Skip to the record
Accept no substitutions.

Original source · versioned page text

2018-11-15 Ordinary Meeting Minutes

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                      MINUTES


            Ordinary Meeting

        Thursday, 15 November 2018

                                 6pm
                    Pomona Showgrounds Hall
          Corner of Exhibition St and Pavilion St, Pomona




Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson, Joe Jurisevic,
Frank Pardon, Brian Stockwell, Frank Wilkie


                   “Noosa Shire – different by nature”
Log in to download the original file

2018-11-15 Ordinary Meeting Minutes(PDF, 859KB).pdf · 880 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 42 sections

Section 2

ORDINARY MEETING MINUTES                                                   15 NOVEMBER 2018



1   ATTENDANCE & APOLOGIES

    COUNCILLORS
    Councillor T Wellington, Mayor
    Councillor J Glasgow
    Councillor I Jackson
    Councillor J Jurisevic
    Councillor F Pardon
    Councillor B Stockwell

    EXECUTIVE
    B de Chastel, Chief Executive Officer
    K Contini, Acting Director Community Services
    M Shave, Director Corporate Services
    K Rawlings, Director Environment & Sustainable Development
    D Iezzi, Director Executive Services
    C Billingham, Director Infrastructure Services

    APOLOGIES
    Councillor F Wilkie, Deputy Mayor


    The meeting commenced at 6.00pm.


2   CONFIRMATION OF MINUTES
    Council Resolution
    Moved:             Cr Glasgow
    Seconded:          Cr Pardon
    The Minutes of the Ordinary Meeting held on 18 October 2018 be received and confirmed.
                                                                                   Carried.


3   MAYORAL MINUTES

    Nil.


4   PETITIONS

    1      PETITION: OBJECTION TO THE REMOVAL OF THE MANGO TREE AT 15
           GARNET STREET COOROY (REFER DEVELOPMENT APPLICATION
           MCU18/0094)
           Council Resolution
           Moved:           Cr Stockwell
           Seconded:        Cr Jurisevic
           That the petition tabled by Cr Stockwell objection to the removal of the mango tree at
           15 Garnet Street Cooroy (refer Development Application MCU18/0094) be received
           and referred to the Chief Executive Officer to determine appropriate action.
                                                                                        Carried.

                                                                                   Page 2 of 43

Section 3

ORDINARY MEETING MINUTES                                                      15 NOVEMBER 2018


     2      PETITION: REQUEST TO CONSIDER EXTENDING THE JET SKI ALLOWABLE
            ZONE WESTWARD FROM THE NOOSA WATERS CANAL INLET TO THE
            TEWANTIN BOAT RAMP FACILITIES
            Council Resolution
            Moved:            Cr Wellington
            Seconded:         Cr Jackson
            That the petition tabled by Cr Wellington requesting that Council consider extending
            the jet ski allowable zone westward from the Noosa Waters canal inlet to the Tewantin
            boat ramp facilities be received and referred to the Chief Executive Officer to determine
            appropriate action.
                                                                                             Carried.


5    NOTIFIED MOTIONS
     Nil.




Council Resolution
Moved:         Cr Wellington
Seconded:      Cr Jurisevic
That the operation of the Standing Orders or any relevant provision thereof, be suspended to allow
Council to consider Item 3 of the General Committee recommendations dated 12 November 2018
and to allow Council to sign the Refugee Council of Australia’s Refugee Welcome Zone
Declaration.
                                                                                         Carried.


3    REFUGEE WELCOME ZONE
     Committee Recommendation
     Moved:             Cr Wellington
     Seconded:          Cr Jackson
     That Council note the report by the Community Development Manager to the Services &
     Organisation Committee Meeting dated 6 November 2018 and agree to declare Noosa Shire
     as a Refugee Welcome Zone by signing The Refugee Council of Australia’s Refugee
     Welcome Zone Declaration.
                                                                                  Carried.


Council Resolution
Moved:         Cr Wellington
Seconded:      Cr Stockwell
That Standing Orders be resumed.
                                                                                            Carried.




                                                                                       Page 3 of 43

Section 4

ORDINARY MEETING MINUTES                                                            15 NOVEMBER 2018


6    CONSIDERATION OF COMMITTEE RECOMMENDATIONS


PLANNING & ENVIRONMENT COMMITTEE RECOMMENDATIONS
6 NOVEMBER 2018 - Crs Brian Stockwell (Chair), Jess Glasgow, Ingrid Jackson, Tony
Wellington
Other Councillors in attendance: Cr Frank Wilkie


The following Recommendations from the Planning & Environment Committee were
adopted without discussion or further amendment.

Council Resolution
Moved:              Cr Stockwell
Seconded:           Cr Glasgow
The Planning & Environment Committee recommendations dated 6 November 2018 be adopted.
                                                                               Carried.



1    MCU17/0005 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
     ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION, AMUSEMENT &
     FITNESS (PAINTBALL), 113 MARARA ST COOROY
     That Council note the report by the Manager Development Assessment to the Planning &
     Environment Committee Meeting dated 6 November 2018 regarding Planning & Environment
     Court Appeal No. D155 of 2018 and agree to defend the appeal.


2    MCU18/0117 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
     INDUSTRIAL BUSINESS TYPE 1, WAREHOUSE AND RETAIL BUSINESS TYPE 7,
     GARDEN CENTRE AT 124 EUMUNDI NOOSA ROAD, NOOSAVILLE
     That Council note the report by the Development Planner to the Planning & Environment
     Committee Meeting dated 6 November 2018 regarding Application No. MCU18/0117 for a
     Development Permit for Material Change of Use for Industrial Business, Type 1 Warehouse
     and Retail Business, Type 7 Garden Centre situated at 124 Eumundi Noosa Rd Noosaville
     Qld and:
     A.     Approve the application in accordance with the following conditions:
            PLANNING
            When Conditions must be Complied With
            1.      Unless otherwise stated, all conditions of this Decision Notice must be complied
                    with prior to the use commencing, and then compliance maintained at all times
                    while the use continues.
            Approved Plans
            2.      Development undertaken in accordance with this approval must generally comply
                    with the approved plans of development. The approved plans are listed in the
                    following table unless otherwise amended by these conditions.
                 Plan No.   Rev.   Plan/Document Name                                      Date
                 A.01              Existing Floor Plan, prepared by Zest Building Design   Plot date
                                                                                           29/08/2018


                                                                                             Page 4 of 43

Section 5

ORDINARY MEETING MINUTES                                                    15 NOVEMBER 2018


         Nature and Extent of Approved Use
         3.    The approved Use Area for the Retail Business Type 7 – Garden Centre is
               182m². This total includes 20% Use Area permitted as part of the industrial
               business.
         4.    The development must not include a café.
         Performance Bond
         5.    Security in the form of a cash bond or trading bank guarantee to the sum of $1500
               must be submitted to Council, to secure performance of all conditions of this
               approval, within 20 days of this approval taking effect. The cash bond or trading
               bank guarantee will be returned on performance of the conditions of approval
               less any costs incurred by Council in respect of enforcing performance of this
               permit. Council reserves the right to call upon the bond or guaranteed sum to
               effect compliance with conditions.
         Landscaping
         6.    Additional plantings must be provided to the 2 gardens located on each side of
               the driveway to the Eumundi Noosa Road. A minimum of 1 feature tree must be
               planted in the north east corner garden and a minimum of 3 feature trees planted
               in the south west garden. The plantings must be in accordance with Council’s
               Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. The feature
               trees must be Acronychia imperforata and have a minimum pot size of 45 litres.
         Car parking
         7.    A minimum of 10 car spaces must be provided on site in accordance with
               AS/NZS2890.1:2004.
    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the Planning Scheme:
         1.    The garden centre is consistent with the Overall Outcomes of the Noosaville
               Locality Code as it is a retail use which is compatible with the surrounding uses
               and generally unsuited to the business centres.
         2.    The proposal will operate in association with the industrial Warehouse with no
               negative impacts on the adjoining uses.
    C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




3   MCU18/0084 REPRESENTATIONS TO DEVELOPMENT PERMIT FOR MATERIAL
    CHANGE OF USE FOR VISITOR ACCOMMODATION TYPE 3 (RURAL CABINS) AT 340
    POMONA KIN KIN ROAD, PINBARREN
    That Council note the report by the Development Planner to the Planning & Environment
    Committee Meeting dated 11 September 2018 regarding representations made to the
    Decision Notice (MCU18/0084) for a Material Change of Use - Visitor Accommodation Type
    3 Rural (Cabins) situated at 340 Pomona Kin Kin Rd, Pinbarren and:
    A.   Agree to change Condition 2 to read as follows:
         Approved Plans
         2.    Development undertaken in accordance with this approval must generally comply
               with the approved plans of development. The approved plans are listed in the
               following table unless otherwise amended by these conditions.



                                                                                      Page 5 of 43

Section 6

ORDINARY MEETING MINUTES                                                       15 NOVEMBER 2018




                Plan No.     Rev.     Plan/Document Name                                 Date
                A1           D        Site Plan, prepared by Jim Morehead Building       04.10.18
                                      Design and Drafting
                A2           C        Site Plan – Aerial View, prepared by Jim
                                      Morehead Building design and Drafting              04.10.18
                A3           C        Part Site Plan, prepared by Jim Morehead
                                      Building design and Drafting                       04.10.18
                                      Floor Plan, provided by Cabin Warehouse
                                      Elevations A & B, provided by Cabin Warehouse
    B.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


4   MCU18/0009 REQUEST FOR NEGOTIATED DECISION NOTICE - PRELIMINARY
    APPROVAL FOR A MATERIAL CHANGE OF USE - MULTIPLE HOUSING - TYPE 3
    RETIREMENT AND SPECIAL NEEDS SITUATED AT 186 COOROY NOOSA ROAD,
    TEWANTIN
    That Council note the report by the Coordinator Planning to the Planning & Environment
    Committee Meeting dated 6 November 2018 regarding representations made to Decision
    Notice MCU18/0009 for a Material Change of Use Multiple Housing –Type 3 Retirement &
    Special Needs situated at 186 Cooroy Noosa Rd Tewantin and:
    A.     Amend the type of approval from a Preliminary Approval for a Material Change of Use
           - Multiple Housing Type 3 - (Retirement & Special Needs) to Development Permit for
           a Material Change of Use - Multiple Housing Type 3 - (Retirement & Special Needs –
           32 beds).
    B.     Agree to change conditions 1, 2, 26, 27 36 and 39 to read:
           1.     Development undertaken in accordance with this approval must generally comply
                  with the approved plans of development. The approved plans are listed in the
                  following table unless otherwise amended by these conditions.
         Plan No.     Rev.   Plan/Document Name                                         Date
         MCU 01 A            Existing Part Site Plan by Middap Architecture             August 2018
         MCU 02 A            Proposed Lower Level Plan by Middap Architecture           August 2018
         MCU 03 A            Proposed Upper Level Plan by Middap Architecture           August 2018
         MCU 04       A      Site Sections by Middap Architecture                       August 2018
         MCU 05       A      Proposed Site Elevations by Middap Architecture            August 2018
         MCU 06       A      Proposed Entry/Café Floor Plan by Middap Architecture      August 2018
         MCU 07       A      Proposed Entry/Café Elevations by Middap Architecture      August 2018
         MCU 08       A      Proposed Villa 1 Floor Plans by Middap Architecture        August 2018
         MCU 09       A      Proposed Villa 1 Floor Elevations by Middap Architecture   August 2018
         MCU 10       A      Proposed Villa 3 Floor Plan by Middap Architecture         August 2018
         MCU 11       A      Proposed Villa 3 Elevations by Middap Architecture         August 2018
         MCU 12       A      Proposed Villa 2 + 4 Floor Plans by Middap Architecture    August 2018
         MCU 13       A      Proposed Villa 2 + 4 Elevations by Middap Architecture     August 2018
           2.     The development must include the following, to the reasonable satisfaction of the
                  Manager, Development Assessment:
                  2.1. Deleted
                  2.2. Car parking must be provided at a rate of 0.92 car spaces per bed. Of
                       these, 0.21 spaces per bed are for event days which must be
                       accommodated on the site, but may be located in temporary areas. The
                       layout must comply with Australian Standard AS/NZS 2890.1-2004 and
                       may include the existing 18 car parking spaces in the road reserve.


