Original source · versioned page text
Revised Proposal Plans
Original PDF page 4, section 3. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn7 CP lin
eo W as b
6 5 4 3 03 al u
4
2 1 DP f ro s tr CP
7
1
of ad
°
PR denotes item and number.
1
ov e
er JXX
2
WINTER
1
CP
metal fall protection
BAL refer to Joiner for details
.
6
0
rol SUN PATH
'
2
l MR
2
er
7
o /h
7
do
or
"
2m
)
am
W
FG Sett
AFW g (7
protection
in g5 in
D0
U 10 2 3º
U 03
.
pm Ris
1
MER
18
18 17
SUM PATH N
metal fall
Mezzanine 17
15
16
Ua 04
16 CP 14 N
U 11
Mezzanine
BAL 15
14
11
13
12
Me
zz SU m Ris
p in
U 12
13 g (6
Ha R 10 ni n .30
g5
metal fall protection
12 9 e .30
R
AFW rds oo 8 in am
Sett
STAIR
11
)
AI
ta n fe d
2
10 7
6
U 12
ST
9 du 5
4
FFL 123.450 8
7 BAL PR nd
er 2
3
6 1
5 HighBay CP BAL
4 Storage BAL
3 DP
2
1 FG
3
DP
U See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.