Council archive · source document
Request to Amend Application and Response to DSDIP's Information Request · MCU14/0009
Attached to the e-mail MCU14/0009 information response and request to amend application.
2.5 Results MUSIC modelling of the proposed treatment for the light industry / commercial development at 1 Factory Street, Pomona, was performed to ensure the identified load based Water Quality Objectives were achieved. Table 5 presents the load- based outputs that are represented by this MCU application. Table 5: MUSIC Results – Load-Based Pollutant Outputs Reduction Unmitigated Mitigated Target Pollutant Achieved Compliance (kg/yr) (kg/yr) Reduction (%) Flow 2.3 2.24 2.4 - - TSS 322 54 83.2 80% TP 0.84 0.34 60.1 60% TN 5.3 2.6 50.6 45% GP 52.8 0 100 90% 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Amend Application and Response to DSDIP's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.