                                                                                        Page 6 of 43

Section 7

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


              2.3. Deleted
              2.4. Deleted
              2.5. A minimum landscape setback of 6.0 metres must be provided to all
                   boundaries, apart from existing development, with existing vegetation
                   retained and reinforced in the setbacks to maintain the amenity of adjoining
                   residents and a visual screen to Cooroy Noosa Road.
              2.6. Noise attenuation measures must be incorporated into the building design
                   to mitigate traffic noise impacts from Cooroy Noosa Road. The design
                   criteria for the development must be 63dB(A)L10(18hours)
              2.7. Deleted
        26.   All works must be constructed and work procedures undertaken in accordance
              with:
              a.   The approved plans, the approved amended plans and the conditions
                   detailed in this Decision Notice.
              b.   The document ‘Proposed Cartwright Village Extension – Carramar, Noosa
                   Care Integrated Water Management Plan Version 2 by Callaghan & Toth
                   dated September 2018.
              c.   The document ‘Noosa Care Inc Cartwright Village Extension Carramar,
                   Cooroy Noosa Road, Tewantin Preliminary Design of Stormwater
                   Detention Volume’ by BSM dated 21 December 2017.
              d.   The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24
                   July 2017.
              e.   The Addendum Letter by Cardno (document number WE17064) dated 23
                   March 2018.
              f.   The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01)
                   dated 27 September 2018.
              g.   A minimum Finished Floor Level (FFL) of the Aged Care Facility and any
                   associated facilities at 8.80m AHD.
              h.   A minimum Finished Floor Level (FFL) of the Independent Living Units of
                   8.80m AHD.
              i.   All relevant Noosa Council Planning Scheme Policies, standard drawings,
                   standard specifications and guidelines are to be adhered to.
        27.   An easement for drainage purposes must be registered against the titles of the
              properties in favour of Council over the land area identified as being external to
              the area to be dedicated as Environmental Park and below the post development
              1% AEP flood level on the subject site from flooding sources external to the site
              (excluding proposed structures). The easement width must be in accordance with
              Noosa Council’s Development Design Planning Scheme Policies. The easement
              must be granted at no cost to Noosa Council. The wording of the easement
              documentation must be in accordance with Council’s Standard Easement
              document.
        36.   Prior to obtaining a Development Permit for Operational Works the land area
              identified as being to the east of the proposed wetland fence on Middap
              Architecture Pty Ltd - Plan MCU. 02A. (Proposed Lower Level Plan August 2018)
              be dedicated to Council in fee simple on trust for the purpose of an Environmental
              Park.
              The land to be dedicated is “non-trunk infrastructure” for the purposes of the
              Planning Act 2016.



                                                                                  Page 7 of 43

Section 8

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


         39.   A permanent fence must be constructed along the interface of the development
               site with the land area to be dedicated. The fence must be constructed in
               accordance with an Operational Works approval and must be to the following
               specifications:
               a.   2.1 metre high
               b.   Pool fence with vertical bars at 100mm centres (or similar)
               c.   Educational signage for wetlands protection.
    C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


5   MCU18 0102 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
    VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT 16 MARY
    STREET, NOOSAVILLE
    That Planning & Environment Committee Agenda Item 5 be referred to the General
    Committee due to the significance of the issue.


6   ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT UPDATE - 1ST
    QUARTER 2018-19
    That Council note the report by the Director Environment and Sustainable Development to
    the Planning and Environment Committee Meeting dated 6 November 2018 providing an
    update on operations of the Environment and Sustainable Development Department for the
    period 1 July to 30 September 2018.




                                                                                  Page 8 of 43

Section 9

ORDINARY MEETING MINUTES                                                       15 NOVEMBER 2018


SERVICES & ORGANISATION COMMITTEE RECOMMENDATIONS
6 NOVEMBER 2018 – Crs Joe Jurisevic (Chair), Frank Pardon, Tony Wellington
& Frank Wilkie
Other Councillors in attendance: Crs. Ingrid Jackson and Brian Stockwell


The following Recommendations from the Services & Organisation Committee were
adopted without discussion or further amendment.

Council Resolution
Moved:            Cr Jurisevic
Seconded:         Cr Pardon
The Services & Organisation Committee recommendations dated 6 November 2018 be adopted.
                                                                                Carried.




1    1718T043 PREFERRED SUPPLIER ARRANGEMENT FOR THE HIRE OF PLANT &
     OPERATORS
     That Council note the report by the Civil Operations Manager to the Services & Organisation
     Committee Meeting dated 6 November 2018 and:
     A.     Award the contractors listed in Table 1 within the report as preferred suppliers for plant
            and operator hire pursuant to tender 1718T143; and
     B.     Award the contract for an initial term of up to two (2) years, with an option to extend
            the arrangement for up to three (3) x twelve (12) month periods.



2    NOOSA SPIT SHORELINE EROSION INVESTIGATION - SHORELINE EROSION
     MANAGEMENT PLAN
     That Services & Organisation Committee Agenda Item 2 be referred to the General
     Committee for further consideration.


3    2018 ANNUAL DISASTER AND RECOVERY MANAGEMENT REPORT
     That Council note the report by the Project Officer, Disaster Management and Special
     Projects to the Services & Organisation Committee Meeting dated 6 November 2018
     providing an update on disaster and recovery management activities and thank the members
     of and advisors to the Noosa Local Disaster Management Group for their participation.


4    REFUGEE WELCOME ZONE
     That Services & Organisation Committee Agenda Item 4 be referred to the General
     Committee due to the significance of the issue.




                                                                                        Page 9 of 43

Section 10

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


5    ANNUAL REPORT 2017/18
     That Services & Organisation Committee Agenda Item 5 be referred to the General
     Committee due to the significance of the issue.


6    EXECUTIVE SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2018-19
     That Council note the report by the Director Executive Services to the Services &
     Organisation Committee Meeting dated 6 November 2018 providing an update on operations
     of the Executive Services Department for the period 1 July to 30 September 2018.


7    CORPORATE SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2018-19
     That Council note the report by the Director Corporate Services to the Services &
     Organisation Committee Meeting dated 6 November 2018 providing an update on operations
     of the Corporate Services Department for the period 1 July to 30 September 2018.


8    INFRASTRUCTURE SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2018-19
     That Council note the report by the Director Infrastructure Services to the Services &
     Organisation Committee Meeting dated 6 November 2018 providing an update on operations
     of the Infrastructure Services Department for the period 1 July to 30 September 2018.


9    COMMUNITY SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2018-19
     That Council note the report by the Director Community Services to the Services &
     Organisation Committee meeting dated 6 November 2018 providing an update on the
     operations of the Community Services Department for the period 1 July to 30 September
     2018.


10   OPERATIONAL PLAN PROGRESS REPORT - 1ST QUARTER 2018-19
     That Council note the report by the Chief Executive Officer to the Services & Organisation
     Committee Meeting dated 6 November 2018 providing an update on progress with the
     implementation of the Operational Plan to 30 September 2018 and details of Council’s Key
     Performance Indicators.




                                                                                Page 10 of 43

Section 11

ORDINARY MEETING MINUTES                                                    15 NOVEMBER 2018


GENERAL COMMITTEE RECOMMENDATIONS
12 NOVEMBER 2018 – Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson, Joe
Jurisevic, Frank Pardon and Brian Stockwell, Tony Wellington


2    NOOSA SPIT SHORELINE EROSION INVESTIGATION - SHORELINE EROSION
     MANAGEMENT PLAN
     Council Resolution
     Moved:         Cr Jackson
     Seconded:      Cr Glasgow
     That Council note the report by the Project Coordinator – Flooding, Coastal and Foreshore
     to the Services & Organisation Committee Meeting dated 6 November 2018 and
     A      Support the urgent completion of a Shoreline Erosion Management Plan for Noosa Spit
            and Noosa Main Beach subject to funding being provided in Budget Review 2; and
     B.     Provide a status update to Council on a quarterly basis.
                                                                                          Carried.

The following Recommendations from the General Committee were adopted without
discussion or further amendment.
Council Resolution
Moved:           Cr Jurisevic
Seconded:        Cr Glasgow
The General Committee recommendations dated 12 November 2018 be adopted except where
dealt with or held over by separate resolution.
                                                                            Carried.


1    MCU18/0102 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
     VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT 16 MARY
     STREET, NOOSAVILLE
     That Council note the report by the Coordinator Planning to the Planning & Environment
     Committee Meeting dated 6 November 2018 regarding Application No. MCU18/0102 for a
     Development Permit for Material Change of Use - Visitor Accommodation - Type 4
     Conventional (122 beds) situated at 14-16 Mary Street Noosaville and defer consideration of
     the matter to the Ordinary Meeting dated 15 November to allow staff to bring forward a further
     report with amended conditions of approval to include conditions which approve the height
     of the building as proposed by the applicant, allow operation of the internal pool and café
     area until 10pm at night, that condition the operation to install a sound monitoring system
     and 24hr onsite management to maintain statutory requirements in terms of noise nuisance
     and allow Council the opportunity to review compliance of that noise condition in 12 months,
     and reduce the extent of acoustic fencing.


4    ANNUAL REPORT
     That Council note the report by the Director Executive Services to the Services &
     Organisation Committee Meeting dated 6 November 2018 and:
     A.     Adopt the ‘2017/18 Annual Report’ (provided at Attachment 1 to the report)
            incorporating the 2017/18 Audited Financial Statements; and
     B.     Authorise the Chief Executive Officer to make any required minor amendments to the
            document prior to publication.

                                                                                    Page 11 of 43

Section 12

ORDINARY MEETING MINUTES                                                                             15 NOVEMBER 2018


5                      FURTHER REPORT MCU18/0094 DEVELOPMENT APPLICATION FOR MATERIAL
                       CHANGE OF USE, MULTIPLE HOUSING TYPE 4 (4 DWELLING UNITS), 15 GARNET
DOMENT INFORM AT ION
                       STREET, COOROY
                       That Council note the further report by the Development Planner to the General Committee
                       Meeting dated 12 November 2018 regarding Application No. MCU18/0094 for a
                       Development Permit for Material Change of Use for Multiple Housing - Type 4 Conventional.
                       (4 Dwelling Units) situated at 15 Garnet St, Cooroy and approve the application in
                       accordance with following the conditions:
                       PLANNING
                       When Conditions must be Complied With
                       1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with
                               prior to the use commencing, and then compliance maintained at all times while the
                               use continues.
                       Approved Plans
                       2.      Development undertaken in accordance with this approval must generally comply with
                               the approved plans of development. The approved plans are listed in the following table
                               unless otherwise amended by these conditions.
                            Plan No.   Rev.   Plan/Document Name                                         Date
                            A10        G      Ground – Site Plan, drawn by Morriarchi Architecture       29 October 2018
                            A11        F      Level 1 – Roof – Site Plan, drawn by Morriarchi            29 October 2018
                                              Architecture
                            A12        C      Townhouse Type A (3 bed) – Floor Plans, drawn by           3 July 2018
                                              Morriarchi Architecture
                            A13        C      Townhouse Type B (2 bed) – Floor Plans, drawn by           3 July 2018
                                              Morriarchi Architecture
                            A14        B      Landscape Plan, drawn by Morriarchi Architecture           29 October 2018
                            A20        F      Elevations, drawn by Morriarchi Architecture               30 October 2018
                            A30        F      Sections, drawn by Morriarchi Architecture                 29 October 2018
                            A80        G      Perspective Images, drawn by Morriarchi Architecture       30 October 2018
                            A81        B      Finishes                                                   30 October 2018
                       Nature and Extent of Approved Use
                       3.      This approval is for 1 x 3 bedroom unit and 3 x 2 bedroom units. The TV/Study room
                               is not permitted to be fully enclosed for use as a bedroom.
                       Building Height
                       4.      The maximum height of the development must not exceed 8 metres above the finished
                               ground level and the natural ground level.
                       Performance Bond
                       5.      Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
                               must be submitted to Council, to secure performance of all conditions of this approval,
                               prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
                               performance of the conditions of approval less any costs incurred by Council in respect
                               of enforcing performance of this permit. Council reserves the right to call upon the bond
                               or guaranteed sum to effect compliance with conditions.
                       Street Identification
                       6.      The street address of the development must be clearly visible and discernible from the
                               primary frontage of the site by the provision of a street number and, where appropriate,
                               the building name.

