Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Request to Amend Application and Response to DSDIP's Information Request · MCU14/0009

Attached to the e-mail MCU14/0009 information response and request to amend application.

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

3.6 Operational Phase Stormwater Management
The bioretention system will be owned by the developer (body corporate), who as
the asset custodian, will be responsible for the on-going maintenance of the water
quality device. Maintenance for the bioretention basin may involve the following:
   1. Scheduled inspections;
   2. Removal of noxious plants or weeds;
   3. Maintaining the desired vegetation;
   4. Repairing erosion;
   5. Unblocking inlets and outlets;
   6. Removing litter and debris;
   7. Managing algal or moss growth;
   8. Maintaining the permeability of the filtration.
Operations and maintenance should be conducted in accordance with the
Maintaining Vegetated Stormwater Assets (Feb 2012) guideline.




                                                                                     13

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Amend Application and Response to DSDIP's Information Request.pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.