Town Planning Report - Other Change Composting Facility · 132005.638.06

of 33

Text shows just the words. Original shows the document exactly as it was published.

                                                                  Court Appeals & Dispute Resolution
                                                                  Applications & Assessment
                                                                  Due Diligence & Compliance
                                                                  Project Management
                                                                  General Development Advice




              Town Planning Report

          Other Change Application
                   for a
            Composting Facility

  Noosa Resource Recovery Centre




                Adamson Town Planning Pty Ltd
                       (ACN: 163 798 374 | ABN: 73 163 798 374)
P (07) 5430 6671 F (07) 5430 6677 M 0437 754 420 Mail: PO Box 894, Cooroy QLD 4563
            ‘Noosa Boardroom’, 28 Eenie Creek Road, Noosaville QLD 4566
                     Email| [email protected]
Full text of the other 32 pages

Page 2

“Specialist services and practical solutions”




       Document Control
        Project:           Request for an “other change” to current development approval for a
                           material change of use for the existing Noosa Waste and Recycling
                           Facility to provide for a Composting Facility
        Applicant:         Noosa Council
        Project Number:    23026
        Reviewed        by 14 September 2026 & 23 September 2026
        Client:
        Status of Report:  Final
        Date:              23 September 2026
        Author:




                                   Shane Adamson (BEngTech, GDURP, MPIA, MQELA)
                                   Town Planning Specialist
                                   Director - Adamson Town Planning Pty Ltd

       The information contained in this document is confidential and intended solely for the use of the client
       for the purpose for which it has been prepared, and no representation is made or is to be implied as
       being made to any third party. Use or copying of this document in whole or in part without the written
       permission of Adamson Town Planning Pty Ltd constitutes an infringement of copyright. The intellectual
       property contained in this document remains the property of Adamson Town Planning Pty Ltd.


       In preparing this report it is assumed that all information and documents provided by the client are
       correct and accurate. Where information has been obtained from another source, it is assumed that the
       information is accurate where relied upon and is acknowledged accordingly.


       This report is presented without the assumption of a duty of care to any other person (other than the
       Client). The report may not be relied on by a Third Party. Adamson Town Planning Pty Ltd will not be
       liable to a Third Party for any loss, damage, liability, or claim arising out of or incidental to a Third Party
       and publishing, using, or relying on the facts, content, opinions, or subject matter contained in this
       report.



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                            Page 2

Page 3

“Specialist services and practical solutions”




        TABLE OF CONTENTS
       DEVELOPMENT SUMMARY................................................................................................................... 5

       1      EXECUTIVE SUMMARY .................................................................................................................. 6

       2      INTRODUCTION ............................................................................................................................. 8

       3      APPLICATION BACKGROUND ...................................................................................................... 8

       4      SUBJECT SITE ................................................................................................................................. 9

       5      APPROVAL BACKGROUND ......................................................................................................... 10

       6      DEVELOPMENT PROPOSAL......................................................................................................... 12

           6.1       COMPOSTING FACILITY ............................................................................................................ 12
           6.2    ENVIRONMENTAL RELEVANT ACTIVITY REQUIREMENTS ................................................................ 14
           6.3    TECHNICAL REPORTS .............................................................................................................. 16
             6.3.1 Traffic Impact Assessment ................................................................................................ 16
              6.3.2 Odour Impact Assessment ................................................................................................ 17
              6.3.3 Flood Impact Assessment ................................................................................................. 18
              6.3.4 Stormwater Management Plan .......................................................................................... 18

       7      CONSULTATION........................................................................................................................... 19

       8      PLANNING ACT 2016 .................................................................................................................. 20

       9      STATE POLICY ASSESSMENT ...................................................................................................... 20

           9.1       SOUTH EAST QUEENSLAND REGIONAL PLAN................................................................................... 20
           9.2       STATE PLANNING POLICY 2017 .................................................................................................... 21
           9.3       PLANNING REGULATION 2017 ..................................................................................................... 21
       10     NOOSA PLAN 2020 ...................................................................................................................... 22

           10.1      ZONING AND TABLES OF ASSESSMENT ........................................................................................... 22
           10.2      OVERLAY MAPPING AND CODES ................................................................................................... 23
              10.2.1 Acid Sulfate Soils Overlay ................................................................................................. 23
              10.2.2 Biodiversity, Waterways and Wetlands Overlay ................................................................ 23
              10.2.3 Bushfire Hazard Overlay ................................................................................................... 24
              10.2.4 Flood Hazard Overlay ........................................................................................................ 25
              10.2.5 Landslide Hazard Overlay ................................................................................................. 26
           10.3      COMMUNITY FACILITIES ZONE CODE ............................................................................................. 27
           10.4      INFRASTRUCTURE ACTIVITIES CODE ............................................................................................... 28
           10.5      WORKS CODES .......................................................................................................................... 29
              10.5.1 Driveways and Parking Code ............................................................................................ 29
              10.5.2 Water Quality and Drainage Code .................................................................................... 30

       11     CONDITIONS OF APPROVAL ...................................................................................................... 31




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                                                              Page 3

Page 4

“Specialist services and practical solutions”


       12   CONCLUSION ............................................................................................................................... 32


        Attachments:
        Attachment 1A & 1B                       Current Development Approval and Approved Plans
        Attachment 2                             Master Plans - Part and Complete Site
        Attachment 3A                            Proposal Plans by OREZ
        Attachment 3B                            Process Design Strategy by OREZ
        Attachment 4                             Layout Staging Plans 1-3
        Attachment 5                             Traffic Impact Assessment by PTT
        Attachment 6                             Odour Impact Assessment by Katestone
        Attachment 7                             Flood Hazard Assessment by Covey, dated August 2025
        Attachment 8                             Interim Stormwater Management Plan by TOPO, Version A
        Appendices:
        Appendix A:                              •     State Code 1 – Development in a state-controlled road
        State Development                        •     State Code 22 – Environmentally Relevant Activities
        Assessment
        Provisions




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                                                         Page 4

Page 5

“Specialist services and practical solutions”