                                                                                                          Page 12 of 43

Section 13

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


    Building Appearance
    7.    All air conditioning units or other mechanical equipment must be located at ground
          level, or otherwise fully enclosed or screened such that they are not visible from the
          street frontages nor adjoining properties.
    Fencing and Walls
    8.    Any street fencing must be set back an average of 1 metre from the front property
          boundary. Any fencing on the front boundary must either:
          a.   not exceed a maximum height of 1.2m
          b.   be of open construction.
    9.    The area of land between the fence and the front property boundary must be densely
          landscaped to screen any fencing from the street.
    Clothes Drying Areas
    10.   Each dwelling unit must be provided with access to an outdoor clothes line which is
          screened from public view.
    Protection of Privacy
    11.   To ensure privacy is protected between adjoining properties, the windows located on
          the upper western building face of the building must either:
          a.   have a minimum window sill height or 1.5 metres above floor level;
          b.   be fitted with translucent glazing;
          c.   be fitted with a fixed external screen.
    12.   Any proposed Community Management Statement required for the development
          pursuant to the Body Corporate and Community Management Act 1997 must be
          submitted to Council for endorsement at the same time as submission of the Building
          Format Plan (or similar) to Council for compliance assessment.
    13.   All clauses and by-laws of the proposed Community Management Statement must
          accord with the requirements of this Decision Notice.
    Retention of mango tree
    14.   The existing mango tree located in the north eastern corner on the site must be
          retained.
    15.   An Arborist Report (or part thereof) prepared by a qualified person* and endorsed
          through an Operational Works approval must provide recommendations for the design
          of civil works, including retaining walls, to accommodate the retention of the Mango
          tree.
    16.   The Mango tree identified for retention in the conditions of this approval must be
          maintained in good health during construction and operational use for the expected life
          of the tree.
          *(Refer to Advisory Note)
    Landscaping Works
    17.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and the Noosa Plan Planning Scheme
          Policy PSP 3 – Landscaping Plants and Guidelines and must include in particular:
          a.   The works shown on the approved Landscape Concept Plan using predominately
               local native species;



                                                                                  Page 13 of 43

Section 14

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


          b.   The provision of 6 x 100L local native street trees to the road frontages suitable
               for the location and sight lines.
          c.   Retention of the mango tree within the north eastern corner of the lot within a
               mulched garden setting.
    18.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures healthy,
          sustained and vigorous plant growth. All plant material must be allowed to grow to full
          form and be refurbished when its life expectancy is reached.
    19.   All landscape works must be maintained generally in accordance with the approved
          design for the life of the development.
    ENGINEERING
    External Works
    20.   A 2.0m wide concrete footpath must be provided within the road verge for the entire
          length of the frontage of the site to Wattle Street. The path must generally match with
          the existing grassed verge without causing a trip hazard. The works must be
          undertaken in accordance with an Operational Works approval and must
          include/address the following:
          a.   Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
               Construction Details;
          b.   Be extended to smoothly tapered and join with the existing path along Garnet
               Street.
    Reinstatement Works
    21.   Any redundant driveway and/or kerb layback must be removed, and the kerb line and
          verge area reinstated and landscaped to match the existing kerb and/or verge
          treatments. Grassed verge areas to be reinstated must be provided with 100 mm
          topsoil and turf, and must be maintained by the developer until established.
    22.   Any redundant private pathway to the property must be removed, and verge area
          reinstated and landscaped to match the verge treatments.
    23.   Any damaged kerb and channel along the frontage of the site must be repaired to the
          reasonable satisfaction of Council’s representative.
    Site Access and Driveways
    24.   A sealed access driveway must be provided from Garnet Street to all parking and
          manoeuvring areas of the development. The works must be undertaken in accordance
          with an Operational Works approval and must include in particular:
          a.   Driveway crossovers in accordance with IPWEAQ standard drawings R-049 and
               R-050 to grades prevent vehicles from scraping and/or bottoming whilst also
               allowing for compliant grades for the footpath and pedestrians movements along
               the footpath and the grassed verge without any step or trip hazard.
    Car Parking
    25.   Car parking must be provided within the site generally as shown on the approved plans.
          The works must be undertaken in accordance with an Operational Works approval and
          must be in compliance with the provisions of AS/NZS 2890.1-2004 with allowance for
          standard vehicle to enter and leave the site in a forward gear and with a minimum head
          clearance (headroom) at any point of 2.2m.
    26.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.


                                                                                  Page 14 of 43

Section 15

ORDINARY MEETING MINUTES                                                                          15 NOVEMBER 2018


                         Stormwater Drainage
                         27.   The site must be provided with a stormwater drainage system connecting to a lawful
                               point/s of discharge in Garnet Street and/or Wattle Street. The works must be
                               undertaken in accordance with an Operational Works approval in compliance with the
                               relevant sections of Queensland Urban Drainage Manual and supported by a detailed
                               stormwater drainage design prepared and certified by a suitably qualified and
                               experienced Registered Professional Civil Engineer (RPEQ).
                         28.   The development of the site must not worsen existing drainage conditions on other
                               properties by diverting stormwater runoff or cause additional stormwater ponding on
                               any other property.
                         29.   Stormwater runoff from the development must be disposed of on-site without causing
                               scour or damage to the subject site or any adjoining property.
                         Earthworks and Retaining Walls
                         30.   All earthworks must be carried out in compliance with an Operational Works
                               Development Permit.
                         31.   All earthworks and associated batters/retaining walls must be contained entirely within
                               the subject site unless written permission from the respective landowner(s) is provided
                               to Council.
                         32.   All earthworks must be undertaken in accordance with the provisions of Australian
                               Standard AS3798: Guidelines on Earthworks for Commercial and Residential
                               Developments, Council’s codes and relevant government regulations and guidelines.
                               Certification must be provided by an RPEQ and submitted to Council prior to the issue
                               of the Certificate of Classification for the building.
                         33.   The development works must not adversely impact on the stability of the subject site,
                               any other property or private/ public structure and the long term health of the existing
                               mango tree as shown on the landscape plan A14 Rev B.
                         34.   Earthworks and development works carried out on site must not affect the structural
                               integrity of any of the existing fences or structures that border the site. Fences that are
                               affected shall be replaced prior to the Building Certifier issuing the Certificate of
                               Classification.
                         Telecommunication Services
                         35.   Unless otherwise stipulated by telecommunications legislation at the time of
                               construction, the development must be provided with all necessary conduits, pits and
                               pipes to accommodate the future connection of optic fibre technology
                               telecommunications.


6                        132007.2446.03 REQUEST TO CHANGE AN EXISTING APPROVAL FOR MATERIAL
                         CHANGE OF USE FOR VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL
                         (HOSTEL ACCOMMODATION) AT 102 AND 106 PACIFIC AVENUE SUNSHINE BEACH
DOCUMENT INFORM AT ION




                         That Council note the report by the Coordinator Planning to the General Committee Meeting
                         dated 12 November 2018 regarding Application No. 132007.2446.03 to make a change to
                         an existing approval for Material Change of Use for Visitor Accommodation Type 4
                         Conventional (Hostel Accommodation) - additional 21 beds situated at 102 and 106 Pacific
                         Ave, Sunshine Beach and:
                         A.    Approve the change.
                         B.    Include the following additional conditions:



                                                                                                          Page 15 of 43

Section 16

ORDINARY MEETING MINUTES                                                        15 NOVEMBER 2018


        When Conditions must be Complied With
        64.   Unless otherwise stated, all conditions of this Decision Notice must be complied
              with prior to the use commencing, and then compliance maintained at all times
              while the use continues.
        Approved Plans
        65.   Development undertaken in accordance with this approval must generally comply
              with the approved plans of development. The approved plans are listed in the
              following table unless otherwise amended by these conditions.
         Plan No.        Rev.     Plan/Document Name                                 Date
         18101-01        P        Site Plan, by PJ concepts and design               09.07.2018
         18101-02        P        Landscape Plan, by PJ concepts and design          09.07.2018
         18101-03        P        Floor Plan – Lot 106, by PJ concepts and design    09.07.2018
         18101-04        P        Elevations –Sheet 1, by PJ concepts and design     09.07.2018
                                  Noise barrier plan
        Nature and Extent of Approved Use
        66.   An additional 21 beds are approved for the Visitor Accommodation Type 4 –
              Conventional (visitor hostel). The total number of beds approved are 69 and one
              manager’s unit.
        67.   The approved accommodation units must be used for short term visitors only.
              The approved units must not be occupied by persons for the purpose of
              permanent accommodation.
        68.   Amplified music must not be audible at the boundaries of the site between 10pm
              and 7am.
        Landscaping
        69.   The development site must be landscaped. The works must be undertaken in
              accordance with an Operational Works approval, the Planning Scheme Policy 3
              Landscaping Plants and Guidelines for Sunshine Beach and must include in
              particular:
              a.    the works generally shown on the approved site plan including:
                    i.          A minimum 1.0 metre wide landscaping strip along the northern side
                                boundary of the subject site, exclusive of the access driveway,
                                generally uncompromised by infrastructure items designed such that
                                vegetated screening will be provided within 3 years of the plantings
                                occurring.
                    ii.         A minimum 2.0 metre wide landscaping strip along the full extent of
                                the eastern boundary designed such that vegetated screening will be
                                provided within 3 years of the plantings occurring.
                    iii.        Vegetated screening of any electrical transformers, bin storage areas
                                and the like from the road frontage
                    iv.         Provision of 1 street tree within the road reserve for every 8 metres
                                of road frontage including landscaping to the crossover works
                    v.          Trees on the northern boundary must be retained to provide visual
                                screening of the development. Where civil works impact on the
                                capacity to retain the tree, the tree may be removed and replaced
                                with a tree of a minimum pot sized 100 litres.
        70.   All landscape works must be established and maintained in accordance with the
              approved design for the life of the development, and in a manner that ensures
              healthy, sustained and vigorous plant growth. All plant material must be allowed
              to grow to full form and be refurbished when its life expectancy is reached.

