Council archive · source document
Change to Existiing Approval 152005.170.06
Officer: Glen Confort Direct Telephone: 07) 5329 6241 Fax: (07) 5329 6501 Our Reference: 152005.170.06 Your Reference: 31 January 2014 RPS Group PO Box 149 WURTULLA QLD 4575 Dear Sir/Madam Change to an Existing Approval Sustainable Planning Act 2009 I refer to your request to make a permissible change to an existing approval. On 29 January 2014, Council decided your requested changes. Details of the decision are as follows: APPLICATION DETAILS Application No: 152005.170.06 Street Address: Elysium Noosa 58 Noosa Springs Dr NOOSA HEADS QLD 4567 Real Property Description: SP 170964 Planning Scheme: The Noosa Plan (16 September 2013) DECISION DETAILS Council on 31 August 2005 decided to issue the following type of approval: Development Permit for Lot Reconfiguration - 189 Lots plus open space. In relation to the request the make a change to the existing approval, Council on 3 November 2005 decided to: Approve a change to conditions 18, 47, 49, 67, 68, 69, & 93 In relation to the request to make a change to the existing approval, Council on 27 October 2006 decided to: Amend Conditions 3, 4, 5, 6, 7, 9, 12, 29, 34, 39, 40, 44, 45, 46, 47, 48, 53, 55, 66, 69, 89 and 93 [Condition 93 of the previous decision notice will be referred to as an advice condition: condition 1 of the attached Compiled Decision Notice] of the previous decision notice; Include the following additional conditions 93, 94, 95 & 96 In relation to the request to make a change to the existing approval, Council on 19 June 2008 decided to: A. Approve the change to the Lot reconfiguration and change Conditions 3, 6, 9, 31, 33, 34, 41, 44, 45, 47, 66 and 69 and advice Condition 1. B. Refuse to change the width of the section of pathway connecting the 2m pathway at the entrance to the Public Use Land (Lot 901) as it will be more heavily utilised as a result of its connection to the Public Open Space and requires the width of 1.5m. In relation to the request to make a change to the existing approval, Council on 3 October 2011 decided to: A. Approve a change to condition 47 and Advisory Note 1. In relation to the request to make a change to the existing approval, Council on 29 January 2014 decided to: Approve a change to Conditions 9, 34, 38, 41, 44, 45, 46 and 66 Amend the list of Approved Plans and Documents. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is identified in the assessment manager’s conditions. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS General For the purpose of these conditions, the following definitions apply: - A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997. A Registered Professional Civil Engineer means an engineer who is registered with the board of Professional Engineers of Queensland.. Carparking area means a parking area as defined in the Schedule to the Shire of Noosa Planning Scheme inclusive of manoeuvring areas and access from the roadway. The person acting on this permit means any person or company who undertakes development pursuant to this permit. AS 2890.1 – 1993 means Australian Standard for Off Street Carparking - AS 2890.1-1993. Principal Contractor means the person nominated by the Applicant and approved by the Manager - Land Development at a pre-start meeting as being responsible for the major component of works associated with a Development Permit for Operational Works of any works on the site. An amended Plan of Development shall be provided prior to issue of a Development Permit for Operational Works. This amended Plan of Development shall incorporate Condition 2 of Development Approval 23245 DA to satisfaction of the Manager, Land Use. Acoustic buffering shall be undertaken generally in accordance with the Road Traffic Noise Assessment Report prepared by Ask Consulting Engineers and dated 25 May 2004 and condition 2.3 of Development Approval 23245 DA, prior to sealing of survey plans for Stage 1. An attribute shall be included as a rates notation on Council records on lots 1-5, 9, 10 & 13 noting that construction is limited to single storey buildings.. An environmental covenant as defined by Part 6, Division 4A of the Land Title Act 1994, shall be registered in favour of Council on all Community Group title parklands, prior to sealing of survey plans for Stage 1. The environmental covenants shall be for the protection for the site’s environmental values. In particular the covenant(s) shall relate to retention of specific vegetation and maintenance of water quality entering the Weyba Creek system. Suitable screening shall be provided in proximity to the site’s south eastern corner to prevent golf balls being hit into the area, prior to sealing of survey plans for Stage 1. The lot reconfiguration shall be generally in accordance with Master Plan 6994-53L.dwg dated 10 January 2008 and Staging Overall Layout - Plan No. 6994-31_0 dated 11 September 2007 as submitted by PMM Group, except as modified herein. It is a requirement that all lot numbers referred to in these conditions are those marked on Staging Overall Layout - Plan No. 6994-31_0 dated 11 September 2007 unless otherwise notated. The applicant shall grant all necessary easements in gross for the purposes of access over those internal roads necessary to provide direct access for the public from Noosa Springs Drive to the Conservation & Recreation Parklands, prior to sealing of survey plans for Stage 1. The development shall be un-gated to permit access to the Conservation & Recreation Parklands at all times. The Lot 902, as indicated on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013, shall be ecologically restored as a koala corridor, with a small landscape entry statement compatible with the natural character of the locality permitted to the reasonable satisfaction of the Manager, Land Use, prior to sealing of survey plans for Stage 1. The buffer between any