       Development Summary

        Development Proposal                            Alterations and additions to the Noosa
                                                        Resource Recovery Centre (NRRC) - Utility
                                                        Installation with ancillary composting facility.
        Subject Land:                                   561 Eumundi Noosa Road, Doonan
        Land Description:                               Lot 77 on SP298776
        Land Area:                                      321.9 ha, with the approximate area of the
        Subject Land:                                   NRRC being 44ha
        Regional Plan:                                  South East Queensland Regional Plan 2023 –
                                                        Regional Landscape and Rural Production
                                                        Area
        Planning Scheme:                                Noosa Plan 2020 (the planning scheme)
        Land Zone:                                      • Community Facilities (Utility Installation);
                                                           and
                                                        • Environmental         Management        and
                                                           Conservation
        Local Area Plan:                                Not Applicable
        Overlay Mapping:                                Within the land the following overlays apply:
                                                        • Acid Sulfate Soils – Above 5m AHD to
                                                           20m AHD (Area 2), in part;
                                                        • Biodiversity, Waterways and Wetlands –
                                                           Area of Biodiversity Significance, in part;
                                                        • Bushfire Hazard - High Potential Bushfire
                                                           Intensity, Medium Potential Bushfire
                                                           Intensity and Potential Impact Buffer, in
                                                           part
                                                        • Flood Hazard, in part; and
                                                        • Landslip Hazard, in part.
        Level of Assessment:                            Code Assessment
        Noosa Plan 2020:                                Most relevant provisions include:
                                                        • Community facilities zone code;
                                                        • Infrastructure activities code; and
                                                        Works Codes, including:
                                                           • Driveways and Parking Code; and
                                                           • Water Quality and Drainage Code.




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                Page 5

Page 6

“Specialist services and practical solutions”



       1        Executive Summary

       The proposed development seeks to change the current development approval to allow for a
       composting facility at the Noosa Resource Recovery Centre (NRRC). The composting facility
       will be centrally located within the exiting operational area and will provide for the extension
       of the existing onsite management of green and other organic waste materials. The existing
       onsite mulching of green waste is to be replaced with a more advanced composting process,
       which that will also include selected low-medium odour generating food products to provide
       a compost that could be used as a soil conditioner off the site.

       The land affected by the development is included within the Community Facilities Zone
       (annotated Utility Installation). The proposed development will form part of the existing NRRC
       and is consistent with the current land zoning being for a utility installation. The proposed
       operation of the composting facility is an extension of the existing green waste management
       and remains ancillary to operation of the NRRC. No manufacturing of soil conditioners is being
       proposed on the site.

       The key issues to be considered are summarised below:

           •    Community need - Council has a responsibility to continuously improve waste and
                recycling at the NRRC. The planned improvements to the facility are critical to improve
                the efficiency of the current operation and maintain sufficient land for Council to meet
                other waste deferral expectations. Waste is to be managed in a sustainable manner
                consistent with the needs of the community with the proposed new facility being in
                the public interest.

           •    Environmental impacts - Council must operate the landfill under the Environmental
                Authority (EA) permit (EPPR01855314) for the site. The addition of a composting facility
                will include another Environmentally Relevant Activity, ERA53 for composting. Council
                has a general environmental duty and is obligated under the Environmental Protection
                Act 1994, to take all reasonable measures to minimise the risk, reduce and prevent
                environmental harm. Expansion and improvements to the NRRC are necessary to
                achieve compliance with the environmental authority under the Environmental
                Protection Act 1994.

           •    The operation of the existing NRRC, including the proposed new composing facility is
                aligned with regional waste plan initiatives to reduce landfill and produce other
                sustainable products of value, which is critical given the increasing population growth
                in Noosa and the Sunshine Coast Council area towards the north.

           •    Local government is required to promote and implement waste avoidance, reduction
                and resource recovery actions to meet National waste standards, and the proposed
                composting facility along with other initiatives forms an important component of the
                continuous improvement process at the NRRC.




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                Page 6

Page 7

“Specialist services and practical solutions”



           •    There is an identified community, economic and planning need for proposed
                improvements to the NRRC, with the proposed composting facility being a logical and
                practical addition that will result in improved efficiencies and cost savings that will
                result in other value adding benefits in the long term.

           •    The proposed composting facility will be centrally located within the existing
                operational footprint of the NRRC and will be properly managed to minimise and
                mitigate any potential offsite impacts and will not cause environmental harm.




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 7

Page 8

“Specialist services and practical solutions”




       2         Introduction

       The development application is for an “other change” to the existing development approval
       (2005/638) to provide for a composting facility, centrally located within the NRRC site. The
       proposed composting facility will replace the existing green waste mulching and management
       process onsite.

       While a new facility is being established on the land, there is no increase to the existing
       development footprint. The scale of operation has increased over time in line with incremental
       population growth.

       The proposed composing facility itself does not significantly change the existing onsite
       operation and will not generate a substantial increase in traffic movements or a significant
       increase in the demand for parking. Further, the proposed development will not cause a
       significant worsening of existing operational impacts with the proposed development being
       well removed from nearby rural residential properties and not expected to cause any
       environmental harm off the site.

       The location of the proposed composting facility and the nature of facility is a logical and
       practical expansion to the existing NRRC organic waste processing, in response to an identified
       community need to improve processing and operational efficiencies.


       3         Application Background

       The site of the composting facility is centrally located within the existing operational area and
       does not require the removal of any remanent vegetation and does not substantial change the
       existing ground levels. The proposed composting facility is not considered to be a new use,
       rather an extension of the existing green waste mulching and processing, along with the
       processing of some limited low risk odour generating food products, such as coffee grounds.
       No blending no manufacture of soil conditioning is proposed onsite.

       Given the application is for an “other change” it is to be assessed in accordance with section
       82 of the Planning Act 2016. The relevant provisions that apply as if … the change application
       were the original development application, with the changes included, but was made when the
       change application was made. Therefore, the “other change” application is to be assessed
       against the current Noosa Plan 2020; however, is to be considered in context with the existing
       development approval 1.




       1 Planning Act 2016, section 82(2)




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                Page 8

Page 9

“Specialist services and practical solutions”



       4        Subject Site

       The land is located at 561 Eumundi Noosa Road, Doonan and is described as Lot 77 on SP
       298776 (Lot 77). The land comprises multiple allotments that collectively form Lot 77 and has
       an area of approximately 322 ha. The NRRC operation occupies an area of about 44ha located
       to the south west of the larger parcel (refer Figure 1A).

       The majority of the land (Lot 77) contains a significant amount of regulated vegetation to the
       north and east. The land extends northwards to Hollett Road, eastwards to Walter Hay Drive
       and further to Tidswell Road. It also extends towards the south on the southern side of the
       unformed Rutch Road and further to the south and abuts Emu Mountain Road.




                                                                   Existing NRRC operational area




       Figure 1A – Aerial Photograph (Noosa Council – Interactive Mapping)

       The existing NRRC manages approximately 92,600 tonnes of waste annually. The facility serves
       as a pivotal hub for waste management, including diversion, supporting the local community
       of Noosa and the Sunshine Coast northern region, as well as the 2.08 million visitors who come
       to Noosa each year. A relatively large number of residents and business operators who utilise
       the facility are from outside the Noosa area, with the existing facility being located on the
       border with the Sunshine Coast Regional Council (refer Figure 1A).