                                                                                      Page 16 of 43

Section 17

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


        Performance Bond
        71.   Security in the form of a cash bond or trading bank guarantee to the sum of
              $10,000 must be submitted to Council, to secure performance of all conditions of
              this approval, prior to the issue of a Development Permit for Operational Works.
              The cash bond or trading bank guarantee will be returned on performance of the
              conditions of approval less any costs incurred by Council in respect of enforcing
              performance of this permit. Council reserves the right to call upon the bond or
              guaranteed sum to effect compliance with conditions.
        Water & Sewer Connections
        72.   An underground connection to reticulated water and sewerage must be provided
              to the development site in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
        73.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
              (Unitywater) must be submitted to Council that certifies an underground
              connection to reticulated water and sewerage has been provided to the
              development site.
        Building Appearance
        74.   All air conditioning units or other mechanical equipment must be located at
              ground level, or otherwise fully enclosed or screened such that they are not
              visible from the street frontages nor adjoining properties.
        75.   All deck and balcony areas above ground floor must not be enclosed by
              permanent fixtures such as shutters, louvres, glass panelling or the like, except
              where required to satisfy any privacy condition of this Decision Notice.
        Advertising Devices
        76.   Advertising devices must comply with the requirements of the Advertising
              Devices Code.
        77.   Construction signage, including that on hoardings, shade cloth and cranes but
              not including statutory safety signage, shall not exceed a total of 4m2 to each of
              the site’s street frontages.
        Fencing and Walls
        78.   Any street fencing must be setback an average of 1 metre from the front property
              boundary. Any fencing on the front boundary must either:
              a.   not exceed a maximum height of 1.2m
              b.   be of open construction.
        79.   The area of land between the fence and the front property boundary must be
              densely landscaped to screen any fencing from the street.
        Clothes Drying Areas
        80.   Each rooming unit must be provided with access to an outdoor clothes line which
              is screened from public view.
        Protection of Privacy
        81.   To ensure privacy is protected between adjoining properties, any window/s, deck
              or the like that overlooks or has the potential to overlook the private open space
              or habitable room windows of neighbouring properties must either:
              a.   have a minimum window sill height or 1.5 metres above floor level
              b.   be fitted with translucent glazing
              c.   be fitted with a fixed external screen


                                                                                 Page 17 of 43

Section 18

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


        Communal Recreation Areas
        82.   Communal recreation area/s must be provided as shown on the approved plans.
        Amalgamation of Lots
        83.   Lot 164 on RP 94566 and Lot 163 on RP 897370 must be amalgamated prior to
              the commencement of use.
        ENVIRONMENTAL HEALTH
        Amenity
        84.   The development must be undertaken and operated in a manner that causes no
              detrimental effect upon the amenity of the neighbourhood by reason of the
              creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants
              (including dust or odours) nuisance or any other emissions in accordance with
              the nuisance provisions of the Environmental Protection Act 1994.
        Noise Nuisance
        85.   Noise emission from mechanical equipment shall comply with the following
              requirements:
              a.    Air-conditioning and Refrigeration
                    i.     7am to 10pm: Maximum background + 5dB(A)
                    ii.    10pm to 7am: Maximum background + 3dB(A)
              b.    Pumps
                    i.     7am to 7pm: Maximum background + 5dB(A)
                    ii.    7pm to 10pm: Maximum background + 3dB(A)
                    iii.   10pm to 7am: No audible noise.
        86.   Submission of written certification from a suitably qualified person confirming that
              the noise levels from all mechanical equipment comply when measured at either
              the residential boundary or outside the most exposed part of an affected building,
              whichever is the closest to the equipment.
              The assessment and certification is required immediately after installation of the
              equipment and prior to any occupation of the building, and in a format approved
              by Council. All equipment should be operating at the same time to test the overall
              noise level created.
        87.   Entertainers or speakers used to amplify noise must not be located in any of the
              outdoor recreational areas.
        88.   Prior to the use of the building situated at 106 Pacific Avenue for the purpose of
              visitor accommodation noise barrier fencing must be erected in accordance with
              the approved Noise barrier plan.
        89.   Between the hours of 9pm to midnight the night manager must have the reception
              phone with them. From midnight the phone must be diverted to a security team
              response number.
        90.   The courtyard of the manager’s unit situated at 106 Pacific Avenue must not be
              used between the hours of 9.00pm and 6.00am.
        91.   The pool and associated deck area must not be used between the hours of
              9.00pm and 7.00am.
        Outdoor Lighting Devices
        92.   Lighting associated with the use must be designed, sited, installed and tested to
              comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
              obtrusive effects of outdoor lighting” using a control level of 1.

                                                                                  Page 18 of 43

Section 19

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


        93.   Certification must be submitted to Council from a qualified person which certifies
              that all outdoor lighting devices comply with the requirements of this Decision
              Notice at the time of commissioning.
              For the purpose of certifying outdoor lighting devices for the development, a
              qualified person is:
              a.    Registered Professional Engineer of Queensland;
              b.    an environmental or electrical design consultant with a minimum of 3 years
                    current experience in the field of outdoor lighting.
        WASTE
        94.   The developer must provide waste storage and disposal facilities in accordance
              with Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and
              Commercial and Industrial Premises". The facilities must include an external
              impervious area correctly sized for all refuse and recycling containers and
              suitably screened from public places and neighbouring properties. A bin wash
              area is required with a cold-water tap, hose and drain outlet connected to sewer,
              via a bucket trap. The drain outlet must be designed to prevent storm water entry
              to the sewerage system. This can be achieved with a nib wall 50mm high and up
              to 700mm x 700mm wide (max 0.5m2) , or alternatively the waste area can be
              roofed, or any other design approved by Council.
        95.   Refuse containers must be provided in accordance with the requirements of the
              Environmental Protection (Interim Waste) Regulation 1996 and (Waste
              Management) Regulation 2000, for the storage and collection of refuse.
        96.   Bins must be provided throughout the site to reduce littering. All bins provided
              must be for refuse and recycling and be decanted into the bulk bins by the site
              operators.
        ENGINEERING
        Site Access and Driveways
        97.   A sealed access driveway must be provided from Pacific Avenue to all parking
              and manoeuvring areas of the development. The new works proposed to access
              No 106 must be undertaken in accordance with an Operational Works approval
              and must include in particular:
              a.    a driveway crossover generally in accordance with Council’s Standard
                    Drawings RS-051 and the associated addendum
              b.    the works must match neatly with existing road and verge/footpath
                    features. Additional works beyond the driveway may be required to provide
                    an acceptable transition to existing road and verge/footpath profiles
        Car Parking
        98.   A minimum of an additional 2 car parking spaces must be provided and marked
              on the site. The works must include dimensions, crossfalls and gradients in
              accordance with Australian Standard AS2890: Parking Facilities for the relevant
              user class
        99.   All car parking areas and access driveways must be maintained exclusively for
              vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
        100. Directional signage must be provided to direct visitors and customers to the car
             parking spaces provided on site.
        Pedestrian and Bicycle Facilities
        101. Pedestrian and bicycle facilities must be provided for the development. The

                                                                                 Page 19 of 43

Section 20

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


               works must be undertaken in accordance with an Operational Works approval
               and must include in particular the replacement of the existing bitumen sealed
               path in the frontage of No. 106 Pacific Avenue with a concrete path and must
               extend to the existing driveway in the frontage of 108 Pacific Avenue. The new
               path must be the same width as the existing path.
         Stormwater Drainage
         102. Stormwater runoff from the development must be connected to the existing
              stormwater drainage systems within the sites.
         Damage to Services and Assets
         103. Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
               a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                     immediately; or
               b.    where otherwise, upon completion of the works associated with the
                     development.
         Any repair work which proposes to alter the alignment or level of existing services and
         assets must first be referred to the relevant service authority for approval.
    C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


7   FINANCIAL PERFORMANCE REPORT - OCTOBER 2018
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 12 November 2018 outlining October 2018 year to date financial performance
    against budget.


8   BUDGET REVIEW 2 (BR2) FOR THE 2018/19 FINANCIAL YEAR
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 12 November 2018 and approve the proposed changes to the budget for the
    2018/19 financial year as outlined in the Revised Budget Financial Statements attached to
    the report.




                                                                                 Page 20 of 43

Section 21

ORDINARY MEETING MINUTES                                                        15 NOVEMBER 2018


7   ORDINARY MEETING REPORTS

1   FURTHER REPORT MCU18/0102 DEVELOPMENT APPLICATION FOR MATERIAL
    CHANGE OF USE VISITOR ACCOMMODATION TYPE 4 (122 BEDS), 14–16 MARY
    STREET, NOOSAVILLE
    Motion
    Moved:           Cr Wellington
    Seconded:        Cr Pardon
    That Council note report by the Development Planner to the Planning and Environment
    Committee dated 6 November 2018 and the further report to the Ordinary Meeting dated 15
    November 2018 regarding Application No. MCU18/0102 for a Development Permit for
    Material Change of Use for Visitor Accommodation - Type 4 Conventional (122 beds) situated
    at 14–16 Mary Street, Noosaville and
    A.   Approve the application in accordance with following the conditions:
         PLANNING
                When Conditions must be Complied With
         1.     Unless otherwise stated, all conditions of this Decision Notice must be complied
                with prior to the use commencing, and then compliance maintained at all times
                while the use continues.
                Approved Plans
         2.     Development undertaken in accordance with this approval must generally comply
                with the approved plans of development. The approved plans are listed in the
                following table unless otherwise amended by these conditions.
          Plan       Rev.       Plan/Document Name                                    Date
          No.
          A.01       B          Site Plan, by Zest Building Design                    31.07.2018
          A.02       B          Basement Floor Plan, by Zest Building Design          31.07.2018
          A.04       B          Floor Plan – Level 2, by Zest Building Design         31.07.2018
          A.05                  Dimensional Plan – Level 1, by Zest Building Design
          A.06                  Dimensional Plan – Level 2, by Zest Building Design
          A.07       B          Elevations, by Zest Building Design                   31.07.2018
          A.08       B          Elevations, by Zest Building Design                   31.07.2018
          A.09       B          Building Sections, by Zest Building Design            31.07.2018
          A.015      A          Roof Plan, by Zest Building Design                    31.07.2018
         3.     Development authorised by this approval must be undertaken generally in
                accordance with the Approved Plans listed within this Decision Notice. The
                Approved Plans must be amended to incorporate the amendments listed within
                this Decision Notice and resubmitted to Council prior to the issue of any
                Development Permit for Operational Works*
                a.       The southern pavilion must be reduced in height so that the main entry roof
                         does not exceed 8.80 metres above both finished and natural ground
                         levels.
                b.       With the exception of the main entry roof of the southern pavilion the
                         maximum height of the development must not exceed 8.40 metres above
                         finished and natural ground level.
                c.       A minimum 600mm eaves must be provided to the full extent of all
                         buildings.
                d.       The northern elevation must include variation of colours and materials to
                         provided increased articulation.

                                                                                       Page 21 of 43

Section 22

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


              e.   The length of the 2.0 metre high acoustic fence on the western boundary
                   must be extended for the full length of the western boundary. A 2.0 metre
                   high acoustic fence must be installed for the full length of the northern
                   boundary. All acoustic fencing must be constructed to a minimum of
                   10kg/m2.
              f.   Windows to guest rooms on the upper level of the western and northern
                   elevations must achieve minimum acoustic rating Rw 32 and the rooms
                   must be provided with airconditioning/mechanical ventilation to allow
                   internal amenity to be maintained whilst windows are closed to contain
                   noise.
              g.   All buildings must have a roof pitch of at least 5 degrees.
              h.   No retaining walls or planter beds are to be constructed in the road reserve.
              *(Refer to Advisory Note)
        Nature and Extent of Approved Use
        4.    122 beds are approved for the Visitor Accommodation Type 4 – Conventional
              (visitor hostel). The approved Gross Floor Area is 1084m2. No pavilion may
              exceed 300m2 of Gross Floor Area.
        5.    The approved accommodation units must be used for short term visitors only.
              The approved units must not be occupied by persons for the purpose of
              permanent accommodation.
        6.    The café must not operate outside the hours of 7am to 9pm.
        7.    Use of the pool/sundeck area must not occur outside of the hours of 7am to 9pm.
        8.    The café, pool and sundeck must only be available for the residents of the visitor
              accommodation use and must not permitted for use by persons not staying in the
              visitor hostel.
        9.    Service vehicle movements on the premises (including loading and unloading)
              must not occur outside the hours of 7am to 6pm Monday to Saturday and not at
              all on Sunday or public holidays.
        10.   Amplified music must not be audible at or beyond the boundaries of the site
              between 10pm and 7am.
        11.   A receptionist/manager must be on-site at all times.
        Building Height
        12.   The maximum height of the southern pavilion must not exceed 8.80 metres above
              the finished ground level and the natural ground level. All other pavilions must
              not exceed 8.40 metres above the finished ground level and the natural ground
              level.
        13.   Certification must be submitted to Council from a Licensed Surveyor which
              certifies that the buildings do not exceed the maximum height requirement of this
              Decision Notice.
        Landscaping
        14.   The development site must be landscaped. The works must be undertaken in
              accordance with an Operational Works approval, the Planning Scheme Policy 3
              Landscaping Plants and Guidelines for that specific area and must include in
              particular:
              a.   the works shown on the approved site plan.



