Landscape Drawings

From the archive Change Application.zip (folder Attachments), inside Change Application - OPW16/0203.01 - DA Form 5 - Cover Letter - Civil Drawings - Arborit Report - DTMR Correspondence - 19 Trading Post Road Cooroy - Palm Lake Stage 2. File date in the archive: 2021-09-01 15:49.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                 NOTES AND SPECIFICATIONS
                                                                                                                                                                 1. LANDSCAPE SCOPE OF WORKS                                                                       8. WEED CONTROL NOTES                                                                                          9. MULCH
                                                                                                                                                                 Works as specified within the landscape scope include the following                               Weed management is to include the control of all weeds from within the                                         Mulch to to be free of contaminants including weed propagules and installed
                                                                                                                                                                 softscape works in order to establish a landscape buffer between the                              buffer planting area during site preparation and the maintenance period,                                       typically at 100mm thickness. A thin layer of mulch (approximately 20-30mm)



                                        LP02
                                                                                                                                                                 proposed Elm St footpath and the Palm Lakes Resort property boundary.                             including species listed in the following:                                                                     is to be spread in areas of dense native regrowth. Mulch to be forest blend or
                                                                                                                                                                 Typically works include:                                                                                                                                                                                         approved equivalent and should contain a mix of leaves, twigs, bark and
                                                                                                                                                                                                                                                                   · Invasive Plants listed under the Biosecurity Act 2014;
                                                                                                                                                                 ·    Removal of exotic taxa including weeds                                                                                                                                                                      wood.
                                                                                                                                                                 ·    Mulch to planting area                                                                       · Weeds of National Significance (WONS) under the Commonwealth
                                                                                                                                                                 ·    Softscape planting of tubestock species                                                        Government Weeds strategy;                                                                                   10. PLANTING AREAS
                                                                                                                                                                 ·    Establishment and maintenance                                                                · Invasive Naturalised Plants in South East Queensland, 2002,                                                  Once weed treatment has taken effect and mulch has been applied, individual
                                                                                                                                                                                                                                                                     Queensland Herbarium; and                                                                                    planting holes are to be manually dug by hand or mechanical auger at the
                                                                                                                                                                 2. SITE DESCRIPTION                                                                                                                                                                                              densities prescribed within this Plan.
                                                                                                                                                                                                                                                                   · Any other exotic plants known to exhibit weed characteristics (i.e.
                                                                                                                                                                 Works are to be undertaken generally in accordance with the existing                                Invasive, competitive characteristics).
                                                                                                                                                                 extent of the landscape buffer located between Elm Street and the Palm                                                                                                                                           Refer to planting schedule for a list of species to be planted within designated
                                                                                                                                                                 Lakes Resort property boundary. Due to the installation of a new footpath                         Typically weed control works are to be undertaken as per the South East                                        areas. Species have been derived based on existing flora assemblages
                                                                                                                                                                 on Elm Street a number of upper and midstorey native species will be                              Queensland Restoration Framework: Manual. However, weed control                                                present throughout the buffer area.
                                                                                                                                                                 removed to accommodate the footpath and associated earthworks.                                    techniques as outlined in this plan must be followed and are considered
                                                                                                                                                                 Landscape works will focus on providing buffer planting to areas where                            necessary due to prescribed maintenance periods.
                                                                                                                                                                 native vegetation removal has occurred in addition to providing planting to                                                                                                                                      Refer to planting schedule for stock sizes and numbers. All plants are to be
                                                                                                                                                                                                                                                                   Notwithstanding the requirements of the SEQ Restoration Framework the
                                                                                                                                                                 areas previously maintained as turf between the new footpath and the                                                                                                                                             evently distributed throughout the deisnged planting areas with random
                                                                                                                                                                                                                                                                   following should also apply:
                                                                                                                                                                 Palm Lakes property boundary. Buffer planting has been designed to                                                                                                                                               species distribution undertaken. As a minimum, all planting stock should
                                                                                                                                                                                                                                                                   · Hand removal of large herbaceous weeds is desirable where feasible.                                          have:
                                                                                                                                                                 include a 2m wide groundcover planting area to the outside of the footpath
                                                                                                                                                                 in order to provide adequate separation between pathway users and                                 · Care should be taken to avoid disturbance or damage to the soil profile                                      ·      A significantly established root system;
                                                                                                                                                                                                                                                                     or to native plants in the area.
           JOINS SHEET LP03



                                                                                                                                                                 tree/shrub species. Additionally this seperation will provide increased
           JOINS SHEET LP02