       The site currently facilitates the transfer and sorting of various waste streams, promoting
       recycling efforts and diverting materials from landfill. It supports activities such as household
       and commercial waste recycling and disposal, recycling drop-offs, green waste processing
       (mulching), concrete recycling and the collection of hazardous materials, and generally
       providing waste management practices. The facility’s operations are integral to maintaining




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                  Page 9

Page 10

“Specialist services and practical solutions”



       environmental stewardship and fostering a cleaner and more resource efficient community
       within the region.

       The existing facility provides landfill cells, a resource recovery operational area, including green
       waste mulching, customer interface and waste transfer station and weighbridge bridge and a
       resource recoverables area. The site also contains the Cleanaway Depot to the northwest and
       the “Reviva” recycling shop. The proposed composting facility will be located within the central
       operational area (refer Figure 1B).

       The land does not adjoin and is well removed from nearby rural residential properties to the
       west and southwest. The access and egress to and from Eumundi Noosa Road will remain
       unchanged (refer Figure 1A).




                                                                                  General location of the
                                                                                  Composting Facility




       Figure 1B – Aerial Photograph of subject land


       5        Approval Background

       The current development approval for the existing waste and recycling facility was first
       approved in 2005 under a development permit for a material change of use for an Expansion
       of Special Purpose (Waste Disposal and Recycling Facility) and Ongoing Clearing Purposes
       (2005/638). The development approval contains concurrence agency conditions from the
       Department of Main Roads (DMR) and the Department of Natural Resources & Mines (DNRM)
       as they were known at that time.

       A number of recent changes have been made to the development approval as follows:

           •    Other change (approval No. 132005.638.03), for an expansion to the Resource
                Recovery Area (RRA) and including provision for a new HES Basin, dated 15 February
                2024; and




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                   Page 10

Page 11

“Specialist services and practical solutions”



           •    Other change (approval No. 132005.638.04), for a new Waste Transfer Station,
                expansion of the Cleanaway Depot and new “Reviva Shop”, dated 18 December 2025.

       A copy of the current development approval is provided as Attachment 1A. A copy of the
       current proposal plans is provided as Attachment 1B. An extract of the updated Master Plans
       for the site are provided as Attachment 2 (refer Figure 2).




       Figure 2 – Extract of current Master Plan

       Under the original development approval, the conditions provided by the Department of
       Natural Resources and Mines required an Offset Restoration Plan providing for a minimum of
       24 hectares of land within the properties identified in Table 1 (refer Attachment 1A). The
       restoration plan provided for 19ha of a remnant “Endangered” regional ecosystem and a
       minimum of 5ha of remnant “Not of Concern” regional ecosystem within 20 years of the
       commencement of the use, which has now been realised.

       The offset area comprises 27 sites having a total land area of 39.1ha, which covers parts of the
       20 allotments surrounding the upper sections of Lake Macdonald. It is my understanding that
       this offset area is now protected by a Property PMAV lodged with the Department of Natural
       Resources. The PMAV will ensure the protection of the environmental offset area in the long
       term.

       The other changes made to the development approval were for the establishment of the new
       HES Basin (Approval No. 132005.638.03) and for the expansion of the Cleanaway Depot
       (Approval No. 132005.638.04). These developments required the removal of remnant




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility              Page 11

Page 12

“Specialist services and practical solutions”



       vegetation and provision for an environmental offset in the form of an Agreed Offset Delivery
       Plan (ODP) in accordance with the Environmental Offsets Act 2014.
       The applicant has secured land at Lake Flat Road (Lot 4 on RP803972) to provide for the Keysii
       Nature Reserve, which is to be rehabilitated in Offset Area Rehabilitation Plan. This forms part
       of the current “minor change” application (132005.638.05) yet to be finalised.

       This “other change” application makes further changes to the development approval to
       provide for another stage of development under the Master Plan for the proposed composting
       facility (refer Figure 2).


       6        Development Proposal

       6.1      Composting Facility

       The project involves establishing an aerated in-vessel composting facility at the NRRC. A copy
       of the proposal plans, and a copy of the Process Design Strategy are provided as Attachments
       3A & 3B.

       The applicant is also seeking to update the staging for the various components of the
       development in accordance with the new Layout Plans for Stages 1 – 3 (refer Attachment 4),
       as follows:
           • Layout Plan Stage 1 – The completion and operation of the new HES Basin and upgrade
               the RRA Pade area;
           • Layout Plan Stage 2 – The construction of the proposed Composting Facility including
               the upgrading of the internal roadways and new weighbridge with new gravel
               hardstand area; and
           • Stage 3 – The construction of the Waste Transfer Station, “Reviva Shop” and expansion
               of the Cleanaway Depot.

       Existing green waste currently received and mulched on-site will instead be processed into
       compost, representing a shift in current processing method. While the proposal will enable
       increased intake capacity over time, the controlled composting process (including natural
       breakdown and moisture loss) means that final compost outputs will be broadly comparable
       to current mulch production volumes.

       Importantly, the waste being proposed through the composting facility is the same waste
       material that currently being accepted and managed at the NRRC. That is, the composting
       facility will provide for another level of processing, which is consistent with the existing utility
       installation use. This includes the receival, treatment and or processing of organic green and
       food waste products; however, not all food waste will be composted.

       It is noted that while food waste is received at the NRRC it is not currently processed onsite. It
       is now proposed to also process some low odour food waste products with the composting
       facility, therefore adding and increasing the type of organic waste material being processed at
       the NRRC.




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                 Page 12

Page 13

“Specialist services and practical solutions”




       The proposed composting facility will provide for an alternative treatment method for organic
       waste that will value add by producing a compost media that could be used for blending and
       manufacturing of soil conditioners off the site 2. It is not intended to manufacture soil
       conditioners, with the composting being an ancillary component of the existing operation and
       management of organic waste products already received and therefore does not change the
       nature of the existing utility installation use.




       Figure 3A – Extract of Site Plan

       The Process Design Strategy 3 advises that the proposed system is an enclosed composting
       process where organic material is placed inside a contained unit and supplied with air to
       support efficient breakdown. Air from the system is captured and treated before release, which
       helps control odour and improves processing efficiency. The composting process includes the
       following:
           • enclosure of the composting unit where material is actively aerated
           • air extraction and treatment through a biofilter to manage odour
           • a pasteurisation phase (~21 days) to stabilise the material; and
           • a covered maturation phase (3–4 weeks) to produce finished compost material.