                                                                                 Page 22 of 43

Section 23

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


              b.   a minimum 2.0 metre wide landscaping strip along the Mary Street road
                   frontage of the subject site, exclusive of the access driveway, generally
                   uncompromised by infrastructure items.
              c.   A minimum 1.5 metre wide landscaping strip along the full extent of the
                   eastern and western boundaries.
              d.   a 3.0 metre wide vegetated screening of northern elevation of the northern
                   pavilion from the adjoining properties in Anne Street, designed such that
                   vegetated screening will be provided within 3 years of the plantings
                   occurring.
              e.   vegetated screening of the acoustic barrier adjacent to the western
                   boundary in accordance with the conditions of this Decision Notice
              f.   vegetated screening of any electrical transformers, bin storage areas and
                   the like from the road frontage
              g.   provision of 1 street tree within the road reserve for every 8 metres of road
                   frontage
        15.   All landscape works must be established and maintained in accordance with the
              approved design for the life of the development, and in a manner that ensures
              healthy, sustained and vigorous plant growth. All plant material must be allowed
              to grow to full form and be refurbished when its life expectancy is reached.
              Performance Bond
        16.   Security in the form of a cash bond or trading bank guarantee to the sum of
              $20,000 must be submitted to Council, to secure performance of all conditions of
              this approval, prior to the issue of a Development Permit for Operational Works.
              The cash bond or trading bank guarantee will be returned on performance of the
              conditions of approval less any costs incurred by Council in respect of enforcing
              performance of this permit. Council reserves the right to call upon the bond or
              guaranteed sum to effect compliance with conditions.
              Street Identification
        17.   The street address of the development must be clearly visible and discernible
              from the primary frontage of the site by the provision of a street number and,
              where appropriate, the building name.
        18.   The building entrance or reception area must be clearly visible and identifiable
              from the street or otherwise provided with signage and lighting at strategic
              locations to direct people to the building entrance.
              Water & Sewer Connections
        19.   An underground connection to reticulated water and sewerage must be provided
              to the development site in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
        20.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
              (Unitywater) must be submitted to Council that certifies an underground
              connection to reticulated water and sewerage has been provided to the
              development site.
              Building Appearance
        21.   All air conditioning units or other mechanical equipment must be located at
              ground level, or otherwise fully enclosed or screened such that they are not
              visible from the street frontages nor adjoining properties.



                                                                                Page 23 of 43

Section 24

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


        22.   All deck and balcony areas above ground floor must not be enclosed by
              permanent fixtures such as shutters, louvres, glass panelling or the like, except
              where required to satisfy any privacy condition of this Decision Notice.
              Advertising Devices
        23.   Advertising devices must comply with the requirements of the Advertising
              Devices Code.
        24.   Construction signage, including that on hoardings, shade cloth and cranes but
              not including statutory safety signage, shall not exceed a total of 4m2 to each of
              the site’s street frontages.
              Fencing and Walls
        25.   Any street fencing must be setback an average of 1 metre from the front property
              boundary. Any fencing on the front boundary must either:
              a.   not exceed a maximum height of 1.2m
              b.   be of open construction.
        26.   The area of land between the fence and the front property boundary must be
              densely landscaped to screen any fencing from the street.
        Clothes Drying Areas
        27.   Each rooming unit must be provided with access to an outdoor clothes line which
              is screened from public view.
        Protection of Privacy
        28.   To ensure privacy is protected between adjoining properties, any window/s, deck
              or the like that overlooks or has the potential to overlook the private open space
              or habitable room windows of neighbouring properties must either:
              a.   have a minimum window sill height or 1.5 metres above floor level
              b.   be fitted with translucent glazing
              c.   be fitted with a fixed external screen
              Communal Recreation Areas
        29.   Communal recreation area/s must be provided as shown on the approved plans.
              Amalgamation of Lots
        30.   Lots 3 and 4 on RP 122928 must be amalgamated prior to the commencement
              of use.
              ENVIRONMENTAL HEALTH
              Amenity
        31.   The development must be undertaken and operated in a manner that causes no
              detrimental effect upon the amenity of the neighbourhood by reason of the
              creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants
              (including dust or odours) nuisance or any other emissions in accordance with
              the nuisance provisions of the Environmental Protection Act 1994.
              Noise Nuisance
        32.   Noise emission from mechanical equipment shall comply with the following
              requirements:
              a.   Air-conditioning and Refrigeration
                   i.    7am to 10pm: Maximum background + 5dB(A)

                                                                                 Page 24 of 43

Section 25

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


                    ii.    10pm to 7am: Maximum background + 3dB(A)
              b.    Pumps
                    i.     7am to 7pm: Maximum background + 5dB(A)
                    ii.    7pm to 10pm: Maximum background + 3dB(A)
                    iii.   10pm to 7am: No audible noise.
        33.   Air conditioning units and swimming pool filtration plant shall be located within
              the undercover carpark.
        34.   Kitchen exhaust points for the development must be located and operated in
              accordance with Australian Standard AS1668.2-2002 “The use of ventilation and
              air-conditioning in buildings” (specifically Section 5.10 – Air Discharges).
        35.   Submission of written certification from a suitably qualified person confirming that
              the noise levels from all mechanical equipment comply when measured at either
              the residential boundary or outside the most exposed part of an affected building,
              whichever is the closest to the equipment.
              The assessment and certification is required immediately after installation of the
              equipment and prior to any occupation of the building, and in a format approved
              by Council. All equipment should be operating at the same time to test the overall
              noise level created.
        36.   Entertainers or speakers used to amplify noise must not be located in any outdoor
              area of the site including recreational areas (pool, space sundeck, and sun
              lounges, multi-purpose/flexible lounge/outside deck).
        Outdoor Lighting Devices
        37.   Lighting associated with the use must be designed, sited, installed and tested to
              comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
              obtrusive effects of outdoor lighting” using a control level of 1.
        38.   Certification must be submitted to Council from a qualified person which certifies
              that all outdoor lighting devices comply with the requirements of this Decision
              Notice at the time of commissioning.
              For the purpose of certifying outdoor lighting devices for the development, a
              qualified person is:
              a.    Registered Professional Engineer of Queensland;
              b.    an environmental or electrical design consultant with a minimum of 3 years
                    current experience in the field of outdoor lighting.
              Building Demolition/Removal/Relocation
        39.   Where the development involves the removal, relocation or demolition of a
              building, a Waste Management Plan (construction and demolition) in accordance
              with Planning Scheme Policy 11, Waste Management Plans must be submitted
              and approved by Council’s Environmental Health Officer prior to issue of a
              development permit for operational works for demolition, removal or relocation of
              any building other than a shed.
              The purpose of the Waste Management Plan is to facilitate the segregation of
              waste for the effective reuse and recycling of such materials. Segregated wastes
              attract significantly reduced disposal fees at the landfill with some items free.
              Higher gate fees are charged for mixed waste.
              Waste storage areas must provide adequate separation of all reusable,
              recyclable and waste materials. These must be located so that they are
              convenient and safe to use.


                                                                                  Page 25 of 43

Section 26

ORDINARY MEETING MINUTES                                              15 NOVEMBER 2018


            The Plan must contain the following information:
            a.    The site area for the storage and separation of waste is to be shown on the
                  plan drawings accompanying the application.
            b.    A waste management table as indicated below is to be completed showing
                  how waste material is to be segregated - recycled – reused or disposed.
            c.    Table – Waste Management Table
                  MATERIALS ON-SITE                          DESTINATION
                                                  Re-use and Recycling           Disposal
             Expected waste     Estimated    On-site          Off-site        *specify
             materials          volume(m³)   *specify         *specify        contractor and
                                             proposed re-use contractor       landfill site or
                                             or on-site       and recycling   other disposal
                                             recycling        outlet          site
                                             methods
             Excavation
             material
             Green waste
             Bricks
             Concrete
             Timber-please
             specify
             Plasterboard
             Metals - please
             specify
             Asbestos
             Other - please
             specify
            Note *If a demolition contractor is undertaking works, then the Waste
            Management table is to be completed by the demolition contractor.
            WASTE
            40.   The developer must provide waste storage and disposal facilities in
                  accordance with Planning Scheme Policy No. 9 "Waste Management Multi-
                  Dwellings and Commercial and Industrial Premises". The facilities must
                  include an external impervious area correctly sized for all refuse and
                  recycling containers and suitably screened from public places and
                  neighbouring properties. A bin wash area is required with a cold-water tap,
                  hose and drain outlet connected to sewer, via a bucket trap. The drain
                  outlet must be designed to prevent storm water entry to the sewerage
                  system. This can be achieved with a nib wall 50mm high and up to 700mm
                  x 700mm wide (max 0.5m2) , or alternatively the waste area can be roofed,
                  or any other design approved by Council.
            41.   Refuse containers must be provided in accordance with the requirements
                  of the Environmental Protection (Interim Waste) Regulation 1996 and
                  (Waste Management) Regulation 2000, for the storage and collection of
                  refuse.
            42.   Bins must be provided throughout the site to reduce littering. All bins
                  provided must be for refuse and recycling and be decanted into the bulk
                  bins by the site operators.
            ENGINEERING
            Site Specific Conditions
            43.   The proposed flood barrier must be of a design that is activated by the

                                                                              Page 26 of 43

Section 27

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


                  rising flood levels and the associated hydraulic differential to raise and
                  lower the barrier. The barrier must not require a power supply or human
                  intervention. The barrier must be maintained by the property owner in
                  accordance with the manufacturer’s specifications. The works must be
                  undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   Certification from a Registered Professional Engineer of Queensland
                       (RPEQ) that states that the design of the barrier is suitable for its
                       intended use.
            44.   The development must include an internal stairwell connecting the
                  basement level to the upper floor. The stairwell must be located and
                  constructed to provide an escape route for people to evacuate the
                  basement in the event the barrier and/or pump system fails. Plans
                  submitted as part of any subsequent operational works and building permit
                  must clearly indicate the stairwell.
            External Works
            45.   Mary Street must be upgraded for the length of its frontage to the subject
                  site. The works must be generally in accordance with drawing number
                  17699-SK100 Revision A prepared by TOD Engineers and Project
                  Managers dated 17 August 2018. The works must be undertaken in
                  accordance with an Operational Works approval and must include in
                  particular:
                  a.   construction of new kerb and channelling offset 7.5m (3.5m lane and
                       4m of cycle lane/parallel parking) from the northern side of the
                       existing landscaped median;
                  b.   suitable transitions from the new kerb line to join with the existing
                       kerb at the western and eastern end;
                  c.   landscaping of the verge area;
                  d.   construction of a pedestrian footpath in accordance with the
                       conditions of this Decision Notice;
                  e.   removal of the existing property accesses and reinstatement of the
                       kerb, footpath and verge area to match the balance of the site
                       frontage, including the provision of topsoil and turf where the existing
                       verge is grassed.
            Condition 45 is imposed pursuant to s145 of the Planning Act 2016 being non-
            trunk infrastructure.
            Site Access and Driveways
            46.   A sealed access driveway must be provided from Mary Street to all parking
                  and manoeuvring areas of the development. The works must be
                  undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   driveway crossovers generally in accordance with Council’s Standard
                       Drawing Number RS-051 and any associated addendum.
                  b.   suitable safety measures, including warning signage, to improve
                       driver awareness of the flood barrier, service vehicles and
                       pedestrians and to enhance driver and pedestrian safety. Warning
                       signage must be provided near the exit ramp from the underground
                       parking area and the guest/service area to warn motorists of
                       pedestrian movement along the frontage street.