site lakes or wetlands and the allotments shall be a minimum of 20 metres width, with the exception of Lake B (existing lake adjacent lots 166, 167 & 168) where a lesser buffer will be accepted subject to the following:- Stormwater entering Lake B will be fully treated. i.e. there is no intent to use the lake as part of the water quality treatment train. Lots 166 to 168 will be filled on the lake side to achieve a vertical separation a minimum of 2 metres high between the lake and the lots, and a childproof fence (AS1926.12-1993) within the lot separating the lots from the lake edge. There is to be no direct access from the lots to the park and lake. The southern side of the lake is to have a vertical lake edge wall, approximately 2 metres high in the lake, to discourage macrophyte growth. This wall is to extend to give approximately 20 metres offset from the lots. Landscaping around the southern lake edge above the water line will be dense and aimed at discouraging access. Landscaping in areas where walkways come close to the lake will be designed to discourage access into the lake. Lake is to be desilted and de-weeded as part of the works, which will further improve its existing quality. Monitoring is to be carried out over the coming summer months, to confirm low weed and algal growth. The EMP will include an education program for residents discouraging feeding of birds. The bird population will also be monitored and contingency measures derived should the numbers reach the point where nutrient loads to the lake become significant. The Stormwater Management Plan is to include contingency measures for weed control, emergency mixing and aeration for algal control, harvesting of algae and aquatic plants and general lake management. The spoil that occurs from decommissioning of the dam/s shall be tested and disposed of at an approved facility. The development over the subject land shall comply with the following: All necessary fire protection measures, buffers and devices that are required to protect the development from bushfires shall be incorporated within the ‘urban footprint’ and Private Open Space. With the exception of Lake A (Detention Basin D) and Detention Basin E and associated cut off drain, all necessary stormwater and water quality management and control devices associated with the development shall be located within the ‘urban footprint’ or the Private Open Space. On allotments abutting parkland, the set back from the parkland boundary shall be: 6 m for buildings, and 2 m for swimming pools and garden structures. Where roads abut Conservation Parkland, the set back to the edge of road pavement shall be in accordance with Drawing No. C5093/05/SK25 Sheet 25 prepared by Tate Professional Engineers as received on 18 August 2005 and vegetated to provide a buffer to the Conservation Parkland. The minimum width of the Conservation Parkland between Community Group Title Lots 157, 158, 181, 182 and 183 and the eastern boundary of the property shall be no less than 10 m at any point. No clearing or removal of native vegetation (other than that specified in the Ecological Restoration Plan and the approved plan for the public pathway) shall be undertaken in the Conservation Parkland. No development, infrastructure or recreation facilities (eg. Rubbish bins, seats, etc.), shall be located in the ‘Conservation Parkland Precinct’, with the exception of the sewerage trunk line as shown on Drawing No C5093/05/SK26 prepared by Tate Professional Engineers as received on 22 August 2005, approved public pathway and limited seating adjacent to the public pathway in the ‘Conservation Parkland Precinct’ where the RL is less than 3 metres. Any seating area shall be clearly identified from the vegetated areas to prevent adverse impacts. Pursuant to Section 3.5.21 of the Integrated Planning Act 1997, the currency period ends on the 31 August 2009 at which time all conditions must have been complied with, operational works completed, and the Plan of Survey lodged with the Council for endorsement. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation shall be presented to Council and shall be submitted in the correct form with the fees prescribed in Council's adopted fee schedule. Pursuant to Section 3.7.3(b) of the Integrated Planning Act, all outstanding rates and charges due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of the Plan of Survey for each stage. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service providers to ascertain the location of their underground services. The person acting on this permit shall apply and obtain for all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. If any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewerage), through any cause whatsoever in the course of, directly or indirectly carrying out development, that person shall forthwith notify the Manager - Land Development and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land Development. Alternatively, the Applicant may request the Council to carry out the rectification works. Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be undertaken by either Council or a Council approved contractor. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. Management Plans The development shall be undertaken in accordance with approved management plans. Management plans shall be revised to incorporate any required amendments, any resulting changes as per these conditions and shall ensure consistency with the Decision Notice DA23245, dated 25 August 2005. The amended management plans shall be approved in the sequence as outlined below and shall be generally in accordance with the following:- 18.1 The plans to be approved prior to commencement of work on site are:- Mosquito, Midge and Cane Toad Management Plan prepared by 4Site Co. and dated 12 April 2005. Fire Management Plan prepared by 4Site Co. and dated 12 April 2005. 