       The composting facility provides for the following processes:
          • receives, shreds, and blends green waste, this being the existing green waste material
             received at the NRRC
          • processes the material in an enclosed, aerated environment to accelerate
             decomposition

       2 Schedule 1, SC1.1 – Industry thresholds part (19)
       3 Process Design Strategy by OREZ – Attachment 3B




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility            Page 13

Page 14

“Specialist services and practical solutions”



           •    produces high-quality compost instead of mulch material
           •    has been designed to optionally incorporate limited food organics into the process in
                the future
           •    controls odour through enclosed processing and air treatment; and
           •    stores finished product under cover to minimise leachate and odour emissions.




       Figure 3B – Extract of Site Plan – Operational Zones

       The estimated volume of organic waste material to be processed is as follows:

       •   Green Waste – Expected to be about 30,000 tonnes per annum, with an initial intake of
           about 25,000 tonnes per annum.
       •   Food Waste – Expected to be about 2,000 tonnes per annum (excluding very high odour
           risk wastes) but could potentially process 4,000 tonnes of food waste a year; however, this
           would be low to medium odour food waste sources only, such as coffee grounds.
       •   Total Waste - Intake capacity of organic waste to be processed is not expected to exceed
           30,000 tonnes per annum; however, this may increase as population growth continues over
           time.
       •   Finished Product - Broadly similar tonnage to existing mulch outputs due to organic mass
           reduction during the composting process, which will be made available for sale as is
           currently the case for the existing mulched green waste material. The final product could
           be used for the manufacture of a soil conditioner, which is not intended to occur at the
           NRRC.

       6.2      Environmental Relevant Activity Requirements
       The NRRC operates under Environmental Authority (EA) EPPR01855314 effective from 30th
       January 2017. The EA includes the following environmentally relevant activities (ERAs):

       •   ERA 60 - Waste disposal 1: Operating a facility for disposing of, in a year, the following
           quantity of waste mentioned in subsection (1)(a) (a) less than 50,000t



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility             Page 14

Page 15

“Specialist services and practical solutions”



       •    ERA 62 Resource recovery and transfer facility operation:
               o 1 operating a facility for receiving and sorting, dismantling, baling or temporarily
                   storing 1(b) general waste;
               o 1 operating a facility for receiving and sorting, dismantling, baling or temporarily
                   storing 1(c) category 2 regulated waste; and
               o 2 operating a facility for receiving and sorting, baling or temporarily storing end-
                   of-life tyres only; and
       •    ERA 54 - Mechanical waste reprocessing 2: Operating a facility for receiving and
            mechanically reprocessing, in a year, the following quantity of general waste - (c) more
            than 10,000t.

       The approval for shredding and mulching green waste on site is covered by mechanical waste
       reprocessing (ERA54), which includes use of a grinder, crusher, miller, trommel or green waste
       shredder. The quantity stipulated in the EA is more than 10,000 tonnes, which is suitable for
       the green waste quantity to be processed.

       Composting is covered under ERA53, organic material processing, pursuant to Schedule 2 of
       the Environmental Protection Regulation 2019. An ERA53 includes composting of more than
       200 tonnes of organic material to manufacture soil conditioner, where organic material
       includes green waste. Adding composting to the existing operation at the NRRC is a
       concurrence ERA, which will require an amendment to the existing EA in accordance with s115
       (2) of the Environmental Protection Act 1994.

       An ERA53 is not a devolved ERA, therefore the development application is required to be
       referred to the State Assessment Referral Agency (SARA). It is expected that SARA will consider
       the proposed development and the technical reports provided at the referral stage and impose
       conditions with respect to the ERA53. Once the land use is approved, the applicant will make
       a subsequent application to amend the current EA. This is provided funding is available for the
       proposed composting facility. The EA will be amended before this component of the use
       commences.

       Collected leachate is returned to the process wherever it can be usefully absorbed, which
       recovers moisture and nutrients that would otherwise be lost and reduces the volume
       requiring separate management. Where leachate volumes exceed what can be usefully
       returned to the process, during high moisture ramp-up periods or where wetter feedstock
       streams are introduced, the surplus requires a dedicated storage and treatment pathway 4.

       It is noted that the NRRC currently contains a dedicated leachate holding tank as shown on
       the Master Plan (refer Figure 2). Further, the site is connected to reticulated sewerage, which
       provides a connection for the existing trade waste disposal associated with the current
       operation. The design provides for leachate tunnels that are enclosed. A new leachate holding
       tank forms part of the proposed development where there is excess leachate that is not able
       to be returned to the process. A sucker truck is also to be used to remove excess leachate from
       the tunnels.


       4 Process Design Strategy, part 2.3, page 11




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility             Page 15

Page 16

“Specialist services and practical solutions”



       The proposed built form to house the facility is a combination of covered roof structures and
       other buildings that have a maximum building height of 8.6m from finished ground level (refer
       Attachment 3C).




       Figure 3C – Extract of Site Elevations

       6.3      Technical Reports
       A number of technical reports have been prepared for the application, which are briefly
       summarised below. It is noted that a Noise Impact Assessment has not been prepared for the
       proposed composting facility. This is because the composting facility replaces the existing
       green waste mulching already occurring on the site. Further, the current operation also
       includes concrete crushing and other activities including heavy vehicle movements, which are
       also significant noise generating sources. Given the isolated location of the NRRC and its
       current operation, including some noise generating sources, it is not expected that the new
       composting facility would significantly worsen existing noise impacts emanating from the site.

       6.3.1 Traffic Impact Assessment

       The applicant has engaged Pekol Transport and Traffic who has prepared a Traffic Impact
       Assessment (TIA) for the NRRC, including the proposed development (refer Attachment 5).
       The TIA includes consideration of the existing operating conditions, the proposed composting
       facility, the existing and proposed internal road layout and weighbridge locations, traffic
       management within the site, including queuing lengths and any traffic impacts likely to be
       generated off the site, as well as any road safety implications.

       Based on the assessment undertaken the proposed development is expected to generate a
       total of 30 additional trips during the Tuesday and 28 additional trips during the Sunday peak
       hours. However, the additional traffic generated by the proposed composting facility does not
       warrant mitigation works on the state-controlled road network.




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility            Page 16

Page 17

“Specialist services and practical solutions”




       The traffic expert has made some recommendations about upgrading the current access and
       improvements to the internal intersection arrangements to prioritise inbound traffic travelling
       to the existing and proposed weighbridges.

       No road safety issues are raised with the proposed development. The TIA assessment does
       not raise significant traffic impacts with the current operation of the NRRC and including the
       proposed operation of composing facility.

       6.3.2 Odour Impact Assessment

       The odour expert Katestone has considered the proposed composting facility and the current
       operation of the NRRC, including the current mulching of green waste, undertaken modelling
       and provided an Odour Impact Assessment (refer Attachment 6).

