Council archive · source document
Pearl and Elm St - Planning Report · MCU21/0117.01
agency must have assessed the application against, or had regard to, when the application was made; or (E) public notification if public notification was not required for the development application. In respect of whether the change results in a ‘substantially different’ development, assessment against Schedule 1: Substantially Different Development Guideline contained within the Development Assessment Rules, is provided in Table 2 below: ‘Substantially different’ development Comment Involves a new use The Multiple dwelling use remains unchanged. Results in the application applying to anew parcel of land No new land is applied over as part of this change application. Dramatically changes the built form in terms of scale, bulk, and appearance As demonstrated within the architectural plans included within Appendix A the built form reflects the old world charm of the Cooroy vernacular with added modern elements. The key development parameters such as site cover and GFA, reflecting bulk and scale are similar to that approved and continue to comply with the Planning Scheme. One additional unit increases the density onsite complying with the intent of the Planning Scheme to maximise density on sites by providing small dwellings to help alleviate the current housing crisis. Changes the ability of the proposal to operate as intended The redesign does not alter the use as intended. Removes a component that is integral to the operation of the development The proposed minor change will not alter the operation of the development. Significantly impacts on traffic flow and the transport network, such as increasing traffic to the site No impacts will result because of the proposed Minor Change application. One additional unit will not significantly impact on traffic movements of the site. Introduces new impacts or increases the severity of known impacts No new impacts will occur as a result of the new layout. Removes an incentive or offset component that would have balanced a negative impact of the development No incentive or offset component will be impacted as a result of the proposed Minor Change. Impacts on infrastructure provisions The proposed Minor Change will not impact upon any infrastructure network. RG Strategic Planning Report — Minor Change Application 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pearl and Elm St - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.