18.2 The plans to be approved prior to the issue of a Development Permit for Operational Works are:- Construction Environmental Management Plan – Revision A prepared by TATE Professional Engineering and dated April 2005 Stormwater and Water Quality Management Plan prepared by 4Site Co. and dated 12 April 2005. Lake Design and Management Plan prepared by 4Site Co. and dated 12 April 2005. Ecological Restoration Plan prepared by 4Site Co. and dated 12 April 2005. Landscape Master Plan/Assessment Report prepared by EDAW Gillespies and dated April 2005. Waste Management Plan prepared by 4Site Co. and dated 12 April 2005 18.3 The plan to be approved within 3 months of commencement of work on site:- Operational Environmental Management Plan prepared by 4Site Co. and dated 12 April 2005. Stormwater, Water Quality and Lake Design Management Prior to Operational Works approval a nutrient budget assessment of the proposed lakes must be prepared by a suitably qualified and experienced professional. This shall identify the frequency of possible algae outbreaks/excessive macrophyte growth due to the predicted nutrient levels entering the lakes. Prior to Operational Works approval a revised MUSIC model shall be submitted by a suitably qualified and experienced professional to indicate the predicted water quality levels discharging from the site. The revised model shall show the influence of the catchment areas that drain directly to the lake without any treatment. It is recommended that the rainfall data used in the MUSIC modelling be revised to reflect a more local rainfall station. Prior Operational Works approval it shall be demonstrated that each proposed swale/bio-retention system shall sufficiently manage it’s local catchment discharges, including but not limited to safety (velocity/depth product), scour potential etc. Prior to Operational Works approval a revised water balance model shall be submitted by a suitably qualified and experienced professional to indicate the typical behaviour of the proposed lakes. Cultural Heritage In advance of any construction activities commencing, limited archaeological test excavations should occur at Site 1 and Site 2 as identified in the approved Archaeological Report to investigate the extent and nature of archaeological material (surface and sub-surface) present. The minimum excavation unit should be 1 metre by 1 metre. The excavated soil should be sieved through 6mm (minimum size) mesh sieves and when considered warranted Indigenous archaeological material encountered should be retained for analysis. If not retained for analysis, the material should be fully documented on site. When the excavation is completed all excavated material that is not retained should be redeposited back into the excavation unit. On the areas of elevated terrain in the southern and central sections of the study area mechanical excavations should be undertaken. These excavations should be undertaken with a mechanical excavator such as a Toyota 3 Series Bobcat with rubber types and a 1250mm scoop. The excavation unit should be around one metre wide and a minimum of two metres long. The soil should be scrapped away in 5cm sections and the soil passed through 6mm (minimum size) mesh sieves. When considered warranted, Indigenous archaeological material encountered should be retained for analysis. If not retained for analysis, the material should be fully documented on site. When the excavation is completed all excavated material that is not retained should be redeposited back into the excavation unit. The excavations should be undertaken by a qualified archaeologist under a permit (Permit to Excavate / Collect Items of the Queensland Estate) issued by the Environmental Protection Agency. The excavations should be undertaken with the approval and assistance of the Gubbi Gubbi and Undumbi People. At the completion of the excavations, the results should be documented and significance assessment and management recommends for each Site and Location provided. A cultural heritage management plan should be formulated after the results of the excavations have been documented. The recommendations provided by both the Gubbi Gubbi and Undumbi should be taken into consideration. River Flooding All buildings proposed on site (and areas utilised for carparking purposes associated with the buildings) shall be constructed to comply with Council’s Minimum Floor Height requirements as defined in Council’s Planning Scheme and on Council’s Scheme Maps at the time of issue of the Building Permit. In this regard and as an indication only – the site should have a Minimum Floor Height of RL 2.5 (AHD). These levels however are subject to change and verification shall be made to Council’s Land Development Section prior to obtaining a Development Permit for Building Works. Vehicle Access Vehicle access, including the roundabout at Noosa Springs Drive external to the property, shall be provided to and within the site generally as shown on drawing number C5093/03/L4 Revision B dated 12/08/03 by Tate Professional Engineers. Access arrangements will be amended if required when the amended Plan of Development is accepted by Council. All works, including accesses and carparking, within the road reserve shall be completed for each stage as follows: Stage 1: Access roundabout on Noosa Springs Drive, Street ‘R2”; Street ‘R3’, Street ‘R8, and Street ‘R9”; Stage 2: Street ‘R5’; Stage 3: The remaining streets including Street ‘R4, and Street ‘R6’. Access to each stage shall comply with workplace health and safety regulations and if any areas of the site are under construction after any survey plans are sealed, the construction work areas shall be fenced with construction fencing to exclude the public from those areas. Any dedicated work areas adjacent to access roads shall be suitably screened with vegetation and safety fencing. All road reserves shall be