       The composting facility will be designed to process 25,000 tonnes per year of green waste
       initially, with the flexibility to accommodate growth up to 30,000 tonnes per year within the
       built infrastructure. This represents a diversion of the green waste already accepted at the
       facility, along with an 8,000-13,000 tonne increase in capacity for green waste processing 5. The
       odour considered is from green and food organic waste, during pasteurisation of the
       composting product and from leachate.

       The odour expert has advised that even with the proposed composting operation, the primary
       odour-generating activity at the NRRC will remain consistent with the existing landfill
       operation. Odour emissions from the composting operation can be expected to be very
       different in character to those of the landfill operations. Such different odours do not have a
       cumulative effect to make stronger or more offensive odours. Further, the various odours
       simply do not tend to combine or interact in such a way.

       The modelling undertaken has demonstrated that the composting facility will have a negligible
       odour impact, being highly unlikely to lead to odour impacts at sensitive receptors. The
       assessment has identified that there is a greater likelihood of the current landfill operations
       contributing to odour impacts, which is consistent with the small number of complaints
       received in relation to the landfill operations.

       The odour expert advises that the odour impacts have only been predicted in the worst-case
       upper bound emissions scenario, consistent with best practice management measures for
       controlling odours from landfill, which should be adequate to ensure that impacts are
       minimised, if not entirely prevented. The odour expert has concluded that the proposed
       composting operation, provided it is well-managed, is highly unlikely to contribute
       meaningfully to any odour impacts 6.




       5 Odour Impact Assessment, part 2.2, page 3
       6 Odour Impact Assessment, part 8, page 20




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 17

Page 18

“Specialist services and practical solutions”



       It is also noted the applicant will be required to amend the current Environmental Authority
       (EA - EPPR01855314) for the current operation of the NRRC. This will provide for the operation
       of the composting facility (ERA53) to meet current environmental standards to prevent any
       environmental harm, in terms of noise, odour and water quality management from the existing
       operation and the proposed composting facility.

       6.3.3 Flood Impact Assessment

       An updated Flood Impact Assessment (FIA) dated January 2026 is provided (refer Attachment
       7).

       The FIA provides flood modelling for the site as whole and shows the proposed composting
       facility will not be affected during a 1% AEP event (refer Figure 4). It is my understanding that
       minimal earthworks are required for the construction of the proposed composting facility in
       the location shown resulting in minimal, if any change to the flood modelling for the site. In
       the circumstances, there is no need to update the flood modelling, which has recently been
       completed.

       The flood modelling has demonstrated the on-site overland flow paths are adequately
       conveyed within both the internal and external catchment flow areas. Further, there will be no
       actionable nuisance due to the change in peak water level, depth, velocity and hazard on the
       surrounding properties for all modelled AEPs 7.




       Figure 4 – Extract from Flood Impact Assessment (1% AEP for Stage 2)

       6.3.4 Stormwater Management Plan



       7 Flood Impact Assessment, Part 4 Conclusion, page 12




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 18

Page 19

“Specialist services and practical solutions”



       The applicant has provided an Interim Stormwater Management Plan (ISWMP) prepared by
       TOPO for the site as a whole (refer Attachment 8). At this stage, the ISWMP needs to be
       considered in context with the currently approved SWMP prepared by Covey (M25-004Rpt,
       dated February 2025 (refer condition 15 – Attachment 1A). Further, the completed SWMP will
       be provided by TOPO as soon as possible. It is expected that the finalised TOPO SWMP will
       replace the current Covey SWMP under the approval.

       It is stated by TOPO the objective is to provide an ISWMP for the site, taking into consideration
       the current conditions and future works, and identify how runoff will be managed to comply
       with the relevant guidelines and licence conditions. The consultant advises that once the layout
       for the future works, particularly the development of the northern portion of the site, is
       confirmed, hydrologic and hydraulic modelling will be undertaken to size all required drainage
       features. The SWMP addresses surface water only and does not include the management of
       groundwater or leachate 8.

       The stormwater management consultant has made a number of recommendations for the
       existing operation across the site and the design of the northern precinct redevelopment:
           • assess the catchments within the active filling zones and ensure all disturbed areas are
               being directed to an appropriately sized sediment control
           • inspect the eastern boundary on the edges of Catchments 12 and 22 and ensure all
               runoff has been managed in accordance with the site permit and discharged at an
               appropriate location
           • implement the recommendations of the TOPO concept design and Covey stormwater
               management plan for the upgraded HES basin at SW2
           • investigate options for the treatment of runoff from low erosion risk areas in the
               northern portion of the NRRC, which is likely to be bioretention systems.
           • Ensure all drainage for the NRRC is designed to convey peak flows associated with the
               1 in 10 year (10% AEP) event per DETSI 2025, or as required to ensure the necessary
               flow rates are conveyed to the HES basin to achieve the annual runoff treatment
               percentage necessary.


       7        Consultation

       While not a requirement under the planning scheme or the Planning Act 2016, the applicant
       has previously undertaken consultation with Kabi Kabi Peoples Aboriginal Corporation about
       proposed improvements at the NRRC. The proposed use of the site as a utility installation is
       consistent with the intended use community infrastructure and is not required to be publicly
       notified. Importantly, the proposed development does not extend beyond the existing
       operational footprint and does not raise any native title issues.

       The proposed composting facility is centrally located within the land and will improve and
       complement the existing organic waste management and processing on the site, without
       causing significant offsite impacts. In the circumstances, there is no need for additional
       community consultation to be undertaken.

       8 Stormwater Management Plan, Part 1.1, page 1




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 19

Page 20

“Specialist services and practical solutions”




       8         Planning Act 2016

       Under the Noosa Plan 2020 (the planning scheme) the proposed use is defined as a Utility
       installation which means premises for –
           a) a service for supplying or treating water, hydraulic power or gas; or a sewerage, drainage
                or stormwater service; or a
           b) transport service; or
           c) a waste management service; or
           d) a maintenance depot, storage depot or other facility for a service stated in paragraphs
                (a) to (d).

       The proposed composting facility is considered an ancillary component for organic waste
       processing as part of the ongoing waste management provided by the NRRC. The composting
       material once created could be used by the general public and or sold to other industries as a
       soil conditioning material. This remains consistent with how mulched green waste is currently
       used/sold to residents and third parties at the NRRC.

       The proposed “other change” for the composting facility is to be assessed under section 82 of
       the Planning Act 2016 (PA2016) and considered in context with the current development
       approval. The relevant provisions that apply are those as if the change application were the
       original development application, with the changes included, but made when the change
       application is made under section 82(2)(a) of the PA2016. The application is to be assessed
       under section 45 of the PA2016 and in accordance with the Development Assessment Rules.