                                                                               Page 27 of 43

Section 28

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


            Car Parking
            47.   A minimum of 17 car parking spaces, inclusive of 1 courtesy bus space,
                  must be provided and marked on the site and made available and
                  accessible at all times while the use is open for business. The works must
                  be undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   13 customer parking spaces (including 4 scooter spaces) within the
                       total, which are clearly marked for that purpose and accessible at all
                       times for visitor use.
                  b.   3 staff parking spaces within the total, which are clearly marked for
                       that purpose.
                  c.   1 courtesy bus space within the total.
                  d.   2 disabled parking space/s within the total.
                  e.   dimensions, crossfalls and gradients in accordance with Australian
                       Standard AS2890: Parking Facilities.
                  f.   Provision of 20 bicycle parking spaces.
            48.   All car parking areas and access driveways must be maintained exclusively
                  for vehicle parking and manoeuvring and kept in a tidy and safe condition
                  at all times.
            49.   Directional signage must be provided to direct visitors and customers to the
                  car parking spaces provided on site.
            Service Vehicles
            50.   Service vehicle parking, manoeuvring and standing spaces must be
                  provided on the site. The works must be undertaken in accordance with an
                  Operational Works approval.
            Pedestrian and Bicycle Facilities
            51.   Pedestrian and bicycle facilities must be provided for the development. The
                  works must be undertaken in accordance with an Operational Works
                  approval and must include in particular:
                  a.   a 2 metre wide footpath within the road verge for the entire length of
                       the site’s frontage to Mary Street.
                  Condition 51 is imposed pursuant to s128 of the Planning Act 2016 being
                  necessary trunk infrastructure identified by Council’s LGIP to service the
                  development.
            Stormwater Drainage
            52.   The site must be provided with a stormwater drainage system connecting
                  to a lawful point of discharge. The works must be undertaken in
                  accordance with an Operational Works approval and must include in
                  particular:
                  a.   the works shown on drawing number 17699-SK101 Revision A
                       prepared by TOD Engineers and Project Managers dated 17 August
                       2018, with the inclusion of the following:
                       i.    The storage tank must have sufficient capacity to cater for the
                             runoff from the driveway in a 1%AEP rain event as a minimum.
                       ii.   A back up power system for the pump that is independent of
                             the mains network.

                                                                               Page 28 of 43

Section 29

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


            Acid Sulfate Soils
            53.   All works must be carried out in accordance with an Acid Sulfate Soil and
                  Groundwater Management Plan for the development prepared by a
                  qualified person* and referenced in a Development Permit for Operational
                  Works. The Acid Sulfate Soil and Groundwater Management Plan must
                  specifically address how lowering of the groundwater level as a result of
                  the works will be avoided.
                  *(Refer to Advisory Note)
            54.   All waters, including stormwater runoff, groundwater seepage and leachate
                  from acid sulfate soils must achieve the following quality prior to release
                  from the site:
                  a.   a pH range of 6.5-8.5 pH units
                  b.   50mg/L maximum total suspended solids concentration
                  c.   0.3mg/L maximum total iron concentration
                  d.   0.2mg/L maximum total aluminium concentration
                  e.   no visible plume at either the point of release from the site or within
                       a waterway
            55.   The basement must be designed and constructed as a water excluding
                  structure in accordance with Australian Standard AS3735 "Concrete
                  Structures for Retaining Liquids" to ensure groundwater does not enter the
                  basement after construction is completed.
            56.   All treated material must undergo verification testing at the rate of one
                  sample per 250m3 throughout the duration of the excavation phase of
                  the development. The verification testing must be undertaken by a
                  qualified person* using the SPOCAS or Chromium Reducible Sulphur
                  testing suite, and the results must be submitted to Council for appraisal.
            Electricity and Telecommunication Services
            57.   Unless otherwise stipulated by telecommunications legislation at the time
                  of construction, the development must be provided with all necessary
                  conduits, pits and pipes to accommodate the future connection of optic fibre
                  technology telecommunications.
            58.   Certification must be submitted to Council from all relevant service
                  providers which certifies that the development has met the requirements of
                  this Decision Notice and all applicable legislation at the time of
                  construction.
            Earthworks and Retaining Walls
            59.   All earthworks must be undertaken in accordance with an Operational
                  Works approval, and contained entirely within the subject site unless
                  written permission from the respective landowner(s) is provided to Council.
            60.   All retaining walls must be designed and constructed in accordance with
                  the planning scheme and must be certified by an RPEQ where exceeding
                  1.0m in height. All retaining walls that are publicly accessible and exceed
                  1.0m in height must be fitted with a commercial grade safety fence.
            Preparation of a Preliminary Construction Management Plan
            61.   A preliminary Construction Management Plan must be submitted with the
                  Operational Works application and must address the following:


                                                                               Page 29 of 43

Section 30

ORDINARY MEETING MINUTES                                                15 NOVEMBER 2018


                   a.   traffic management during all aspects of the construction phase
                        including:
                        i.     a Traffic Management Control Plan in accordance with the
                               Manual of Uniform Traffic Control Devices (MUTCD) detailing
                               all temporary signage and traffic control measures prior to
                               construction
                        ii.    maintenance of safe pedestrian access for the areas affected
                               by the works during and after daily construction has ceased
                        iii.   proposed fencing to the site during the construction phase of
                               the development
                        iv.    approval of the Traffic Management Control Plan by the
                               Department of Transport and Main Roads (DTMR) for any
                               works on State controlled roads
                        v.     provision for worker car parking
                   b.   maintenance and protection of water quality and existing drainage
                        lines through the construction site, through the implementation of
                        appropriate erosion and sediment control measures
                   c.   works programme identifying key components of the works and their
                        respective durations
                   d.   establishment of a communication protocol with the general public,
                        adjoining owners, emergency services and local businesses to
                        advise of agreed construction times, impacts on traffic, services and
                        other relevant issues
                   e.   identification of complaint management procedures including:
                        i.     contact details for the on-site manager
                        ii.    dispute resolution procedures
                   f.   details on the location of external fill/dump sites, the haulage route,
                        type of vehicle to be utilised during filling operations and frequency
                        of usage. NB any damage to the existing road system as a result of
                        haulage operations shall be fully repaired at the applicant’s expense
                   g. it is acknowledged that the preliminary Construction Management
                      Plan will be a draft document requiring finalisation upon appointment
                      of the Principal Contractor employed to construct the works and a
                      final document will be required to be submitted at the Pre-Start
                      Meeting for the project.
             Damage to Services and Assets
             62.   Any damage caused to existing services and assets as a result of the
                   development works must be repaired at no cost to the asset owner at the
                   following times:
                   a.   where the damage would cause a hazard to pedestrian or vehicle
                        safety, immediately; or
                   b.   where otherwise, upon completion of the works associated with the
                        development.
                   Any repair work which proposes to alter the alignment or level of existing
                   services and assets must first be referred to the relevant service authority
                   for approval.
        B.   Note the report is provided in accordance with Section 63(5) of the Planning Act
             2016.


                                                                                Page 30 of 43

Section 31

ORDINARY MEETING MINUTES                                                      15 NOVEMBER 2018


Amendment No. 1
Moved:           Cr Stockwell
Seconded:        Cr Jurisevic
That Condition 3 be amended to read:
3    Development authorised by this approval must be undertaken generally in accordance with
     the Approved Plans listed within this Decision Notice. The Approved Plans must be amended
     to incorporate the amendments listed within this Decision Notice and resubmitted to Council
     prior to the issue of any Development Permit for Operational Works*
     a.    A minimum 600mm eaves must be provided to the full extent of all buildings.
     b.    The northern elevation must include variation of colours and materials to provided
           increased articulation.
     c.    The length of the 2.0 metre high acoustic fence on the western boundary must be
           extended for the full length of the western boundary. A 2.0 metre high acoustic fence
           must be installed for the full length of the northern boundary. All acoustic fencing must
           be constructed to a minimum of 10kg/m2.
     d.    Windows to guest rooms on the upper level of the western and northern elevations
           must achieve minimum acoustic rating Rw 32 and the rooms must be provided with
           airconditioning/mechanical ventilation to allow internal amenity to be maintained whilst
           windows are closed to contain noise.
     e.    All buildings must have a roof pitch of at least 5 degrees.
     f.    No retaining walls or planter beds are to be constructed in the road reserve.
           *(Refer to Advisory Note)
And that an additional item C be included to read:
C.   Note the following reasons for approval with conditions varying from the staff
     recommendation:
     1.    The site has been specifically identified as suitable for the proposed use in the Planning
           Scheme;
     2.    The proposed height of the building is below the maximum suggested by the Probable
           Solution in the Planning Scheme and includes a range of features that are consistent
           with the principles of sustainable design in the sub tropics;
     3.    The scale and form of architecture will positively contribute to the desired look and feel
           of Noosaville and the Mary St streetscape; and
     4.    The conditions can be imposed to ensure onsite management, together with building
           design, can achieve the desired standards to protect the visual and acoustic amenity
           of adjoining and nearby residential premises.
                                                                                       Carried.
Amendment No. 2
Moved:       Cr Stockwell
Seconded     Cr Wellington
That Condition 3 c. be amended as follows:
c.   The length of the 2.0 metre high acoustic fence on the western boundary must be extended
     for the full length of the western boundary. A 2.0 metre high acoustic fence must be installed
     for the full length of the northern boundary and the extent of the eastern boundary adjacent
     to the residential property. All acoustic fencing must be constructed to a minimum of 10kg/m2.
                                                                                            Carried.


                                                                                     Page 31 of 43

Section 32

ORDINARY MEETING MINUTES                                                       15 NOVEMBER 2018


Amendment No. 3
Moved:           Cr Stockwell
Seconded:        Cr Jurisevic
That Conditions 6 and 7 be amended to read:
6.    For the first 12 months of operation the café must not operate outside the hours of 7am to
      10pm. The approved hours will revert to 7am to 9pm at this time unless a written request is
      received and approved by Council to alter the period of approval. In assessing a request
      Council will have regard to any noise monitoring results, any complaints and any other
      relevant matters. The results of the noise monitoring referred to in this Decision Notice must
      be submitted as part of the written request.
7.    For the first 12 months of operation the use of the pool/sundeck area must not occur outside
      of the hours of 7am to 10pm. The approved hours will revert to 7am to 9pm at this time unless
      a written request is received and approved by Council to alter the period of approval. In
      assessing a request Council will have regard to any noise monitoring results, any complaints
      and any other relevant matters. The results of the noise monitoring referred to in this Decision
      Notice must be submitted as part of the written request.
                                                                                             Carried.


Amendment No. 4
Moved:           Cr Stockwell
Seconded:        Cr Glasgow
That Condition 12 be amended to read:
12.   The maximum height of the southern pavilion must not exceed 9.50 metres above the
      finished ground level and the natural ground level.
                                                                                             Carried.


Amendment No. 5
Moved:           Cr Stockwell
Seconded:        Cr Jurisevic
That two additional conditions be included as follows:
Noise Monitoring
63.   A noise monitoring system must be installed which measures noise levels at the boundary
      adjacent to the nearest residential zoned land.
64.   The on-site receptionist/manager must respond and terminate the relevant noise source
      should the noise levels exceed:
      i.     7am to 6pm = 46 dB(A) LAeq,adj,T;
      ii.    6pm to 10pm = 40 dB(A) LAeq,adj,T;
      iii.   10.00pm to 7.00am = 35 dB(A) LAeq,adj,T
                                                                                             Carried.