                                                                                                                                                                                                                                                                                                                                                                                  ·      Not display signs of 'yellowing', leaf or stem damage or disease, root



                                                                                      LP03
                                                                                                                                                                 safety to the pathway system as per CPTED guidelines.                                             · All seed heads should be removed and bagged to ensure no further                                                    curling/girdling or restriction related to being 'pot bound';
                                                                                                                                                                                                                                                                     contamination occurs.
                                                                                                                                                                                                                                                                                                                                                                                  ·      Trees and shrubs to have a single, straight trunk that is a minimum of
                                                                                                                                                                 3. LOCAL AUTHORITY REQUIREMENTS                                                                   · Herbicide mixing must be undertaken away from waterways, planting                                                   25cm tall for 50mm tube-stock; and
                                                                                                                                                                 Unless specified or detailed with this set of Landscape drawings works are                          areas and at prescribed rates.
                                                                                                                                                                 to be to Local Authority details and requirements.                                                                                                                                                               ·      Be sun hardened.
                                                                                                                                                                                                                                                                   · Active constituent must be suitable for target weeds and should not
                                                                                                                                                                                                                                                                                                                                                                                  All plants are to be installed as per planting details.
                                                                                                                                                                 4. HARDSCAPE AND DRAINAGE                                                                           impact surrounding vegetation to be protected.
                                                                                                                                                                 Refer to relevant civil engineering drawings for levels and grading, storm                        · Spraying must be undertaken by personnel who hold a current
                                                                                                                                                                 water drainage and connections. Refer to civil engineers drawings for                               commercial operators licence for using herbicides.
                                                                                                                                                                 specification regarding footpath finishes and details.                                            · Spraying should not occur when foliage is wet or in wet conditions
                                                                                                                                                                 5. FALLS, LEVELS AND GRADING
                                                                                                                                                                                                                                                                   · All weeds within the restoration area are to be managed to ensure no
                                                                                                                                                                                                                                                                     spread of weeds on or off the site, for a period of 24 months.
                                                                                                                                                                 Unless noted otherwise on plan, surrounding maximum grades should be
                                                                                                                                                                 1:3 for planting areas and 1:6 for turf areas.
                                                                                                                                                                                                                                                                   All weed treatments must comply with specific product labels, Minor Use
                                                                                                                                                                 6. PLANTING SELECTION                                                                             Permits PER11463-v4 and PER82307 (or other applicable permits),
                                                                                                                                                                 Refer to planting schedule for plant selection and to plans for the locations                     Chemical Usage (Agricultural and veterinary) Control Act 1988, MSDS,
                                                                                                                                                                 of specific planting areas. The locality of planted species has been                              Agricultural Chemical Distribution and Control Act 1966 and the Work
                                                                                                                                                                 designed based on CPTED requirements, maintaining traffic and                                     Health and Safety Act 2011 (including all applicable Regulations).
                                                                                                                                                                 pedestrian sight lines and ensuring adequate setback from the footpath for
                                                         JOINS SHEET LP04
                                                                                                                                                                                                                                                                   All weed management works are to be conducted by appropriately
                                                         JOINS SHEET LP03
                                                                                                                                                                 maintenance.
                                                                                                                                                                                                                                                                   qualified and experienced persons proficient in both native species and


                                                                                                                 LP04                                            4.1 Fertiliser to planting areas:
                                                                                                                                                                 Broadcast Dynamic Lifter or equivalent throughout the planting area prior
                                                                                                                                                                 to the installation of mulch cover as per manufacturer's recommendations.
                                                                                                                                                                                                                                                                   weed species identification. The method adopted for treatment of weeds
                                                                                                                                                                                                                                                                   across the site will be dependent upon the physical stage of development
                                                                                                                                                                                                                                                                   of individual weed specimens and individual species.
                                                                                                                                                                                                                                                                   Only herbicides suitable for application adjacent to waterbodies as
                                                                                                                                                                 Water in all new plantings with a seasol or approved equivalent during the
                                                                                                                                                                 establishment period. Fertilisers containing phosphorous must not be used                         detailed on the manufacturer's specifications are to be used.
                                                                                                                                                                 on Banksia, Grevillea, Hakea, Telopea, Hardenbergia, Proteas, Alyogyne                            Herbicide sprays should be applied in non-windy conditions to prevent
                                                                            ELM




                                                                                                                                                                 and Phebalium species.                                                                            incidental poisoning of native species and not on days preceding forecast
                                                                                                                                                                                                                                                                   rainfall.
                                                                                                                                                                 4.2 SH - Sun hardened
                                                                                                                                                                 It is the contractors responsibility to ensure all plants are sun hardened to
                                                                              STR




                                                                                                                                                                 the sites climatic conditions.                                                                    Exotic Grass Treatment
                                                                                                                                                                                                                                                                   All exotic grasses are to be treated with herbicide until sufficiently
                                                                                 EET




                                                                                                                                                                 5. PLANTING AREAS                                                                                 controlled. Following this grasses should be brushcut at finished surface
                                                                                                                                                                 Outside of the dripline of existing vegetation cultivate the existing topsoil to                  level. Hand removal is also desirable where feasible.      Follow      up
                                                                                                                                                                 a minimum depth of 150mm. Place 100mm layer of organic mulch, as                                  treatment will be required when regrowth occurs.
                                                                                                                                                                 specified. Mulch must be a minimum of 100mm unless specified and
                                                                                                                                                                 contain a combination of leaf, timber and bark unless otherwise noted. No
                                                                                                                                                                 soil laden tub grindings will be allowed to be used as mulch. Soil laden tub                      Woody Weed Treatment
                                                                                                                                                                 grindings may only be used as an additive to site topsoil only.                                   All woody weeds must be cut stumped at ground level with herbicide
                                                                                                                                                                                                                                                                   applied immediately before the plant cells close and translocation of
                                                                                             JOINS SHEET LP05
                                                                                             JOINS SHEET LP04




