Log in to see the plans as drawn proposed unit development, Cooroy
Taylor ct
artists impression
DRAWING SET INDEX
100 SITE PLANS
WD.101 COVER SHEET
WD.102 GFA AND SITE COVER
200 FLOOR PLANS
WD.201 MAIN LEVEL PLAN
WD.202 MEZZANINE PLAN
WD.203 ROOF PLAN
500 ELEVATIONS
WD.501 ELEVATIONS
600 SECTIONS DA3 For Development Approval
issue issue / amendment
WD.601 SECTIONS
29.04.2022 LF/ AB
issue date drawn by
client
Maroolingar P/L ATF Twenty20 UT
project
Maroolingar Twenty20 Cooroy
location
Lot 4, Taylor Ct. Cooroy
COVER SHEET
Aboda Lee Foster • director Scott Falconer • director
Design p - 0424 620 247 p - 0431 267 157
internal views
Group e - [email protected] e - [email protected]
the aboda design group trust Level 2 1794 David Low Way Coolum Beach,
ABN 56 266 884 746 Q. 4573. PO box 2449 Noosa Heads Q 4567
t/a aboda design group • BSA License -150580097 • www.aboda.com.au
artists impression artists impression
• This drawing is to be read in conjunction with engineers drawings & reports • Construction
to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
scale as shown @ A3 issue
drawing no.
WD.101 DA3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 4 (of 23)
Section 2
N
8
6
°
7
5
.
6
0
7
'
4
1
6
N
"
8
W
6
°
7
5
.
6
0
7
'
4
1
6
"
W
LANDSCAPE
TAYLOR COURT (staff rec.)
62.93 m2
W
W
"
"
1
1
U
5
U
4
01
5
01
4
7
'
GF
52 GFA
7
64.13 m2
'
9
2
13 A M A
.
9
.5 9 M
2
3
.
4 .8 IN m2 EZZ
8
3
7m F
8
°
1
2 LO
°
1
OR
1
1
3
3
WINTER
S
U
S
01
S
H SUN PATH
S
49 ARD U
02
1
.1 2 S
1
m2 TAN GF
6
A )
am
6
D Sett
21 M A g (7
°
7
in
°
.6 5 IN g5 in
7
U pm Ris
.
m2 FL
2
02
5
.
2
H OO
5
3
49 ARD
MER
0
R
3
0
N
'
.1 2 S
SUM PATH
1
'
m2 TAN
1
2
2
SUN
D
2
2
U Ris
"
m in
02 0p
"
SI .3 g (6
W
g5
E
GF .30
"
TE
W
1
in
E
am
Sett
2
"
3
1 AM
6
1
'
)
2
7
3
5
.
6
CO 46.80 AIN F
'
3
4
7
5
.
°
1
3
4
3
U
1 V
°
1
7
02
3
,1 0 E m 2 LO
S
7
62 GFA
S
OR
8 .5 R Section 3
U .1 8 M
m2 EZZ
104.18 m2 9 m 01
2 -05 U
03 U
03
GF
62 GFA
U 11 GFA MAIN FLOOR 13 A M A U 11 GFA MEZZ .1 8 M
9 .0 IN m2 EZZ
N
132.63 m2 3m F U
N
03 75.98 m2
2 LO O
4
GF
4
R
7
A
1
7
13 M A
°
1
1
°
.8 8 IN
1
2
1
m2 FL
2
1
.
6
0
OO
.
6
'
0
U
2
R U 10 GFA MEZZ
'
2
03
2
U 10 GFA MAIN FLOOR
SITE COVER U 11-12
7
2
7
H 50.80 m2
7
49 ARD
7
"
95.73 m2
498.03 m2
"
.1 2 S
W
U 11 HARDSTAND m2 TAN
W
261.96 m 2 09-10
45.79 m2 D U 12 GFA MEZZ
U 12 GFA MAIN FLOOR U U
04 81.36 m2 04
184.52 m2 GF
62 GFA
U 12 GFA MAIN FLOOR EXTERNAL 13 A M A
ER U
U10 HARDSTAND .1 8 M
81.14 m2 9 .0 IN m2 EZZ
35.22 m2 U 12 GFA MAIN FLOOR 3m F U
04
16.75 m2 2 LO O GF
SITE COV
R A
U 09 HARDSTAND 13 M A
U 12 HARDSTAND .8 8 IN
35.22 m2 46.21 m2 m2 FL
U OO
04 R
H
W
49 ARD
W
U 09 GFA MEZZ
"
.1 2 S
SITE AREA 5,676.00 m2 (TBC)
U
"
m2 TAN 05 50.80 m2
6
8
6
U 09 GFA MAIN FLOOR GF
8
D
1
'
A
1
'
95.73 m2 64 M A
9
6
.9 1 IN
.
9
6
.