       The intent of the reference to assessing and deciding the change application “in the context
       of the development approval” is that the proposed change should not be considered in
       isolation. Neither is the entirety of the development including the change re-assessed. Instead,
       it is intended the change be assessed with reference to the context of the development
       approval already existing9.


       9         State Policy Assessment

       9.1       South East Queensland Regional Plan

       Under part 2.2 of the planning scheme, the planning minister has identified that the Noosa
       Plan 2020 appropriately advances the South East Queensland Regional Plan 2017 (SEQRP) as
       it applies to the planning scheme area.

       While the SEQRP 2017 has been overtaken by the SEQRP 2023, the subject land remains within
       the Regional Landscape and Rural Production Area. The proposed composting facility forms


       9 Planning Bill 2015, page 91




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 20

Page 21

“Specialist services and practical solutions”



       part of the NRRC, which is community infrastructure and is consistent with planning outcomes
       under the SEQRP 2023.

       9.2      State Planning Policy 2017
       Under part 2.1 of the planning scheme, the planning minister has advised the State Planning
       Policy (SPP) dated July 2017 is appropriately integrated within the Noosa Plan 2020 in the
       following ways:
           • Liveable communities and housing
           • Economic growth
           • Environment and heritage
           • Safety and resilience to hazards;
           • Emissions and hazardous activities; and
           • Infrastructure.

       Under part 2.1.1, the State interests not integrated or only partly integrated, include:
          • Natural hazards, risk and resilience for coastal hazards, in part, with respect erosion
             prone areas.

       Given that the Minister has confirmed the SPP 2017 has been appropriately reflected in the
       planning scheme and that the site is not located near a coastal hazard, there is no need to
       consider the SPP 2017 in the assessment.

       9.3      Planning Regulation 2017
       Under the State Assessment Referral Agency (SARA) mapping, the site fronts a state controlled
       road, with the NRRC located on land within 25m of a State controlled road (refer Figure 5).




       Figure 5 – State Assessment Referral Agency (SARA) Mapping

       Under Schedule 10 of the Planning Regulation 2017 (PR2017) the application requires referral
       to SARA, pursuant to Part, 9, Division 4, Table 4, Item 1 being within 25m of a state transport
       corridor. It is noted the application was originally referred to the Department of Main Roads




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility             Page 21

Page 22

“Specialist services and practical solutions”



       (as a concurrence agency) under the current development approval. A copy of the State
       Development Assessment Provisions for State Code 1: Development in a state-controlled road
       is provided as Appendix A.

       Under Schedule 10, Part 5, Division 2, for a material change of use for a concurrence ERA under
       Table 2 that is not devolved to the local government is to be referred to SARA. A copy of the
       State Development Assessment Provisions for State Code 22: Environmental Relevant Activities
       is also provided as Appendix A.

       It is expected that SARA will consider the current application material and provide advice and
       impose conditions of approval relevant to the above state interests.


       10       Noosa Plan 2020

       10.1 Zoning and Tables of Assessment
       Under the planning scheme the subject land is included within the Community Facilities Zone
       and is designated Utility Installation (refer Figure 6).

       While part of Lot 77 is also included within the Environmental Management and Conservation
       Zone, this land is not affected by the proposed change. The subject land is over a relatively
       small portion of land included within the Community Facilities Zone when compared to the
       area of the land parcel (Lot 77) and generally well removed from surrounding rural residential
       properties. Further, the proposed composting facility is generally centrally located within the
       existing operational area.


                                                                      Existing NRRC operational area and
                                                                      location of Composting Facility




       Figure 6 – Extract of zoning plan on aerial photograph (Source: Noosa Council)




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                  Page 22

Page 23

“Specialist services and practical solutions”



       Under the table of assessment for the Community Facilities Zone (Utility installation) the use
       is code assessable being consistent with the annotation. The applicable codes for the
       assessment, include:
           • Community facilities zone code
           • Community activities code; and
           • Works codes - to the extent relevant discussed below.

       10.2 Overlay Mapping and Codes

       Under the overlay mapping, the subject site has the following designations:

           •    Land subject to acid sulfate soils – above 5m AHD to 20m AHD (refer Figure 7);
           •    Biodiversity – MSES Environmental values & Area of Biodiversity Significance (refer
                Figure 8);
           •    Bushfire hazard – Medium Potential Bushfire Intensity (Figure 9); and
           •    Flood hazard – Flooding and inundation (refer Figure 10).

       10.2.1 Acid Sulfate Soils Overlay




       Figure 7 – Extract of acid sulfate soils

       Under the Acid Sulfate Overlay the land for the composting facility potentially contains acid
       sulfate soils being above 5m and below 20m AHD. Despite this, the site is within the
       operational area of the NRRC and has been previously significantly disturbed. To the extent
       an earth works is required, this will be minimised and the disturbance of any acid sulfate soils
       can be managed.

       In accordance with condition 7 of the current development approval, the applicant is required
       to manage acid sulphate soils in accordance with the former State Planning Policy 2/02 -
       Planning and Managing Development Involving Acid Sulphate Soils. The proposed
       development therefore complies with the Acid Sulfate Soils Overlay Code.

       10.2.2 Biodiversity, Waterways and Wetlands Overlay




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility              Page 23

Page 24

“Specialist services and practical solutions”



       Under the Biodiversity, Waterways and Wetlands Overlay, the part of the land where the
       compost facility is to be located is not a designated an Area of Biodiversity Significance (refer
       Figure 8). Further, is well removed from the waterway towards the north and not close to the
       Riparian Buffer Area. In the circumstances, there is no need to address the Biodiversity,
       Waterway and Wetlands Overlay Code, given no vegetation is being removed and the matter
       of water quality has also been addressed (discussed below).




       Figure 8 – Extract of Biodiversity, waterways and wetlands

       10.2.3 Bushfire Hazard Overlay

       Under the Bushfire Hazard Overlay, the subject land is included within the Potential Buffer Area
       (refer Figure 9).




       Figure 9 – Bushfire hazard overlay

       Under a previous change to the development approval to provide for the new Waste Transfer
       Station, “Reviva Shop” and expanded Cleanaway Depot area, an updated Bushfire
       Management Plan (BFMP) was provided, which meets current standards (refer reference




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 24

Page 25

“Specialist services and practical solutions”



       documents under part 5 Development Approval - 132005.638.04). The approved BFMP
       requires provision of a fire trail to the north of the existing Cleanaway Depot.