stabilised once civil works are completed. The access to Lot 100 is to be located a minimum of 30 metres from the holding line of the roundabout at Road R1-R3 intersection. A vehicular access driveway for Lots 1-21, 32, 33, 49, 84, 90, 100-102, 155, 157, 158, 166, 183 and 189 shall be constructed from the street frontage of each lot with a maximum width of 3.5 metres. There accesses shall take into consideration the nearby traffic calming devices and provide sufficient separation to road intersections, in accordance with Austroads Part 5, Intersections at Grade. Driveways shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to grades that do not comply with AS2890.1-1993, Council will require that the driveway be removed and reconstructed to levels that do comply. Carparking Carparking shall be provided within the site as shown on the Carparking Layout Plan drawing number C5093/05/L4B prepared by Tate Professional Engineers (which includes the 10 carparking spaces adjacent to the Tennis Courts on R3, the three spaces at each cul-de-sac head for R8 and R9, and the 2 spaces at the Private Parkland on R4), except as modified herein. On-street carparking shall be provided at a rate of 1 space per every 4 lots for Lots 95 to 98, 100-130 and 133-189 in the road reserve in close proximity of these lots, approximately 25 metres distance. Three car spaces shall be provided at Recreational Parkland Lot 903, as indicated on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013, prior to sealing of survey plans for Stage 1. On-street parking spaces shall be located on the opposite side of the road to that of the swale drains. In the case where a swale drain is located on the same side of the road to the indented parking, a piped system shall be provided. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for user class 3. Roads Roads shall be constructed in accordance with plan no: C5093/03/L4B prepared by Tate Professional Engineers, with the following amendments for pavement widths: Street R3 spine shall be 7 metres in width from the intersection with R1 up to Lot 133. The lengths of R3 from Lots 83 to 76 and Lots 133 to Lot 142 shall remain as 6 metres. Streets R4, R5, R6, R8, and R9 shall be 5.5 metres in width. Road reserve widths shall be in accordance with Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013. A 5.5 metre wide driveway, 6 metres in length, shall be constructed on the northern side of the proposed roundabout on Noosa Springs Drive (near the existing gatehouse to Noosa Springs development) to provide emergency access to Eenie Creek Road, prior to sealing of survey plans for Stage 1. A lockable gate shall be provided at the driveway entrance and shall have a “road closed” sign attached. An alternative location may be appropriate subject to agreement from Council’s Works Planning Section. Frontage Footpath improvements such as topsoiling, grassing, and tree planting are required to all street frontages in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be buffalo or couch, free of weeds. Prior to sealing of survey plans for each stage, civil works shall have been stabilised within two weeks of completion of works as follows: The full footpath width shall be stabilised with turf as a minimum requirement or in accordance with approved landscaping plans, Swales shall be fully turfed, Silt fences shall be placed on the boundary of each lot, Barrier fencing shall be placed on the road edge to limit one building access to each lot and ensure no parking of any vehicles occurs on the footpath, Sand bagging on roadways and at stormwater inlets, and Any other measures considered best practice by the Applicant and Noosa Council to stabilise the site and minimise erosion potential on the site. Landscaping works not completed, shall require an uncompleted works bond to be submitted for each stage to ensure landscaping is undertaken in accordance with approved landscaping plans and Development Permit 2005/0524. A new 2.0 metre wide concrete path shall be constructed along the length of R1, R2 (from Lot 25 to Lot 39 to the crossing for the recreation park Lot 903, as indicated on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013), in accordance with Council’s design standards. Care shall be taken to protect any significant vegetation or any underground services. Pram ramps shall be installed where the pathways cross any of the roads and shall be constructed in accordance with Council’s standards. The paths and pram ramp shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish. Pathway Construction A 2.0 metre wide concrete shared pathway shall be constructed along the Weyba Creek frontage of the site as shown on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013 and shall connect to the Eenie Creek Road reserve bikepath/pathway at the proposed bicycle gate, prior to sealing of survey plans for Stage 1. The pathway shall also generally follow the sewer main that traverses the Conservation Parkland from Lot 114 to Lot 21. A 1.5 metres wide concrete pathway shall be constructed along the Street R3 to connect the 2m path in Condition 44 to the Public Open Space parcel Lot 901. The rest of the pathway network indicted on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013, with the exception of the section negotiating the escarpment which will be decided upon at operational works stage, but may be reduced to 1.2m if approved by Council. The following sections of pathway shall be constructed prior to sealing of survey plans for each stage as follows: Stage 1: Noosa Springs Drive to Street ‘R2”; Street ‘R3’, Street ‘R8, and Street ‘R9”; Stage 2: Street ‘R5’; Stage 3: The remaining streets including Street ‘R4, and Street ‘R6’. The public pathway shall be constructed from Tennis Court B to the alignment to the south of this point as shown on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013, prior to