Request to Amend Application and Response to DSDIP's Information Request · MCU14/0009
Attached to the e-mail MCU14/0009 information response and request to amend application.
Table 2: MUSIC Base and Storm Flow Concentration Parameters – Industrial
Total Suspended Total
Total Nitrogen
Solids Phosphorous
(Log10 mg/L)
Land Use Parameter (Log10 mg/L) (Log10 mg/L)
Storm Base Storm Base Storm Base
Flow Flow Flow Flow Flow Flow
Mean 1.92 0.78 -0.59 -1.11 0.25 0.14
Industrial
Std Deviation 0.44 0.45 0.36 0.48 0.32 0.20
Table 3: MUSIC Runoff Generation Parameters - Industrial
Parameter Industrial
Rainfall Threshold (mm) 1
Soil Capacity (mm) 18
Initial Storage (%) 10
Field Capacity 80
Infiltration Capacity Coefficient a 243
Infiltration Capacity Coefficient b 0.6
Initial Depth (mm) 50
Daily Recharge (%) 0
Daily Drainage (%) 31
Daily Deep Seepage Rate (%) 0
2.3.2 Catchment Areas
The development site has been represented as one catchment to reflect the
development proposal. The catchment reporting to the treatment device is limited
to the site itself. The catchment area is 0.164 ha
2.3.3 MUSIC Model Layout
As the management of urban stormwater needs to take a holistic approach, a
number of management measures need to be implemented where possible. The
correct utilisation of treatment devices is imperative to target the desired pollutants,
from the gross solids to the fine colloidal partials. Figure 3 shows the MUSIC model
layout for the development.
Figure 3: Model Layout
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Amend Application and Response to DSDIP's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.