SUPERSEDED Negotiated Decision Notice - 010.2010.00000627.001 [As Published] · 152010.627
2010/627
8.3 site preparation (this may include thinning, grass removal, weed removal and control,
etc.);
8.4 establishment of the missing floristic and structural elements;
8.5 creating opportunities for regeneration from the seed bed, natural recruitment and the
establishment of wildlings;
8.6 habitat creation and reinforcement for native fauna and reinforcement of habitat
linkages and corridors;
8.7 planting and mulching procedures;
8.8 fertilizing procedures;
8.9 watering procedures;
8.10 protection from wildfire, particularly during the establishment phase;
8.11 erosion and sediment control;
8.12 on-going maintenance;
8.13 access for maintenance;
8.14 environmental safeguards; and
8.15 incorporation of the relevant requirements of all the management plans required by this
approval, particularly the Bushfire Management Plan and Koala Management Plan.
9. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 must be controlled on the entire site prior to Council
endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of
natural vegetation.
10. A wire fauna fence shall be erected around the perimeter of the park areas to be protected
and restored, prior to construction activities commencing on site. The fauna fence will have
signs attached restricting entry to authorised persons only.
11. The contract for the Ecological Restoration work shall specify a 1 year maintenance period
from the date restoration works are completed by the contractor to the reasonable satisfaction
of the Council’s Coordinator of Environment and Landscaping, by which time the ecologically
restored areas should be self-sustaining. It shall also be weed-free to the satisfaction of the
Manager, Council’s Coordinator of Environment and Landscaping. The applicant must provide
Council’s Coordinator of Environment and Landscaping with a certification from a suitably
qualified person confirming that management of weeds within the park area complies with the
requirements of the Land Protection and Stock Route Management Act.
12. All the relevant ecological restoration works and actions shall be undertaken by the Developer
and completed prior to dedication of the park areas to Council.
Easements
13. The applicant shall create a volumetric easement for access and car parking purposes over
the basement of Lot 1, excluding the area nominated as exclusive use of Lot 1, in favour of Lot
2 for vehicular access and car parking purposes.
Power Supply
14. An electricity service shall be provided to Lots 1 and 2.
15. In this regard, an approved ENERGEX Electrical Design Consultant shall be engaged to
prepare detailed designs of the electrical proposal.
Page 3 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - 010.2010.00000627.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.