Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

HSTP Design · MCU26/0104

of 7

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 Notes
Levels shown are
approximate and are
sourced from local council
                                                                                                                                                                                                                 N
mapping or information                                                                                          Dam
provided by the client.
These levels are solely to
demonstrate the
functionality of the system.
Actual floor height is to be
confirmed with the builder
prior to installation.
All pipe work from the
structure to the proposed
system should be covered                                                                                                              Dam
and adequately vented and
be vermin/insect proof.                                                        Dam
All work carried out should
meet relevant
codes/standards and be
done by an appropriately
qualified and licensed
person.
Proposed system should be
constructed in a way to
maximize
evapotranspiration and
minimize potential pooling                                           Dam
and runoff.
If plans were not available
at the time of investigation
further reporting and
design work may be
needed prior to council                                                                                                                                      Dam
submission and installation.
Care is to be taken not to
sompact,smear or damage
the soil structure during
installation (This can lead
to premature failure).
If structures have been
built since our initial
investigation (Including                                            Dam
                                                                                                                                                             Dam
neighboring structures)
please contact us to
confirm this will not




                                                                                                                           15m
adversely effect the design.
Final landscaping and
                                                                                                                                              Proposed Advanced
installation should
                                                                                                                                              Secondary ASTP
discourage and limit causal
                                                                                            BH1
pedestrian access.(By way
of plantings, border,
mounds, visual and or                                                                Proposed Sub-Surface
physical deterrents)                                                                 Irrigation Area - 240sqm
The owner should obtain                                                              (20 x 12m)
knowledge on how to use
and maintain the proposed
system. Most of this is
available from your chosen                                                 Reserve Area
supplier/installer.                                                                           BH2
This report must be
approved by the local
council prior to any work
commencing.



                                                                                                                                 Dam


                                                                                                                                                                                     M & K Bennett Pty Ltd ATF The Bennett
Client- Lorensen Wastewater                                                                                           Abbreviations                                                  Family Trust T/A
Site - 1534 Lous Bazzo Drive, Cootharaba                                                                              BH : Borehole             DCP : Dynamic Cone Penetrometer      Onsite Wastewater Design
Date - 07/07/26                                                                                                       PT : Percolation Test     HD : Heavy Droplet Lilac Sprinkler   Gympie, QLD.
Job# - 24/348-3                                                                                                       TV : Turf Valve           RWT : Rain Water Tank                QBCC # 150 345 80
Scale - 1 : 600 @ A4 (Site features are approximate-Do not scale)                                                                                                                    E: [email protected]
                                                                                                                                                                                     W: www.wastewaterdesign.com.au
                                                                                                                                                                                     P: 0493615672

Used in these records

About this file

File size
882 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

HSTP Design.pdf · 882 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.