       Having regard to the Bushfire Overlay Code, the following comments are provided:

       o   The development maintains the safety of people and property from the adverse impacts
           of bushfire (PO1).
       o   The proposed mitigation measures under the BFMP will have no further impact on the
           biodiversity values to the north, with an existing bushfire trail to be maintained (PO2).
       o   While the development is not connected to a reticulated water supply, suitable firefighting
           equipment and appropriately sized water tanks will be designed by the hydraulic
           consultant to meet current firefighting standards for the development, given the unusual
           nature of the site (PO3).
       o   The development forms part of the essential community infrastructure and does not
           increase the level of risk from bushfire (PO4).
       o   The proposed development will not adversely affect the impacts of bushfire on hazardous
           materials manufacturing or storing in bulk quantities (PO5).
       o   There are no residents associated with the development and appropriate evacuation of the
           site can be provided for staff and patrons attending the site as an ongoing operational
           requirement under the BFMP (PO6); and
       o   Adequate fire breaks and access for firefighting and other emergency vehicles are currently
           provided in accordance with the BFMP (PO8).

       The proposed development complies with the Bushfire Hazard Overlay Code.

       10.2.4 Flood Hazard Overlay

       Under the Flood Hazard Overlay, the site is subject to flooding during a 1% AEP event (refer
       Figure 10).




       Figure 10 – Extract of Flood Hazard Overlay Map (Source: Interactive Mapping)




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility             Page 25

Page 26

“Specialist services and practical solutions”



       The most recent flood study (Flood Impact Assessment, Covey, January 2026) has confirmed
       that the central area where the proposed compost facility is to be located is mostly free from
       flooding during a 1% AEP event for Stage 2 (refer Figure 4, above). The reduced ground levels
       in this part of the site are expected to remain about the same, therefore there is minimal if any
       change to the flood modelling.

       Having regard to the Flood Hazard Overlay Code the following comments are provided:

           •    The proposed development will maintain the safety of people and property (PO1);
           •    The design of the proposed development will be resilient to flood events, with no new
                buildings/structures located below a 1% flood event (PO6);
           •    The proposed development supports and does not unduly burden disaster
                management response or recovery or capabilities (PO7);
           •    The essential community infrastructure will be able to function effectively immediately
                after an extreme flood event, including for the composting facility (PO9);
           •    Any earthworks required by the development will be minor and will not result in
                increased flooding or ponding or affect the overall hydrology of the site and
                surrounding land (PO10); and
           •    The proposed development will not worsen and will improve public safety and the
                protection of the environment by ensuring hazardous waste materials including
                leachate will not be affected by flooding within the site (PO11).

       The proposed development complies with the Flood Hazard Overlay Code.

       10.2.5 Landslide Hazard Overlay

       Under the Landslide Hazard Overlay, parts of the subject land are affected by the mapping
       and designated a Moderate Hazard Area (refer Figure 11).




       Figure 11 – Extract of Landslide Overlay

       While part of the land is affected by the landslide overlay, the subject land where the proposed
       composting facility is to be located is relatively unaffected. In any event, the landslip hazard



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 26

Page 27

“Specialist services and practical solutions”



       mapping is likely a result of onsite management and changing landforms within the
       operational area over many years.

       Where the composting facility is to be located there is minimal if any risk of landslide. The
       nature of the site and operation requires specialist engineering advice for the construction of
       any of the facilities on the land, which has been obtained.

       The proposed development either complies with or can be conditioned to comply with the
       relevant overlay codes.

       10.3 Community Facilities Zone Code
       The purpose of the Community Facilities Zone Code is to provide for community related uses,
       activities and facilities whether publicly or privately owned including a utility installation, which
       is the case here.

       With respect to the most relevant performance outcomes the following comments are made:

           •    The proposed composing facility forms part of the existing community infrastructure
                consistent with the Community Facility Zone and the existing operation of the NRRC
                (PO1).
           •    The proposed composing facility is for community related purpose being an ancillary
                component providing for improved management of organic waste, including green
                waste and some limited low odour risk food waste products (PO2).
           •    The proposed composting facility is ancillary to the waste management onsite and
                entirely consistent with the specific purpose annotated on the zoning map (PO3).
           •    The composting facility will form part an intricate part of the current NRRC operation,
                within an accessible location that is well suited for the intended use and the population
                catchment it serves (PO4); and
           •    The proposed composting facility is of a type, scale and intensity consistent with
                community expectations for which there is an identified community need. The
                proposed development is a logical improvement to the current waste management
                services being provided at the NRRC. Further, the facility can be enhanced in the future
                with increased processing to benefit the local community and provide a product to be
                sold as a soil conditioner (PO5).

       With respect to other relevant performance outcomes about building design, the following
       comments are made:

           •    The proposed built form associated with the composting facility will have a maximum
                height of about 8.6m, which is below the expected building height for a pitched roof
                being 9m (AO17.2). The proposed development is centrally located and will not be
                visible from the Eumundi Noosa Road or nearby rural residential properties. The
                proposed development is single storey and respects the scale of the surrounding
                vegetation (PO17).
           •    The proposed composting facility will not significantly increase the plot ratio or site
                cover and will not present an appearance of building bulk to adjacent properties or the



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility                  Page 27

Page 28

“Specialist services and practical solutions”



                Eumundi Noosa Road. Further, will not affect the existing landforms or the vegetation
                screening buffer provided to the Eumundi Noosa Road, with no significant change to
                the current access arrangements (PO18).
           •    The proposed development is centrally located within the operational area of the NRRC
                and complies with all building setbacks (PO19).
           •    The building design is consistent with the existing use of the site for community
                infrastructure (PO20).
           •    The buildings have been designed to suit the purpose and will complement the existing
                operation having an industrial appearance consistent with nature of the existing use
                (PO21 – PO26).
           •    Under the current development approval providing for the new Waste Transfer Station,
                “Reviva Shop” and expanded Cleanaway Depot, reinforced planting is to be provided
                at the frontage near the access along Eumundi Noosa Road, which will enhance and
                protect the visual amenity of the major road network. Further, the proposed
                development will not cause any adverse offsite lighting impacts (PO27-PO33);
           •    The proposed composing facility forms part of the existing utility installation and will
                not adversely impact transport or other infrastructure, will not pose a health or safety
                risk, will be secure in this location and will maintain public safety (PO36); and
           •    The proposed development is supported by adequate infrastructure and will not affect
                the continued operation, viability and maintenance of existing infrastructure, with the
                site already connected to reticulated sewerage, for trade waste purposes (PO50-PO51).

       The proposed development is consistent with the Community Facilities Zone Code. The
       proposed composting facility will provide significant community benefit and will form an
       important part of the organic waste management process and treatment at the NRRC.

       10.4 Infrastructure Activities Code
       Under the purpose of the Infrastructure Activities Code, major utilities such as the NRRC, are
       to be provided in a coordinated and efficient way to meet the needs of existing and future
       communities. Further, are to be developed and designed in a manner which will not cause any
       adverse impacts on public health or the amenity of surrounding premises.