sealing of survey plans for Stage 1. The pathway to the north of Tennis Court B shall not be constructed to ensure this vegetation is adequately protected. Contributions Monetary contributions shall be paid to Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below: Stage / Sub-Stage Lot Qty PSP 16 Sewerage Headworks Contributions PSP 17 Water Supply Headworks Contributions PSP 20 Pathway Trunk Network Contributions TOTAL CONTRIBUTIONS 1 41 $71,453 $176,983 $26,073 $274,509 2 4 $7,329 $18,153 $2,608 $28,090 3 20 $43,188 $106,972 $15,366 $165,526 4 18 $38,870 $96,275 $13,829 $148,974 5A 4 $8,638 $21,395 $3,073 $33,106 5B 3 $6,478 $16,046 $2,305 $24,829 5C 6 $12,956 $32,092 $4,610 $49,658 6A 1 $2,159 $5,349 $768 $8,276 6B 6 $12,957 $32,092 $4,610 $49,659 6C 5 $10,797 $26,743 $3,841 $41,381 6D 3 $6,478 $16,046 $2,305 $24,829 6E 3 $6,478 $16,046 $2,305 $24,829 7A 5 $10,797 $26,744 $3,842 $41,383 7B 3 $6,478 $16,046 $2,305 $24,829 8A 3 $6,478 $16,046 $2,305 $24,829 8B 4 $8,638 $21,395 $3,073 $33,106 8C 4 $8,638 $21,395 $3,073 $33,106 8D 3 $6,478 $16,046 $2,305 $24,829 9A 4 $8,638 $21,394 $3,073 $33,105 9B 5 $10,797 $26,743 $3,841 $41,381 9C 4 $8,638 $21,394 $3,073 $33,105 9D 3 $6,478 $16,046 $2,305 $24,829 9E 3 $6,478 $16,046 $2,305 $24,829 9F 6 $12,956 $32,092 $4,610 $49,658 9G 4 $8,638 $21,394 $3,073 $33,105 9H 6 $12,956 $32,092 $4,610 $49,658 10A 3 $6,478 $16,046 $2,305 $24,829 10B 3 $6,478 $16,046 $2,305 $24,829 10C 3 $6,478 $16,046 $2,305 $24,829 10D 4 $8,638 $21,395 $3,073 $33,106 10E 5 $10,797 $26,743 $3,841 $41,381 TOTALS = 189 The above amounts will be subject to variations in the Consumer Price Index, All Groups Brisbane from June 2006 (Stages 1 & 2) and from June 2011 (Stages/Sub-Stages 3 to 10) until the date of payment. All contributions must be paid prior to Council endorsement of the plan of survey for each stage or sub-stage as outlined above. Sewer Mains Each lot shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council, prior to sealing of survey plans for each stage. The internal pump station and the internal sewerage reticulation system shall be designed and constructed in accordance with Council’s Standards and requirements at no cost to Council. This infrastructure shall form part of Council’s sewer reticulation system and shall be maintained by Council except for the sections of sewer contained within individual allotments. Sewers within individual allotments shall be private sewers with all operations and maintenance being the responsibility of the Body Corporate. The sewerage network shall be generally in accordance with the Sewer Master Plan prepared by Tate Professional Engineers Drawing No. C5093/04/S01 dated 14/2/05. Sewer alignment throughout the Conservation Parkland Precinct shall be generally in accordance with Tate Professional Engineers drawing no.: C5093/05/SK26 dated August 2005. The proposed public pathway shall also generally follow the sewer alignment within the Conservation Parkland Precinct. All sewers located in Private Open Space Precinct, Conservation Parkland Precinct or Recreation Parkland shall be aligned to avoid all existing trees and minimise impact on the environment. Final alignment shall be determined on site in conjunction with Council’s Water Supply & Sewerage Capital Works Manager. Manholes within the Conservation Parkland Precinct, shall have lid levels at RL 2.15 that is 0.18 metres above the nominated flood level of RL 1.97 and the area immediately around the manhole shall be mounded and shaped to blend in with the surrounding landscape, prior to sealing of survey plans for Stage 1. All works are to be carried out to the satisfaction of Noosa Shire Council’s Water & Sewerage Capital Works Manager. Town Water Supply The water supply network shall be generally in accordance with the Water Reticulation Master Plan prepared by Tate Professional Engineers Drawing No. C5093/04/W1 dated May 2005. Each lot shall be connected to Council’s existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council, prior to sealing of survey plans for each stage. The internal water reticulation system shall be constructed in accordance with Council’s standards. A minimum 150mm diameter loop main shall be constructed from the existing 200mm diameter main in Noosa Springs Drive adjacent to the north-west corner of the development through the development to connect to the existing 150mm diameter main in Noosa Springs Drive adjacent to the north-eastern corner of the development to service the site. An internal 150mm diameter loop main around the outermost road perimeter is to be provided. All public parklands are to be provided with a metered water connections with tap set on a 150mm diameter treated pipe post a minimum of 500mm above the ground and fitted with an anti-vandal handle and vacuum breaker at locations approved by Council. All private parklands and facilities shall be serviced via the Body Corporate meter. A network analysis at the applicant’s cost is to be carried out by Council’s Consultants John Wilson & Partners Brisbane Office and any requirements incorporated into the design and construction at no cost to Council. Regardless of water main sizing identified in network analysis, a minimum 150mm diameter loop main shall be specified. A separate, single metered service is to be provided to supply all body corporate flows. Individual metered water connections are to be provided to each allotment capable of being separately rated. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Fire hydrants are to be provided throughout the development in accordance with Council Engineering Design Standards and in accordance with Queensland Fire Service Standards. Service Easements The access easement for maintenance of Council’s sewer and water trunk mains adjacent to Eenie Creek Road along the proposed access to Lots 13 and 14, as indicated on Drawing No 6994-53P Revision P Sheets 1, 2 and 3 prepared by RPS and dated 28-11-2013, shall be an all weather access track (including across the open space) to be constructed by the applicant, prior to sealing of survey plans for Stage 1. A registered easement shall be created over any proposed water supply and Council sewer main within private property. The easements shall generally be parallel to, and centred over, the sewer main and be equivalent in width to twice the depth of invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0 metres wide. For private sewers inside individual allotments, provision shall be made to facilitate maintenance access. In this regard a width equivalent to twice the depth to invert level of the private sewer at the deepest point within the allotment (measured from the finished surface) or a minimum of 2.0 metres shall be provided. Private easements that would alert all potential owners, shall be created over the maintenance access areas for all private sewers. Maintenance responsibilities and building set-back requirements shall also be clearly designated in the Body Corporate’s Community Management Scheme. Where water supply and Council sewer mains coincide with internal road reserves, the road reserve is to be dedicated as a water supply and/or sewerage easement, to provide maintenance access. In this regard, plans submitted for Operational Works approval shall accurately show the location of the Council easements and private easements. In addition to this, the Applicant’s solicitor shall give Council’s solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easements shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council’s solicitor must be corrected immediately. No building or other structure including fountains, retaining walls, etc. (excluding fences) shall be constructed or encroach over a Council easement or private sewer access. Any building or structure within proximity of an easement, private sewer access, or any other public utility’s underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure. Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans and supporting documents, detailing these proposed foundations shall be designed by a registered practising Geotechnical Engineer and submitted with the application for a Development Permit for Material Change of Use for the dwelling houses Headworks Deleted and included in Condition 47. Acid Sulfate Soils The development shall be carried out in accordance with the Acid Sulfate Soils Report prepared by Soil Surveys Engineering Pty Ltd titled, Acid Sulfate Soils Investigation, Weyba Ranch and dated July 2003. The Construction Management Plan shall incorporate requirements for the management of acid sulfate soils in accordance with State Planning Policy 2/02 – Planning and Managing Development Involving Acid Sulfate Soils. Earthworks Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering Design Standards Manual and so as not to cause the ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. This will require the design and construction of drainage pipes within the development site that cater for drainage within the adjoining sites and in this regard a Development Permit for Operational Works shall be obtained. Where a change in the levels of the site outside of an existing or proposed road reserve is approved, the site shall be filled or cut so that each lot drains towards a road frontage unless a proposed drainage system will collect stormwater from off each lot and discharge the stormwater to an adequate Council stormwater drainage system. Such works undertaken on the site shall be carried out in accordance with Section 3.8 of Council's "Engineering Design Standards" Manual so as not to cause any ponding of water on any adjoining land, or the blockage of, or interference with any natural watercourses. A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of placing additional fill, prior to such fill being placed. Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper to the existing levels prior to the rear boundary of the property. Batters shall be at a maximum grade of 1:4 unless retained by a wall. Any existing fill or natural materials on the site or with the extent of approved works external to the site which do not satisfy the Manager - Land Development's or a Geotechnical Engineer's requirements shall be removed and replaced with suitable material. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. Any existing fill on the site that does not comply with Council’s requirements shall be removed at the direction of the Manager - Land Development prior to additional filling works commencing. Following completion of the filling works and prior to endorsement of the Plan of Survey, the registered practicing Geotechnical Engineer supervising the works shall submit compaction tests across the entire filled areas and a site classification report for each lot subject to filling. The extent of fill and each lot site classification shall be shown on a metes and bounds survey plan. An appropriate property notation shall be placed on Council's rates records to advise prospective purchasers of lots that have been filled that special foundations requirements will apply. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that border the development site unless it is intended to replace such fences. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. The dams to be retained shall be reshaped in order to ensure safety standards for egress after accidental entry apply. Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Environmental Health Noise from building works associated with commercial and or industrial development should comply with the following – Limited to between 7:00am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions. Not permitted on Sunday or public holidays. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. Waste Construction waste shall be managed in accordance with section 5.2 of the “Elysium Noosa Waste Management Plan dated 12 April 2005”, except as modified herein and including any amendments as required for the approval of the Waste Management Plan prior to operational works approval. General Waste and recycling collection shall be provided in accordance with section 3.2 of the “Elysium Noosa : Waste Management Plan dated 12 April 2005”. For recycle truck turn around the cul-de-sac at Road R8, drive way accesses to Lots 158, 157 shall be constructed of industrial strength road material to withstand a 22.5 tonne waste vehicle. For recycle truck turn around the cul-de-sac at Road R9, drive way access to Lot 180 and the outer edge of the central road island shall be constructed of industrial strength road material to withstand a 22.5 tonne waste vehicle. A letter shall be provided to Council’s waste contractors and a copy to Council to indemnify the contractors from damages to the road surfaces during normal work operations. This letter shall be provided by the Body Corporate prior to the waste service commencing and at any change of waste contractors. All park and street litter bins shall be moved to the kerbside by the Body Corporate for weekly kerbside collection. Refuse rates shall be charged to the Body Corporate for these bins. General All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route Management) Act 2002 are to be controlled on the site prior to Council endorsement of the plan of survey for Stage 1. In this context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they threaten environmentally significant areas of the site such as riparian zones and areas of natural vegetation. Where class 3 plants are removed as a result of this condition and there is not sufficient natural regeneration of native species, the areas shall be replanted with endemic native species so that a sustainable natural ecosystem is restored. Council’s Conservation Management Supervisor will not inspect the site until 30 days after the weed treatment and replanting is complete. Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Prior to sealing of survey plans for each stage all civil works relevant to each stage must be completed and the road reserves shall be stabilised. Silt fences shall be placed on the lot boundary on each road frontage and designated entry points to each lot for building works shall be constructed with gravel. Stormwater inlets shall be sandbagged and all relevant stabilisation works shall be undertaken prior to survey plans being released for each stage. Ecological Restoration works shall be completed for the entire Conservation Parkland prior to the sealing of survey plans for Stage One. The Conservation Parkland shall be dedicated to the Crown at Stage One of the lot reconfiguration as park for conservation and environmental protection purposes. The permanent Conservation Parkland fence shall be constructed along the entire boundary prior to sealing of survey plans for Stage One. This fence shall be in accordance with the approved details in the Landscaping Operational Work Development Permit 2005/0524. All landscaping works within the parks shall be completed in accordance with the Landscape Operational Works Decision Notice 2005/0524 prior to sealing of survey plans for Stage One. REFERRAL AGENCY CONDITIONS The referral agencies applicable to this application are: Referral Trigger Referral Status Referral Agency & Address Clearing Vegetation Concurrence Agency SARA at DSDIP Mike Ahern Government Building 12 First Avenue MAROOCHYDORE QLD 4558 Online: Mydas (at www.dsdip.qld.gov.au) Formerly Department Natural Resources & Water and Environmental Protection Agency Within 100m of trigger area and Coastal Management District, Contaminated Land Concurrence Agency A copy of any referral agency conditions is attached. APPROVED PLANS/DOCUMENTS The approved plans and / or documents for this development approval are listed in the following tables: Approved Plans Plan No. Rev. Plan Name Date 6994-53P Sheets 1, 2 and 3 P Plan of Development (Master Plan incl. Setbacks) – RPS Australia East Pty Ltd 28-11-2013 6994-31_0 O Staging Overall Layout – submitted by PMM Group 11 September 2007 ADVISORY NOTES The following Advisory Notes are for information purposes only and do not form conditions of approval: 1 Approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount for each Stage/Sub-Stage outlined below, which shall be paid to Council prior to obtaining endorsement of the Plan of Survey for each Stage/Sub-Stage. Stage / Sub-Stage Lot Qty Coastal Major Road Network ICP 1 41 $107,771 2 4 $10,778 3 20 $63,511 4 18 $57,159 5A 4 $12,702 5B 3 $9,527 5C 6 $19,053 6A 1 $3,176 6B 6 $19,053 6C 5 $15,878 6D 3 $9,527 6E 3 $9,527 7A 5 $15,878 7B 3 $9,527 8A 3 $9,527 8B 4 $12,702 8C 4 $12,702 8D 3 $9,527 9A 4 $12,702 9B 5 $15,878 9C 4 $12,702 9D 3 $9,527 9E 3 $9,527 9F 6 $19,053 9G 4 $12,702 9H 6 $19,053 10A 3 $9,527 10B 3 $9,527 10C 3 $9,527 10D 4 $12,702 10E 5 $15,878 TOTALS = 189 The above amounts will be subject to variations in the Consumer Price Index, All Groups Brisbane from June 2006 (Stages 1 & 2) and from June 2011 (Stages/Sub-Stages 3 to 10) until the date of payment. An Infrastructure Charge Notice for each Stage/Sub-Stage will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997. Payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately. A Registered Professional Engineer of Queensland shall certify engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. PROPERTY NOTES The following property notes will be placed against the subject property in Council’s property record system: An appropriate property notation shall be placed on Council's rates records to advise prospective purchasers of lots that have been filled that special foundations requirements will apply. