Council archive · source document
SUPERSEDED Negotiated Decision Notice - 010.2010.00000627.001 [As Published] · 152010.627
2010/627
property boundary and in accordance with the council planning scheme. These works
are to be submitted with the associated operational works application.
26.3 Proposed lot 3 is to be dedicated council open space and is not subject to development
and therefore sewer services will not be required.
27. Retaining walls running horizontally to sewer mains are to be 1.5m clear of the sewer.
Retaining walls crossing the sewer are to be free standing and self supporting for a minimum
of 1m both sides of the sewer main.
28. The level of the existing sewer access chamber must be adjusted to suit the proposed finished
surface levels. Work must be undertaken by Unitywater at the applicants cost.
29. A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
proposed building envelopes, buildings and other structures.
30. A 3.0 metre wide easement must be provided over all Unitywater sewers located in private
property. A 4.0 metre wide easement must be provided over Unitywater sewers greater than
3.0 metres deep (where approved by Unitywater). Easements must be located centrally over
the main.
31. Written approval to enter and construct must be obtained from the owners of properties
through which external sewers will traverse, and be submitted with lodgement of the
associated development application for Operational Works
32. Stormwater retention systems and gross pollutant traps must maintain a minimum clearance
of 1.5 metres from Unitywater water supply and sewerage infrastructure.
33. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater
water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within
these clearances must be low growing when mature and suitable Unitywater approved
varieties.
34. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
35. Connection to the Unitywater existing water supply and live sewerage system must be
undertaken by Unitywater at the applicants cost. Please contact Unitywater for quotation.
Infrastructure Policy
36. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 16 – Sewerage Headworks Contributions;
(d) Planning Scheme Policy 17 – Water Supply Headworks Contributions;
(e) Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
(f) Council Policy – Rural Roadworks Contributions;
(g) Council Policy – Master Drainage Contributions.
37. For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
38. The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Page 5 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - 010.2010.00000627.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.