Original source · versioned page text
2016-04-28 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 28 APRIL 2016
9.2. No adverse impact on other properties and the road’s footpath and
grassed verge (eg by diverting flows and/or blocking flows and causing
additional ponding)
9.3. Where applicable, extension of the site stormwater system to
accommodate stormwater from external site, including registration of
drainage easements
9.4. The use of gravity stormwater drainage only and not surcharge pits or
pumps.
10. Stormwater runoff from the development must be disposed of without causing
scour or damage to the subject site or any adjoining property.
Water & Sewer Connections
11. An underground connection to reticulated water and sewerage must be
provided to each lot in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
12. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to each lot.
Carried.
Cr Pardon voted in favour of the motion. Cr Jackson was absent for the vote on this item.
Cr Jackson re-joined the meeting.
2 OPERATIONAL PLAN PROGRESS REPORT - 3RD QUARTER 2015-16
Council Resolution
Moved: Cr Jackson
Seconded: Cr Pardon
That Council note the report by the Chief Executive Officer to the General Committee
Meeting dated 26 April 2016 providing an update on progress with the implementation of
the Operational Plan to 31 March 2016 and details of Council’s Key Performance
Indicators.
Carried.
Page 9 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.