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as such the level of assessment and applicable codes for any development approval resulting from this approval are identified in the conditions. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Operational Works landscaping, access and/or car parking, site civil works, roadworks, stormwater drainage, frontage works, sewer reticulation (including new mains, relocations, diversions, pump stations and rising mains), water reticulation, site filling, excavation of materials to fill another site SELF ASSESSABLE CODES Not Applicable SUBMISSIONS No properly made submissions were received about this application. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.noosa.qld.gov.au, or at Council offices. Yours faithfully glen conforti Development Planner DECISION NOTICE HISTORY 152005.170 - Original Decision Notice -. 31 August 2005 152005.170.2 – Changes to Existing Approval with amendment to Conditions 18, 47, 49, 67, 68, 69 & 93 - 3 November 2005 152005.170.3 - Changes to an Existing Approval with amendment to Conditions 3, 4, 5, 6, 7, 9,12, 29, 34, 39, 40 44, 45 46, 47, 48, 53, 55, 66, 69, 89 & 93 and additional Conditions 94, 95 & 96 - 27 October 2006 152005.170..4 – Changes to an Existing Approval with amendment to Conditions 3, 6, 9, 31, 33, 34, 41, 44, 45, 47, 66 & 69 and advice Condition 1 – 19 June 2008 152005.170.5 – Changes to an Existing Approval with amendment to Condition 47 and Advisory Note 1 – 3 October 2011 152005.170.6 – Changes to an Existing Approval with amendment to Conditions 9, 34, 38, 41, 44, 45, 46 and 66 and amendment to the list of approved plans. Encl. Approved Plans/Documents Appeal Rights Referral Agency Conditions – Department of Natural Resources & Water & Environmental Protection Agency INTEGRATED PLANNING ACT 1997 & 1998 REGULATION Department of Natural Resources and Environmental Protection Agency were concurrence agencies and their conditions are as follows:- Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. [word/footer1.xml] Page 15 of 19 [word/footer2.xml] Page 1 of 19 [word/header2.xml] 152005.170.05 [word/header3.xml] 152005.170.06 [Attachment: image4.png (image text)] Integrated Planning Act 1997 will result mn the clumps of remnant vegetation exhibiting a perimeter (metres) to area (hectares) ratio of greater than 200:1. The application has not met AS A.8.3 PRAS ® Viable networks are defined as areas of vegetation that exhibit high levels of connectivity, are representative of all regional ecosystems on the property, are large enough to allow ecosystem functioning, are self generating and able to remain in the landscape in spite of threatenmg processes. The area of the polygon of of concern vegetation on the eastern boundary of the property is approximately 1 7 ha. This polygon 1s not connected to any other remnant vegetation This polygon does not display a high level of connectivity This polygon 1s not considered to be a viable network and 1s therefore not required to be mamtatned. The application meets PRA 8. Decision: To be consistent with Part A of the Concurrence Agency Policy for Reconfiguration of a Lot, 27 June 2005, the followmg conditions must be mmposed on any approval given: ® The reconfiguration must remam consistent with the proposed location of allotment boundanes lustrated on Master Plan No. 6994-24D dated 29-09-2004 attached to this response: and Any remnant vegetation clearing are applied for as operational works that 1s the clearing of native vegetation unless exempt under schedule 8, part 1, table 4 of the Integrated Planning Act 1997 Peter Lazzarm Semor Vegetatron Management Officer South East Region 11 August 2005 Natural Resources and Mines - Referral Agency Response Page 12 of 12 [Attachment: image5.png (image text)] ecoaccess environmental keences and perniis Notice Concurrence Agency Response ° The Environmental Protection Agency ts recognised as a concurrence agency under the Integrated Planning Regulation 1998 for coastal management, other than amenity and aesthetic significance or value Development conditions placed on the development approval for the application are in accordance with section 106 of the Coastal Protection and Management Act 1995 The Activity for which this development approval ts issued ts simply a restatement of the activity as prescnbed m the legislation at the tme of issuing this development approval Where there ts any conflict between the above descnptin of the Activity for which this development approval ts issued and the conditions as specified in this development approval as to the scale, intensity or manner of carrying out of the Activity, then such conditions prevail to the extent of the inconsistency This development approval authorises the Activity {t does not authorise environmental harm unless a concurrence agency condition within this development approval explicitly authorises that harm Where there is no condition, or the development approval is silent on a matter, the lack of a condition or silence shall not be construed as authorising harm As part of the concurrence agency response the following development conditions are to be attached to the development approval Conditions: 1 The subdivision shall be mn accordance with Drawing No 6994-31D Revision D, dated 25 May 2005 prepared by PMM Group Yours sincerely Signature Date Damien Brown Enquiries: Director Ben Cotton - Coastal Unit (Southern Region) Southern Region — Environmental Operations ‘ ___ Enwironmenial Protection Agency Environmental Environmenta! Operations Division — POBox 155 BRISBANE ALBERT STREET QLD 4002 Telephone (07) 3227 8499 Facsimile (07) 3221 0768 Page 2 of 2 + 09/03 Version 11 Environmental Protection Agency [Attachment: image6.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existiing Approval 152005.170.06Related documentApplication case desk ↗
About this file
- File size
- 179 KB (small file)
- File type
- DOCX
No other editions are linked here.