o° Project 305-2325 February, 2006 . 7 . — : ~ Page 13 ‘ucti id i Borehole BH2 was obstructed by boulders, thought to be part of an old seawall constructed in the past as a shoreline protection wall. Previous investigations carried out along Hastings Street encountered similar obstructions with boulders associated with the old seawall at depths of approximately RL 1.0m to RL 0.0m (top of obstruction). These obstructions are understood to have resulted in difficulties with the installation of steel sheet piles and have required removal of boulders for some piling operations. It would therefore be prudent to allow for the likelihood of boulders on this site in the form of removal of the boulders by excavator. | , Should any doubt arise as to the integrity or capacity of the installed piles being affected by obstructions, compliance testing of piles in the form of integrity testing and/or PDA testing should be considered. $4 Slab On Ground 6.4.1 General Field test results indicate that the existing natural soils, along with any controlled fill, are suitable for slab on ground construction provided that site preparation earthworks are carried out in accordance with recommendations in Sections 6.1 and 6.2. In addition, as noted in Section 6.3.1, the slab on ground floor should be designed to accommodate the anticipated potential ground surface movement. 6.4.2 Sub-Base It is suggested that a 150mm layer of sub-base be provided under all concrete slabs. The sub-base material should be compacted to a density not less than 95% of maximum dry density in accordance with AS.1289 5.2.1 (Modified compaction). The sub-base is provided under a concrete slab to:- * Provide a stable ‘working platform' on which to operate construction equipment; * Facilitate the provision of a uniform bearing surface under the slab. Sub-base material should be of good quality conforming to requirements (minimum) of Material Type 2.4 as specified in the Queensiand Department of Transport, Standard Specification MRS 11.05, Unbound Pavements (December, 1993). # SOIL SURVEYS ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1571 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.