Request for Further Information - 010.2007.00001242.001 [As Published] · 142007.1242

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Sewer

22.   Sewer reticulation notes on Drawing C57 to be amended as follows:-

            Note 4 - Delete “Mary River Sand”.
            Note 5 - Include “Unless otherwise noted”.
            Note 6 - “Work on existing sewer mains to be performed by Approved
           Contractor under Council supervision. All works at Developer’s cost.”

23.   Sewer house connection notes to be amended as follows:-

      Note 1
       Amend typo branches.
       Omit dot points 1, 2 and 3.
       Amend dot point 5 to refer to 150mm diameter not 100mm.
       Delete (HCB types P and F only) from dot point 6.

      Note 2
      Omit.

      Note 3
       Delete reference to A, P and F.

24.   Specify all manholes covers as “600mm clear opening Class D Havestock ductile iron
      light lift covers capable of being converted to bolt down covers if required.”


25.   Access details to sewerage pump station to be reconsidered.

       Access through Lot 4 is not acceptable.
       Access must be a minimum of 3.5m wide and include a drivethru for articulated
         leachate disposal vehicles and turnaround area to be suitable for bulk chemical
         delivery trucks.
       Access and turnaround areas to be either concrete or AC sealed in accordance
         with Noosa Shire Council requirements.
       Access to be via Rene Street extension using a commercial standard driveway
         crossover with appropriate layouts to facilitate safe entry and exit of vehicles.
       Existing gate on access truck to be relocated to the new Rene Street access.
       Existing cleared area to be used where possible.

26.   Note regarding rectification of existing access track to also refer to area through Lot 4.


27.   a)    New underground power in accordance with Energex and Council requirements
      to existing pump station to be detailed on drawings.

      b)    Connection of new underground service and disconnection of existing overhead
      service to be carried out in accordance with the requirements of Energex. Works to be
      carried out in a manner to ensure no disruption to Council’s pumping system occurs.

      c)     All works to be at Developer’s cost.

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2007.00001242.001 [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.