Original source · versioned page text
Generally in Accordance Approval OPW12 0095.01
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: OPW12/0095.01 : MLEWIS Your Reference: M1717 3 April 2018 Country Club Villages Pty Ltd C/- JFP Urban Consultants Pty Ltd PO Box 6 MAROOCHYDORE QLD 4558 [email protected] Dear Madam Generally in Accordance I refer to your letter requesting Council to endorse revised plans for the subject site. On 3 April 2018, Council considered the request to be generally in accordance with the Development Approval. Details of the decision are as follows: application details Application No: OPW12/0095.01 Street address: 35 Walter Hay Dr Noosaville Qld 4566 Real property description: Lot 2 SP 162077 Planning Scheme: The Noosa Plan (3 July 2017) Decision details The plans listed in the following table are considered generally in accordance with the approval. Plan No. Rev Plan/Document Name Date M1717E5-L01 A Construction Staging Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-EW01 A Earthworks Layout Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-EW02 A Earthworks Details Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R01 A Roadworks Layout Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R02 A Roadworks Details Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R03 A Roadworks Intersection Details Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R04 A Roadworks Longitudinal Sections Swallow Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R05 A Roadworks Cross Sections Swallow Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R06 A Roadworks Longitudinal Sections Blue Gum Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R07 A Roadworks Cross Sections Blue Gum Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R08 A Roadworks Sections Silver Gull Boulevard, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R09 A Roadworks Details, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-D02 A Drainage Layout Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-D03 A Drainage Longitudinal Sections, prepared by JFP Consulting Engineers 28 February 2018 other details If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council offices. Yours faithfully, Mark Lewis Coordinator - Engineering Enc: Approved Plans cc: Unitywater [word/footer1.xml] Page 2 of 2 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Generally in Accordance - OPW12/0095.01 Page 1 of 2 [word/header1.xml] 3 [Attachment: image2.jpeg (image text)] ee) NOOSA COUNCIL
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Generally in Accordance Approval OPW12 0095.01.docx)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.