                                                                                                                                               LP05
                                                                                                                                                                 6. LAWN AREAS                                                                                     herbicide ceases. Herbicides must be applied at the prescribed rate for
                                                                                                                                                                 Cultivate existing subgrade to a depth of 150mm, place 100mm of topsoil                           cut stump application.
                                                                                                                                                                 as specified, and lay 25mm thick turf rolls as specified. Ensure flush to
                                                                                                                                                                 adjacent pathways.
                                                                                                                                                                                                                                                                   Large Weed Treatment
                                                                                                                                                                                                                                                                   Large woody weeds that cannot be cut stumped and removed may be
                                                                                                                                                                 7. METHODOLOGY                                                                                    approved for stem injection or frilling. Trees may be left to die in situ
                                                                                                                                                                 The methodology for works should generally occur in the following                                 where they are at a sufficient distance from persons or property and
                                                                                                                                                                 chronological order:                                                                              where tree failure will not be deemed a hazard i.e. internal bushland areas
                                                                                                                                                                 1.    Undertake comprehensive weed control within designated                                      and riparian edges.
                                                                                                                                                                       rehabilitation areas, including control/removal of any woody weed
                                                                                                                                                                       species and herbicide treatment (if applicable) to exotic taxa.                             Herbicides application for frilling and stem injection must occur
                                                                                                                                                                 2.    Following removal of weed matter, apply 100mm forest blend mulch                            immediately before plant cells close and translocation of herbicides
                                                                                                                                                                       to areas as noted on plan. It is noted that areas with strong native                        ceases.
                                                                                                                                                                       vegetation recruitment should only receive a thin layer of mulch to
                                                                                                                                                                       prevent damage to existing regrowth.
                                                                                                                                                                 3.    Following mulch application, plants can be installed.
                                                                                                                                                                 4.    Following planting water in plants as required.
                                                                                                                                                                 5.    Conduct follow up watering as required.
                                                                                                                                                                 6.    Conduct follow up weed treatment as required.
                                                                                                                                                                 7.    Replace all failed plants as required.




KEY PLAN                                                                                         0
                                                                                                 0
                                                                                                                5
                                                                                                                10
                                                                                                                     10
                                                                                                                     20
                                                                                                                          15
                                                                                                                          30
                                                                                                                               20
                                                                                                                               40
                                                                                                                                    25
                                                                                                                                    50
                                                                                                                                         (A1) 1:500

                                                                                                                                         (A3) 1:1000
                                                                                                                                                       50
                                                                                                                                                        Metres
                                                                                                                                                       100                                                                                                                                                                                                                                                     LIST OF ASSOCIATED DRAWINGS
                                                                                                                                                                                                                                                                                                                                                                                                               SHEET:                             DESCRIPTION:
                                                                                                                                                                                                                                                                                                                                                                                                               LP01                               COVER SHEET/ KEY PLAN
                                                                                                                                                                                                                                                                                                                                                                                                               LP02-LP05                          LANDSCAPE PLANS
                                                                                                                                                                                                                                                                                                                                                                                                               LP06                               DETAILS AND SCHEDULES




COVER SHEET - ELM ST BUFFER PLANTING                                        PROJECT TITLE:                                                                           CLIENT:                                                                                                                                TITLE:
                                                                                                                                                                                                                                                                                                                                                                                                                CERTIFICATION:
                                                                                                                                                                                                                                                                                                                                                                                                                REGISTERED LANDSCAPE ARCHITECT:



                                                                                                                                                                                                                                                                                                                                                                                                               RYAN CAIRNEY - 3182


                                                                                                                                                                                                                                                                                                                                                                                                               JOB:                       PLAN:        REV:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   DATE:



                                                                                                                                                                                                                                                                                                                                                                                                                                                                   08/03/2021


                                                                                                                                                                                                                                                                                                                                                                                                                                                                 NORTH:

                         PO Box 9566 Pacific Paradise, Qld, 4564
                                                P: 07 5450 5984
                                                                            PALM LAKES - PLANTING BUFFER                                                             PALM LAKE WORKS                                                      B         FOR APPROVAL                  08-03-2021   RC   JL
                                                                                                                                                                                                                                                                                                            COVER SHEET / KEY PLAN                                                                             J000742                    LP01         B
                                           ABN: 60 625 108 625
                                                                            AT ELM STREET, COOROY                                                                                                                                         A         PRELIMINARY                   17-02-2021   RC   JL
                                                                                                                                                                                                                                                                                                            COPYRIGHT © 2021 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
                                                                                                                                                                                                                                                                                                                                                                                                               SCALE:                     1:500 @ A1
                                                                                                                                                                                                                                                                                                            MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
                                                                                                                                                                                                                                          ISSUE DETAILS                           DATE         INIT CHK'D
Log in to download the original file

Landscape Drawings.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.