Appendix A - Assessment of Development Codes 6968

of 26

Page text shows just the words. Original shows the document exactly as it was published.

                                                                               Low Density Housing Code

                  Performance Outcomes                                       Acceptable Outcomes                                       Proposed Solutions                      Compliance
 PO18                                                      AO18.1                                                    PS18.1                                                       ✓
 Development is sufficiently separated from major          Development including any sensitive land uses is at       Development has been appropriately separated from
 electricity infrastructure and substations to minimise    least:                                                    electricity infrastructure and is setback at least:
 the likelihood of nuisance or complaint.                  (a) 50 metres from a transmission substation;             (a) 50 metres from a transmission substation;
                                                           (b) 10 metres from any other substation; and              (b) 10 metres from any other substation; and
                                                           (c) 30 metres from a transmission line easement.          (c) 30 metres from a transmission line easement.
                                                           AO18.2                                                    PS18.2                                                       ✓
                                                           Habitable buildings are not located within an easement    The proposed house is not located within an
                                                           for a distribution line.                                  easement for a distribution line.
 PO19                                                      AO19                                                      PS19                                                         ✓
 Development is located and designed to avoid or           Noise emissions do not exceed 5db(A) above                Noise emissions do not exceed 5db(A) above
 minimise noise nuisance from the use of infrastructure.   background noise level internal to a habitable building   background noise level internal to a habitable building
                                                           measured in accordance with AS1055.                       measured in accordance with AS1055.
 Earthworks and Drainage
 PO21                                                      AO21                                                      PS21                                                         ✓
 Earthworks and drainage operational works do not          Filling other than accessways:                            No filling is proposed to be imported to the site. Cut
 directly, indirectly or cumulatively cause adverse        (a) does not extend more than the equivalent of 3         and fill balance exercise is proposed over the area of
 impacts external to the development site by:                    metres around the main building, measured from      the house pad. The proposed extent of minor
 (a) causing ponding of water on the site or nearby              the outer walls of the building;                    earthworks does not exceed 3 metres from the main
      land;                                                (b) is limited to a maximum of 500m2; and                 building measured from the outside walls, is less than
 (b) increasing flooding, which adversely affects the      (c) does not impact on the local drainage of adjoining    an area of 500m2 and is sufficiently removed and
      safety or use of any land upstream and                     properties.                                         separated from adjoining lot not to impact on the local
      downstream;                                                                                                    drainage of the adjoining lot.
 (c) adversely affecting the flow of water in any
      overland flow path; and
 (d) adversely affecting the privacy or visual amenity
      of surrounding property.

 Editor's Note—Development should ensure that filling
 does not impact on the amenity and usability of
 neighbouring properties (including loss of privacy
 caused by relative level changes) or offsite drainage.
 Landslide Hazard Area

Appendix A – Assessment of Applicable Development Codes
Project No.: 6968
Site Address: 1179 Louis Bazzo Drive, Cootharaba QLD 4565
                                                                                             24
Log in to download the original file

Appendix A - Assessment of Development Codes 6968.pdf · 347 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.