Skip to the record
Search everything, all in one place.

Original source · versioned page text

Referenced Document - OPW20-0037

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Mr Andrew Jensen                                                              20013-001-Rev0
                                                                              4 February 2020




                                    Building pad fill batter at 1V:2H




                            Steeper fill in driveway embankment
                            over head of central drainage line




Text Figure 7: Looking east across to building pad in southern part of site




                Building pad fill batter at 1V:2H with
                topsoil and grass cuttings coverage




Text Figure 8: Looking north-west over building pad fill embankment




                                                                  5/11
Log in to download the original file

Referenced Document - OPW20-0037.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.