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.