Original source · versioned page text
Referenced Document - OPW20-0037
Mr Andrew Jensen 20013-001-Rev0
4 February 2020
Building pad fill batter at 1V:2H
Steeper fill in driveway embankment
over head of central drainage line
Text Figure 7: Looking east across to building pad in southern part of site
Building pad fill batter at 1V:2H with
topsoil and grass cuttings coverage
Text Figure 8: Looking north-west over building pad fill embankment
5/11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.