                                                                                      Page 32 of 43

Section 33

ORDINARY MEETING MINUTES                                                        15 NOVEMBER 2018


    Council Resolution
    Moved:               Cr Wellington
    Seconded:            Cr Pardon
    That Council note report by the Development Planner to the Planning and Environment
    Committee dated 6 November 2018 and the further report to the Ordinary Meeting dated 15
    November 2018 regarding Application No. MCU18/0102 for a Development Permit for
    Material Change of Use for Visitor Accommodation - Type 4 Conventional (122 beds) situated
    at 14–16 Mary Street, Noosaville and
    A.   Approve the application in accordance with following the conditions:
         PLANNING
         When Conditions must be Complied With
         1.     Unless otherwise stated, all conditions of this Decision Notice must be complied
                with prior to the use commencing, and then compliance maintained at all times
                while the use continues.
                Approved Plans
         2.     Development undertaken in accordance with this approval must generally comply
                with the approved plans of development. The approved plans are listed in the
                following table unless otherwise amended by these conditions.
          Plan       Rev.       Plan/Document Name                                    Date
          No.
          A.01       B          Site Plan, by Zest Building Design                    31.07.2018
          A.02       B          Basement Floor Plan, by Zest Building Design          31.07.2018
          A.04       B          Floor Plan – Level 2, by Zest Building Design         31.07.2018
          A.05                  Dimensional Plan – Level 1, by Zest Building Design
          A.06                  Dimensional Plan – Level 2, by Zest Building Design
          A.07       B          Elevations, by Zest Building Design                   31.07.2018
          A.08       B          Elevations, by Zest Building Design                   31.07.2018
          A.09       B          Building Sections, by Zest Building Design            31.07.2018
          A.015      A          Roof Plan, by Zest Building Design                    31.07.2018
         3      Development authorised by this approval must be undertaken generally in
                accordance with the Approved Plans listed within this Decision Notice. The
                Approved Plans must be amended to incorporate the amendments listed within
                this Decision Notice and resubmitted to Council prior to the issue of any
                Development Permit for Operational Works*
                a.       A minimum 600mm eaves must be provided to the full extent of all
                         buildings.
                b.       The northern elevation must include variation of colours and materials to
                         provided increased articulation.
                c.       The length of the 2.0 metre high acoustic fence on the western boundary
                         must be extended for the full length of the western boundary. A 2.0 metre
                         high acoustic fence must be installed for the full length of the northern
                         boundary and the extent of the eastern boundary adjacent to the residential
                         property. All acoustic fencing must be constructed to a minimum of
                         10kg/m2.
                d.       Windows to guest rooms on the upper level of the western and northern
                         elevations must achieve minimum acoustic rating Rw 32 and the rooms
                         must be provided with airconditioning/mechanical ventilation to allow
                         internal amenity to be maintained whilst windows are closed to contain
                         noise.

                                                                                       Page 33 of 43

Section 34

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


              e.    All buildings must have a roof pitch of at least 5 degrees.
              f.    No retaining walls or planter beds are to be constructed in the road reserve.
              *(Refer to Advisory Note)
        Nature and Extent of Approved Use
        4.    122 beds are approved for the Visitor Accommodation Type 4 – Conventional
              (visitor hostel). The approved Gross Floor Area is 1084m2. No pavilion may
              exceed 300m2 of Gross Floor Area.
        5.    The approved accommodation units must be used for short term visitors only.
              The approved units must not be occupied by persons for the purpose of
              permanent accommodation.
        6.    For the first 12 months of operation the café must not operate outside the hours
              of 7am to 10pm. The approved hours will revert to 7am to 9pm at this time unless
              a written request is received and approved by Council to alter the period of
              approval. In assessing a request Council will have regard to any noise monitoring
              results, any complaints and any other relevant matters. The results of the noise
              monitoring referred to in this Decision Notice must be submitted as part of the
              written request.
        7.    For the first 12 months of operation the use of the pool/sundeck area must not
              occur outside of the hours of 7am to 10pm. The approved hours will revert to 7am
              to 9pm at this time unless a written request is received and approved by Council
              to alter the period of approval. In assessing a request Council will have regard to
              any noise monitoring results, any complaints and any other relevant matters. The
              results of the noise monitoring referred to in this Decision Notice must be
              submitted as part of the written request.
        8.    The café, pool and sundeck must only be available for the residents of the visitor
              accommodation use and must not permitted for use by persons not staying in the
              visitor hostel.
        9.    Service vehicle movements on the premises (including loading and unloading)
              must not occur outside the hours of 7am to 6pm Monday to Saturday and not at
              all on Sunday or public holidays.
        10.   Amplified music must not be audible at or beyond the boundaries of the site
              between 10pm and 7am.
        11.   A receptionist/manager must be on-site at all times.
        Building Height
        12.   The maximum height of the southern pavilion must not exceed 9.50 metres above
              the finished ground level and the natural ground level.
        13.   Certification must be submitted to Council from a Licensed Surveyor which
              certifies that the buildings do not exceed the maximum height requirement of this
              Decision Notice.
        Landscaping
        14.   The development site must be landscaped. The works must be undertaken in
              accordance with an Operational Works approval, the Planning Scheme Policy 3
              Landscaping Plants and Guidelines for that specific area and must include in
              particular:
              a.    the works shown on the approved site plan.




                                                                                  Page 34 of 43

Section 35

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


              b.   a minimum 2.0 metre wide landscaping strip along the Mary Street road
                   frontage of the subject site, exclusive of the access driveway, generally
                   uncompromised by infrastructure items.
              c.   A minimum 1.5 metre wide landscaping strip along the full extent of the
                   eastern and western boundaries.
              d.   a 3.0 metre wide vegetated screening of northern elevation of the northern
                   pavilion from the adjoining properties in Anne Street, designed such that
                   vegetated screening will be provided within 3 years of the plantings
                   occurring.
              e.   vegetated screening of the acoustic barrier adjacent to the western
                   boundary in accordance with the conditions of this Decision Notice
              f.   vegetated screening of any electrical transformers, bin storage areas and
                   the like from the road frontage
              g.   provision of 1 street tree within the road reserve for every 8 metres of road
                   frontage
        15.   All landscape works must be established and maintained in accordance with the
              approved design for the life of the development, and in a manner that ensures
              healthy, sustained and vigorous plant growth. All plant material must be allowed
              to grow to full form and be refurbished when its life expectancy is reached.
              Performance Bond
        16.   Security in the form of a cash bond or trading bank guarantee to the sum of
              $20,000 must be submitted to Council, to secure performance of all conditions of
              this approval, prior to the issue of a Development Permit for Operational Works.
              The cash bond or trading bank guarantee will be returned on performance of the
              conditions of approval less any costs incurred by Council in respect of enforcing
              performance of this permit. Council reserves the right to call upon the bond or
              guaranteed sum to effect compliance with conditions.
              Street Identification
        17.   The street address of the development must be clearly visible and discernible
              from the primary frontage of the site by the provision of a street number and,
              where appropriate, the building name.
        18.   The building entrance or reception area must be clearly visible and identifiable
              from the street or otherwise provided with signage and lighting at strategic
              locations to direct people to the building entrance.
              Water & Sewer Connections
        19.   An underground connection to reticulated water and sewerage must be provided
              to the development site in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
        20.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
              (Unitywater) must be submitted to Council that certifies an underground
              connection to reticulated water and sewerage has been provided to the
              development site.
              Building Appearance
        21.   All air conditioning units or other mechanical equipment must be located at
              ground level, or otherwise fully enclosed or screened such that they are not
              visible from the street frontages nor adjoining properties.



                                                                                Page 35 of 43

Section 36

ORDINARY MEETING MINUTES                                                 15 NOVEMBER 2018


        22.   All deck and balcony areas above ground floor must not be enclosed by
              permanent fixtures such as shutters, louvres, glass panelling or the like, except
              where required to satisfy any privacy condition of this Decision Notice.
              Advertising Devices
        23.   Advertising devices must comply with the requirements of the Advertising
              Devices Code.
        24.   Construction signage, including that on hoardings, shade cloth and cranes but
              not including statutory safety signage, shall not exceed a total of 4m2 to each of
              the site’s street frontages.
              Fencing and Walls
        25.   Any street fencing must be setback an average of 1 metre from the front property
              boundary. Any fencing on the front boundary must either:
              a.   not exceed a maximum height of 1.2m
              b.   be of open construction.
        26.   The area of land between the fence and the front property boundary must be
              densely landscaped to screen any fencing from the street.
        Clothes Drying Areas
        27.   Each rooming unit must be provided with access to an outdoor clothes line which
              is screened from public view.
        Protection of Privacy
        28.   To ensure privacy is protected between adjoining properties, any window/s, deck
              or the like that overlooks or has the potential to overlook the private open space
              or habitable room windows of neighbouring properties must either:
              a.   have a minimum window sill height or 1.5 metres above floor level
              b.   be fitted with translucent glazing
              c.   be fitted with a fixed external screen
              Communal Recreation Areas
        29.   Communal recreation area/s must be provided as shown on the approved plans.
              Amalgamation of Lots
        30.   Lots 3 and 4 on RP 122928 must be amalgamated prior to the commencement
              of use.
              ENVIRONMENTAL HEALTH
              Amenity
        31.   The development must be undertaken and operated in a manner that causes no
              detrimental effect upon the amenity of the neighbourhood by reason of the
              creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants
              (including dust or odours) nuisance or any other emissions in accordance with
              the nuisance provisions of the Environmental Protection Act 1994.
              Noise Nuisance
        32.   Noise emission from mechanical equipment shall comply with the following
              requirements:
              a.   Air-conditioning and Refrigeration
                   i.    7am to 10pm: Maximum background + 5dB(A)

                                                                                 Page 36 of 43

Section 37

ORDINARY MEETING MINUTES                                                  15 NOVEMBER 2018


                    ii.    10pm to 7am: Maximum background + 3dB(A)
              b.    Pumps
                    i.     7am to 7pm: Maximum background + 5dB(A)
                    ii.    7pm to 10pm: Maximum background + 3dB(A)
                    iii.   10pm to 7am: No audible noise.
        33.   Air conditioning units and swimming pool filtration plant shall be located within
              the undercover carpark.
        34.   Kitchen exhaust points for the development must be located and operated in
              accordance with Australian Standard AS1668.2-2002 “The use of ventilation and
              air-conditioning in buildings” (specifically Section 5.10 – Air Discharges).
        35.   Submission of written certification from a suitably qualified person confirming that
              the noise levels from all mechanical equipment comply when measured at either
              the residential boundary or outside the most exposed part of an affected building,
              whichever is the closest to the equipment.
              The assessment and certification is required immediately after installation of the
              equipment and prior to any occupation of the building, and in a format approved
              by Council. All equipment should be operating at the same time to test the overall
              noise level created.
        36.   Entertainers or speakers used to amplify noise must not be located in any outdoor
              area of the site including recreational areas (pool, space sundeck, and sun
              lounges, multi-purpose/flexible lounge/outside deck).
        Outdoor Lighting Devices
        37.   Lighting associated with the use must be designed, sited, installed and tested to
              comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
              obtrusive effects of outdoor lighting” using a control level of 1.
        38.   Certification must be submitted to Council from a qualified person which certifies
              that all outdoor lighting devices comply with the requirements of this Decision
              Notice at the time of commissioning.
              For the purpose of certifying outdoor lighting devices for the development, a
              qualified person is:
              a.    Registered Professional Engineer of Queensland;
              b.    an environmental or electrical design consultant with a minimum of 3 years
                    current experience in the field of outdoor lighting.
              Building Demolition/Removal/Relocation
        39.   Where the development involves the removal, relocation or demolition of a
              building, a Waste Management Plan (construction and demolition) in accordance
              with Planning Scheme Policy 11, Waste Management Plans must be submitted
              and approved by Council’s Environmental Health Officer prior to issue of a
              development permit for operational works for demolition, removal or relocation of
              any building other than a shed.
              The purpose of the Waste Management Plan is to facilitate the segregation of
              waste for the effective reuse and recycling of such materials. Segregated wastes
              attract significantly reduced disposal fees at the landfill with some items free.
              Higher gate fees are charged for mixed waste.
              Waste storage areas must provide adequate separation of all reusable,
              recyclable and waste materials. These must be located so that they are
              convenient and safe to use.


