Council archive · source document
08/1380 - Preliminary Building Approval [As Published] · 172008.1380
~——* = INTEGRATED PLANNING.ACT1997__
DN > Form 1 Development Application
—
Nea work that requires assessment against a planning scheme:
Building work - Complete Table A : (CJ Operational work - Complete Teble 8
Table A
(i) Whatis the nature of the building work made assessable in the planning scheme?
{Ci + fe any current approvals associated with this application? (e.g. méleiialchange fuse) “? SO
No (1 Yes - Provide details below
» [EXTESScN Te Croll Jewnoadt &-PegE Use - : |
Sota pV hae Sort eit.
proval feferen iy
Date approval lapses (ir kiya)
| [ 1.
a =
C2 fables)
—~|(i)—-Whatis the nature of the operational work made assessable in the planning scheme?
(Roadworks C1 Stormwater _ [Water infrastructure (J Clearing vegetation under the planning scheme
Oo Drainage works ([] Earthworks Sewerage infrastructure -,
C) Landscaping. D Signage Other - Specify VEC OAAL Px TESCigs 6
would be differént for different op
ional work, it may be more appropriate to provide these details in an attachment fo this form)
(1 Development Permit Preliminary Approval
(iii) What type of approval is being sought? (NOTE: itypu have indicated muttiple operational works In question (i) above and your answers to this question
th (Specify below)
| [Rbett VeeArDal ExTER SoS
(iv) ob. operational work necessary to facilitate the creation of new lots (ie. subdivision)?
N
lo 1 Yes - Specify the number of fots being created
(v) Arethere any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a tol)
No [1] Yes - Complete Table Ba) _
Table Bla) |i 27 Listof abprovaleférenic’s. "=" =F _22Bate approved: « 5] Date
1.
2
t
2. What is the dollar vatue of this operational work? (ie. the (otal value including GST, materials and labour)
Confirmation 6f lodgement|: Method of ddgemient,
’ Ww Confirmed
OFFICE USE ONLY
Baer ae
Sreaamt ee 4
Advice for completing Part E
General advice
© Part A must also be completed for alt IDAS development applications. .
© . The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Page 1
4
Qi | A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1380 - Preliminary Building Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.