5
m 2 FL
7
5
OO
7
°
R
5
°
5
8
8
S
S
SITE COVER U 06-08 U 06HARDSTAND U 06GFA MEZZ U 05 GFA MEZZ
49.12 m2 U 07 GFA MEZZ 62.18 m2
607.13 m2 U 05 GFA MAIN FLOOR
62.18 m2 63.09 m2
U 07 HARDSTAND U 06GFA MAIN FLO
OR 137.86 m2
U 08 HARDSTAND 49.12 m2 OR U 05 HARDSTAND GFA MAIN FLOOR U 08 GFA MEZZ
49.12 m2 U 07 GFA MAIN FLO 139.03 m2 49.81 m2 U 05 62.18 m2
139.03 m2 U 06GFA MAIN FLO
OR 34.39 m2
OR OR
BIO RETENTION (2%) U 08 GFA MAIN FLO 13.88 m2 U 05 GFA MAIN FLO
113.03 m2 139.03 m2 OR 14.43 m2
OR U 07 GFA MAIN FLO
U 08 GFA MAIN FLO 13.88 m2
13.88 m2
LANDSCAPE
1,298.57 m2
E
"
3
1
1
5
'
2
.
3
1
°
2
6
E
1
8
"
3
1
N
1
5
'
2
.
3
1
Section 4
°
2
6
1
8
N
main level mezzanine level
GFA PER LEVEL
MAIN LEVEL
U 01 GFA MAIN FLOOR 134.87
U 02 GFA MAIN FLOOR
U 02 GFA MAIN FLOOR
146.80
21.65
COVERED HARDSTAND
U 03 GFA MAIN FLOOR
U 03 GFA MAIN FLOOR
139.03
13.88
MAIN LEVEL
LANDSCAPE AREAS
U 04 GFA MAIN FLOOR 139.03 U10 HARDSTAND 35.22
U 04 GFA MAIN FLOOR 13.88 LANDSCAPE
U 01 HARDSTAND 49.12
U 01
U 05 GFA CARETAKER 64.91
U 02 HARDSTAND 49.12 104.18
U 05 GFA MAIN FLOOR 137.86
U 05 GFA MAIN FLOOR 34.39 U 03 HARDSTAND 49.12
LANDSCAPE (South)
U 05 GFA MAIN FLOOR 14.43 U 04 HARDSTAND 49.12
U 06GFA MAIN FLOOR 139.03 1,298.57
U 05 HARDSTAND 49.81
U 06GFA MAIN FLOOR 13.88 LANDSCAPE (Staff rec)
U 06HARDSTAND 49.12
U 07 GFA MAIN FLOOR 139.03
U 07 GFA MAIN FLOOR 13.88 U 07 HARDSTAND 49.12 62.93
U 08 HARDSTAND 49.12
U 02
U 08 GFA MAIN FLOOR 139.03
LANDSCAPE BIO RETENTION
U 08 GFA MAIN FLOOR 13.88 U 09 HARDSTAND 35.22
U 09 GFA MAIN FLOOR 95.73 113.03
U 11 HARDSTAND 45.79
U 10 GFA MAIN FLOOR 95.73
U 11 GFA MAIN FLOOR 132.63 U 12 HARDSTAND 46.21 1,578.71 m²
U 11
U 12 GFA MAIN FLOOR
U 12 GFA MAIN FLOOR
184.52
16.75
556.09 m²
U 03
U 12 GFA MAIN FLOOR EXTERNAL 81.14
1,925.96 m² SITE COVER CALCULATIONS U 10
MEZZANINE
MAIN LEVEL U 12
U 01 GFA MEZZ
U 02 GFA MEZZ
52.59
62.18 SITE COVER U10+11 261.96 U 04
U 03 GFA MEZZ 62.18
SITE COVER U 1-5 1,108.59
U 04 GFA MEZZ 62.18
U 09
DA3 For Development Approval
U 05 GFA MEZZ 63.09 SITE COVER U 06-08 607.13 issue issue / amendment
29.04.2022 LF/ AB
U 06GFA MEZZ 62.18 issue date drawn by
SITE COVER U6/U7 498.03
U 07 GFA MEZZ 62.18
U 05
client
2,475.71 m² Maroolingar P/L ATF Twenty20 UT
U 08 GFA MEZZ 62.18
project
U 06
U 09 GFA MEZZ 50.80 Maroolingar Twenty20 Cooroy
U 10 GFA MEZZ
U 11 GFA MEZZ
50.80
75.98 U 08 U 07 location
Lot 4, Taylor Ct. Cooroy
U 12 GFA MEZZ 81.36 GFA AND SITE COVER
Aboda Lee Foster • director Scott Falconer • director
747.70 m²
SITE COVER
Design p - 0424 620 247 p - 0431 267 157
Group e - [email protected] e - [email protected]
the aboda design group trust Level 2 1794 David Low Way Coolum Beach,
2,673.66 m² ABN 56 266 884 746
t/a aboda design group
Q. 4573. PO box 2449 Noosa Heads Q 4567
• BSA License -150580097 • www.aboda.com.au
• This drawing is to be read in conjunction with engineers drawings & reports • Construction
SITE AREA 5672m2 to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
GFA AND SITE COVER
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site plan
site prior to commencement of any works • These drawings are not to be used for scaling.
SITE COVER 2,475m2 43% scale as shown @ A3 issue
SCALE 1:100 @ A3 drawing no.
WD.102 DA3
2
LANDSCAPE COVER 1,552m 28%
The text continues on section 5.