                                                                                  Page 37 of 43

Section 38

ORDINARY MEETING MINUTES                                              15 NOVEMBER 2018


            The Plan must contain the following information:
            a.    The site area for the storage and separation of waste is to be shown on the
                  plan drawings accompanying the application.
            b.    A waste management table as indicated below is to be completed showing
                  how waste material is to be segregated - recycled – reused or disposed.
            c.    Table – Waste Management Table
                  MATERIALS ON-SITE                          DESTINATION
                                                  Re-use and Recycling           Disposal
             Expected waste     Estimated    On-site          Off-site        *specify
             materials          volume(m³)   *specify         *specify        contractor and
                                             proposed re-use contractor       landfill site or
                                             or on-site       and recycling   other disposal
                                             recycling        outlet          site
                                             methods
             Excavation
             material
             Green waste
             Bricks
             Concrete
             Timber-please
             specify
             Plasterboard
             Metals - please
             specify
             Asbestos
             Other - please
             specify
            Note *If a demolition contractor is undertaking works, then the Waste
            Management table is to be completed by the demolition contractor.
            WASTE
            40.   The developer must provide waste storage and disposal facilities in
                  accordance with Planning Scheme Policy No. 9 "Waste Management Multi-
                  Dwellings and Commercial and Industrial Premises". The facilities must
                  include an external impervious area correctly sized for all refuse and
                  recycling containers and suitably screened from public places and
                  neighbouring properties. A bin wash area is required with a cold-water tap,
                  hose and drain outlet connected to sewer, via a bucket trap. The drain
                  outlet must be designed to prevent storm water entry to the sewerage
                  system. This can be achieved with a nib wall 50mm high and up to 700mm
                  x 700mm wide (max 0.5m2) , or alternatively the waste area can be roofed,
                  or any other design approved by Council.
            41.   Refuse containers must be provided in accordance with the requirements
                  of the Environmental Protection (Interim Waste) Regulation 1996 and
                  (Waste Management) Regulation 2000, for the storage and collection of
                  refuse.
            42.   Bins must be provided throughout the site to reduce littering. All bins
                  provided must be for refuse and recycling and be decanted into the bulk
                  bins by the site operators.
            ENGINEERING
            Site Specific Conditions
            43.   The proposed flood barrier must be of a design that is activated by the

                                                                              Page 38 of 43

Section 39

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


                  rising flood levels and the associated hydraulic differential to raise and
                  lower the barrier. The barrier must not require a power supply or human
                  intervention. The barrier must be maintained by the property owner in
                  accordance with the manufacturer’s specifications. The works must be
                  undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   Certification from a Registered Professional Engineer of Queensland
                       (RPEQ) that states that the design of the barrier is suitable for its
                       intended use.
            44.   The development must include an internal stairwell connecting the
                  basement level to the upper floor. The stairwell must be located and
                  constructed to provide an escape route for people to evacuate the
                  basement in the event the barrier and/or pump system fails. Plans
                  submitted as part of any subsequent operational works and building permit
                  must clearly indicate the stairwell.
            External Works
            45.   Mary Street must be upgraded for the length of its frontage to the subject
                  site. The works must be generally in accordance with drawing number
                  17699-SK100 Revision A prepared by TOD Engineers and Project
                  Managers dated 17 August 2018. The works must be undertaken in
                  accordance with an Operational Works approval and must include in
                  particular:
                  a.   construction of new kerb and channelling offset 7.5m (3.5m lane and
                       4m of cycle lane/parallel parking) from the northern side of the
                       existing landscaped median;
                  b.   suitable transitions from the new kerb line to join with the existing
                       kerb at the western and eastern end;
                  c.   landscaping of the verge area;
                  d.   construction of a pedestrian footpath in accordance with the
                       conditions of this Decision Notice;
                  e.   removal of the existing property accesses and reinstatement of the
                       kerb, footpath and verge area to match the balance of the site
                       frontage, including the provision of topsoil and turf where the existing
                       verge is grassed.
            Condition 45 is imposed pursuant to s145 of the Planning Act 2016 being non-
            trunk infrastructure.
            Site Access and Driveways
            46.   A sealed access driveway must be provided from Mary Street to all parking
                  and manoeuvring areas of the development. The works must be
                  undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   driveway crossovers generally in accordance with Council’s Standard
                       Drawing Number RS-051 and any associated addendum.
                  b.   suitable safety measures, including warning signage, to improve
                       driver awareness of the flood barrier, service vehicles and
                       pedestrians and to enhance driver and pedestrian safety. Warning
                       signage must be provided near the exit ramp from the underground
                       parking area and the guest/service area to warn motorists of
                       pedestrian movement along the frontage street.

                                                                               Page 39 of 43

Section 40

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


            Car Parking
            47.   A minimum of 17 car parking spaces, inclusive of 1 courtesy bus space,
                  must be provided and marked on the site and made available and
                  accessible at all times while the use is open for business. The works must
                  be undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   13 customer parking spaces (including 4 scooter spaces) within the
                       total, which are clearly marked for that purpose and accessible at all
                       times for visitor use.
                  b.   3 staff parking spaces within the total, which are clearly marked for
                       that purpose.
                  c.   1 courtesy bus space within the total.
                  d.   2 disabled parking space/s within the total.
                  e.   dimensions, crossfalls and gradients in accordance with Australian
                       Standard AS2890: Parking Facilities.
                  f.   Provision of 20 bicycle parking spaces.
            48.   All car parking areas and access driveways must be maintained exclusively
                  for vehicle parking and manoeuvring and kept in a tidy and safe condition
                  at all times.
            49.   Directional signage must be provided to direct visitors and customers to the
                  car parking spaces provided on site.
            Service Vehicles
            50.   Service vehicle parking, manoeuvring and standing spaces must be
                  provided on the site. The works must be undertaken in accordance with an
                  Operational Works approval.
            Pedestrian and Bicycle Facilities
            51.   Pedestrian and bicycle facilities must be provided for the development. The
                  works must be undertaken in accordance with an Operational Works
                  approval and must include in particular:
                  a.   a 2 metre wide footpath within the road verge for the entire length of
                       the site’s frontage to Mary Street.
                  Condition 51 is imposed pursuant to s128 of the Planning Act 2016 being
                  necessary trunk infrastructure identified by Council’s LGIP to service the
                  development.
            Stormwater Drainage
            52.   The site must be provided with a stormwater drainage system connecting
                  to a lawful point of discharge. The works must be undertaken in
                  accordance with an Operational Works approval and must include in
                  particular:
                  a.   the works shown on drawing number 17699-SK101 Revision A
                       prepared by TOD Engineers and Project Managers dated 17 August
                       2018, with the inclusion of the following:
                       i.    The storage tank must have sufficient capacity to cater for the
                             runoff from the driveway in a 1%AEP rain event as a minimum.
                       ii.   A back up power system for the pump that is independent of
                             the mains network.

                                                                               Page 40 of 43

Section 41

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


            Acid Sulfate Soils
            53.   All works must be carried out in accordance with an Acid Sulfate Soil and
                  Groundwater Management Plan for the development prepared by a
                  qualified person* and referenced in a Development Permit for Operational
                  Works. The Acid Sulfate Soil and Groundwater Management Plan must
                  specifically address how lowering of the groundwater level as a result of
                  the works will be avoided.
                  *(Refer to Advisory Note)
            54.   All waters, including stormwater runoff, groundwater seepage and leachate
                  from acid sulfate soils must achieve the following quality prior to release
                  from the site:
                  a.    a pH range of 6.5-8.5 pH units
                  b.   50mg/L maximum total suspended solids concentration
                  c.   0.3mg/L maximum total iron concentration
                  d.   0.2mg/L maximum total aluminium concentration
                  e.   no visible plume at either the point of release from the site or within
                       a waterway
            55.   The basement must be designed and constructed as a water excluding
                  structure in accordance with Australian Standard AS3735 "Concrete
                  Structures for Retaining Liquids" to ensure groundwater does not enter the
                  basement after construction is completed.
            56.   All treated material must undergo verification testing at the rate of one
                  sample per 250m3 throughout the duration of the excavation phase of
                  the development. The verification testing must be undertaken by a
                  qualified person* using the SPOCAS or Chromium Reducible Sulphur
                  testing suite, and the results must be submitted to Council for appraisal.
            Electricity and Telecommunication Services
            57.   Unless otherwise stipulated by telecommunications legislation at the time
                  of construction, the development must be provided with all necessary
                  conduits, pits and pipes to accommodate the future connection of optic fibre
                  technology telecommunications.
            58.   Certification must be submitted to Council from all relevant service
                  providers which certifies that the development has met the requirements of
                  this Decision Notice and all applicable legislation at the time of
                  construction.
            Earthworks and Retaining Walls
            59.   All earthworks must be undertaken in accordance with an Operational
                  Works approval, and contained entirely within the subject site unless
                  written permission from the respective landowner(s) is provided to Council.
            60.   All retaining walls must be designed and constructed in accordance with
                  the planning scheme and must be certified by an RPEQ where exceeding
                  1.0m in height. All retaining walls that are publicly accessible and exceed
                  1.0m in height must be fitted with a commercial grade safety fence.
            Preparation of a Preliminary Construction Management Plan
            61.   A preliminary Construction Management Plan must be submitted with the
                  Operational Works application and must address the following:


                                                                               Page 41 of 43

Section 42

ORDINARY MEETING MINUTES                                               15 NOVEMBER 2018


                  a.   traffic management during all aspects of the construction phase
                       including:
                       i.     a Traffic Management Control Plan in accordance with the
                              Manual of Uniform Traffic Control Devices (MUTCD) detailing
                              all temporary signage and traffic control measures prior to
                              construction
                       ii.    maintenance of safe pedestrian access for the areas affected
                              by the works during and after daily construction has ceased
                       iii.   proposed fencing to the site during the construction phase of
                              the development
                       iv.    approval of the Traffic Management Control Plan by the
                              Department of Transport and Main Roads (DTMR) for any
                              works on State controlled roads
                       v.     provision for worker car parking
                  b.   maintenance and protection of water quality and existing drainage
                       lines through the construction site, through the implementation of
                       appropriate erosion and sediment control measures
                  c.   works programme identifying key components of the works and their
                       respective durations
                  d.   establishment of a communication protocol with the general public,
                       adjoining owners, emergency services and local businesses to
                       advise of agreed construction times, impacts on traffic, services and
                       other relevant issues
                  e.   identification of complaint management procedures including:
                       i.     contact details for the on-site manager
                       ii.    dispute resolution procedures
                  f.   details on the location of external fill/dump sites, the haulage route,
                       type of vehicle to be utilised during filling operations and frequency
                       of usage. NB any damage to the existing road system as a result of
                       haulage operations shall be fully repaired at the applicant’s expense
                  g. it is acknowledged that the preliminary Construction Management
                     Plan will be a draft document requiring finalisation upon appointment
                     of the Principal Contractor employed to construct the works and a
                     final document will be required to be submitted at the Pre-Start
                     Meeting for the project.
            Damage to Services and Assets
            62.   Any damage caused to existing services and assets as a result of the
                  development works must be repaired at no cost to the asset owner at the
                  following times:
                  a.   where the damage would cause a hazard to pedestrian or vehicle
                       safety, immediately; or
                  b.   where otherwise, upon completion of the works associated with the
                       development.
                  Any repair work which proposes to alter the alignment or level of existing
                  services and assets must first be referred to the relevant service authority
                  for approval.
            Noise Monitoring
            63.   A noise monitoring system must be installed which measures noise levels

                                                                               Page 42 of 43

Section 43

ORDINARY MEETING MINUTES                                                     15 NOVEMBER 2018


                       at the boundary adjacent to the nearest residential zoned land.
                 64.   The on-site receptionist/manager must respond and terminate the relevant
                       noise source should the noise levels exceed:
                       i.     7am to 6pm = 46 dB(A) LAeq,adj,T;
                       ii.    6pm to 10pm = 40 dB(A) LAeq,adj,T;
                       iii.   10.00pm to 7.00am = 35 dB(A) LAeq,adj,T
            B.   Note the report is provided in accordance with Section 63(5) of the Planning Act
                 2016.
            C.   Note the following reasons for approval with conditions varying from the staff
                 recommendation:
                 1.    The site has been specifically identified as suitable for the proposed use in
                       the Planning Scheme;
                 2.    The proposed height of the building is below the maximum suggested by
                       the Probable Solution in the Planning Scheme and includes a range of
                       features that are consistent with the principles of sustainable design in the
                       sub tropics;
                 3.    The scale and form of architecture will positively contribute to the desired
                       look and feel of Noosaville and the Mary St streetscape; and
                 4.    The conditions can be imposed to ensure onsite management, together
                       with building design, can achieve the desired standards to protect the visual
                       and acoustic amenity of adjoining and nearby residential premises.

                                                                                           Carried.




8    CLOSED SESSION
     Nil.




9    NEXT MEETING
     The next Ordinary Meeting will be held on 20 December 2018 at Council Chambers,
     9 Pelican Street, Tewantin commencing at 6pm.




10   MEETING CLOSURE
     The meeting closed at 7.50pm.




                                                                                    Page 43 of 43

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.