Council archive · source document
Request to Amend Application and Response to DSDIP's Information Request · MCU14/0009
Attached to the e-mail MCU14/0009 information response and request to amend application.
TABLES Table 1: Site stormwater quality objectives (operational phase) 4 Table 2: MUSIC Base and Storm Flow Concentration Parameters – Industrial 5 Table 3: MUSIC Runoff Generation Parameters - Industrial 5 Table 6: Bioretention Basin Design Parameters 6 Table 8: MUSIC Results – Load-Based Pollutant Outputs 7 Table 9: WBNM Sub-Catchment Fraction Impervious Values – Existing Scenario 8 Table 10: Existing Scenario WBNM Outlet Peak Flows 9 Table 11: Rational Method Calibration Summary (Total Catchment) 9 Table 12: Rational Method Peak Flows Versus WBNM Peak Flows 9 Table 13: WBNM Sub-Catchment Fraction Impervious Values – Developed Scenario 10 Table 14: Developed Scenario WBNM Outlet Peak Flows 10 Table 15: Storage and Outlet Details of Underground Detention System 11 Table 16: Comparison of Existing, Developed and Mitigated WBNM Outlet Peak Flows 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Amend Application and Response to DSDIP's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.