Delegated Report - Code - Planning RAL21 0026

of 13

Page text shows just the words. Original shows the document exactly as it was published.

                Referral Status        Referral Agency and Referral Trigger                Response
                                       Address

                Concurrence            SARA at DILGP SARA        Schedule 10, Part 4,      The agency provided its
                                       at DILGP Via MyDAS2       Division 3, Table 1       response on 12
                                       at https://prod2.dev-     (Planning Regulation      November 2021
                                       assess.qld.gov.au/suite   2017): Premises           (Reference No. 2111-
                                       / (for assistance,        contaminated because of   25753 SRA. A copy of
                                       contact DILGP at 5352     unexploded ordnance       the response is
                                       9701 or                                             attached.
                                       email:[email protected]

               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      General Advisory Notes
               2.     As these driveways are private structures, the owner bears full responsibly for the standard
                      of its construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed generally in accordance with standard drawings RS-
                      049 and RS-050.
               3.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               4.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               5.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart and Inspections Request
               6.     Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
               7.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.




                                                                                                   Page 11 of 13

Document Set ID: 21928199
Version: 7, Version Date: 26/05/2022
Log in to download the original file

Delegated Report - Code - Planning RAL21 0026.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.