       With respect to the most relevant performance outcomes, the following comments are
       provided:
          • The proposed infrastructure is to be provided within the existing operational area and
              provides opportunities for cost efficiencies and minimises the environmental impacts
              when considering site as a whole. The proposed composting facility is a logical and
              practical extension to the exiting operation at the NRRC and makes use of existing
              infrastructure (PO1).
          • There is sufficient separation between adjoining land uses with the development wholly
              contained within a smaller part of Lot 77, and well removed from urban uses, as
              planned, and the land is expected to be utilised for this purpose. Given the nature of
              the existing use, along with the proposed composting facility being centrally located
              and replacing the current green waste mulching within the site, it is not expected that
              the development will worsen any adverse odour or other noise impacts already
              emanating from the current operation (PO2).



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 28

Page 29

“Specialist services and practical solutions”



           •    The proposed development will have no impact on adjoining premises or scenic
                amenity with the existing facility, including the change, to remain screened from
                Eumundi Noosa Road (PO3).

       With respect to the design requirements (Table 9.3.11.3) the most relevant performance
       outcomes are discussed below:
          • The siting and design of buildings are compatible with the existing setting and
              landscaped character of the area, given the nature of the existing use (PO4).
          • The infrastructure has been designed and sited to minimise the visual amenity impacts
              (PO5).
          • The purpose of the proposed infrastructure is to maximise the reuse and recycling of
              by-products associated with the operation of the NRRC (utility installation) consistent
              with the zone and current operation (PO12).
          • The proposed development will improve the level of risk to public safety for the
              operation of the NRRC with improvements being made at the access and egress to
              prevent right turns, with traffic flow within the site also being improved more generally
              with increased vehicle queuing (PO11).
          • The proposed development does not require the clearing of any native vegetation,
              being located within an existing operational area of the NRRC (PO13).
          • The proposed composting facility will be conducted in an environmentally responsible
              manner without causing adverse impacts on environmental values outside of the
              existing operational area. The proposed composting facility will not significantly
              worsen odour emissions currently being generated from the site. An updated
              Stormwater Management Plan will ensure that stormwater runoff and the operation of
              the facility will not worsen water quality being discharged from the site to the waterway
              towards the north. Leachate from the facility will be effectively managed onsite and
              discharged to a holding tank and ultimately connected to reticulated sewerage as trade
              waste. The proposed composting facility is also to operate in accordance with an
              amended Environmental Authority (EA) to include ERA53 (composting) (PO14); and
          • The location and design of the composting facility will not result in the release of
              hazardous materials into flood waters, with the land and infrastructure being located
              above the 1% AEP level with excess leachate to managed and stored onsite and treated
              and or disposed of in a responsible manner (PO15).

       The proposed development is consistent with the Infrastructure Activities Code.

       10.5 Works Codes

       In this case, the most applicable works codes include the following:

           •    Driveways and Parking Code; and
           •    Water Quality and Drainage Code.

       10.5.1 Driveways and Parking Code




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility              Page 29

Page 30

“Specialist services and practical solutions”



       Having regard to the most relevant performance outcomes under the Driveways and Parking
       Code, the following comments are made:

       •   Some minor improvements have been recommended under the Traffic Impact Assessment
           (TIA) to maintain safety, capacity and the operation of the existing road network. Further,
           the existing character and amenity of the streetscape will not be adversely affected by any
           works with existing vegetated screening fronting the Eumundi Noosa Road, which is to be
           enhanced under the current approval (PO1).
       •   The traffic expert has concluded that the existing access and egress is suitable and safe for
           the intended use but has recommended some upgrading in Eumundi Noosa Road to the
           dedicated channelised right turn lane being provided. It is noted that the egress from the
           site has already been modified to prevent right turns to mitigate the risk of angle crashes
           (PO2).
       •   The single access/egress location is being maintained in the same location and form
           subject to the modifications as explained in the TIA (PO3).
       •   The traffic expert has considered the existing access and egress and with the mitigation
           measures proposed the capacity, operation and maintenance of the existing infrastructure
           will be improved (PO4).
       •   Under table 9.4.1.4, minimum parking requirements for a utility installation is to be
           sufficient for the intended use. The proposed composting development will not
           substantially increase the demand for parking with six (6) spaces to be provided for the
           composting facility on this part of the site. There is a much larger area provided for parking
           as shown on the Master Plan (refer Figure 2) (PO6).
       •   The proposed development for the composting facility provides for additional
           weighbridges and an improved internal roadway configuration as part of the design. On-
           site vehicle parking and manoeuvring area and loading and manoeuvring areas for delivery
           and service vehicles have also been considered in the design (PO7).
       •   One of the proposed carparking spaces for the composting facility is provided for disability
           access (PO9).
       •   The ingress and egress point for the site is existing and is being improved as part of the
           development to improve safety and onsite operations (PO10).
       •   The proposed composting facility will not generate a significant increase in traffic
           movements or a significant demand for parking with adequate within the site in any event
           (PO16); and
       •   The parking and manoeuvring areas within the site will be considered under the ultimate
           Stormwater Management Plan (PO17-P019).

       Some mitigation measures are being undertaken for the existing ingress and egress as
       recommended by the traffic expert. The proposed development does not raise any safety
       concerns, given the scale of operation with an expected additional 34 vpd, which will not have
       a significant impact on the major road network.

       The proposed development including the composting facility, new weighbridges and internal
       road modifications comply with the Driveways and Parking Code.

       10.5.2 Water Quality and Drainage Code




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility               Page 30

Page 31

“Specialist services and practical solutions”



       The Interim Stormwater Management Plan (ISWMP) has been briefly discussed above (refer
       Attachment 8). A further full SWMP for the site as a whole will be provided as soon as possible.

       Having regard to the most relevant performance outcomes under the Water Quality and
       Drainage Code, the following comments are made:

            •   The SWMP will provide for the management of stormwater within the operational area
                of the site, including the proposed composting facility and will ultimately replace the
                previously approved SWMP prepared by Covey, dated February 2025, referenced under
                condition 15. The SWMP is being planned and will be designed having regard to the
                natural features and the need to avoid impacts and potential risks to ecological
                important areas, including during significant rainfall events (PO1).
            •   The SWMP will be designed to account for the flood risk on the site, provide for
                adequate drainage and ensure stormwater is discharged without altering the
                stormwater characteristics external to the site (PO2).
            •   The proposed stormwater drainage infrastructure is compatible with the drainage line
                traversing the site. Further, the improved SWMP will maintain water quality for
                important ecological important areas within the waterway north of the site (PO5 &
                PO6).
            •   The proposed development has been specifically designed to suit the site
                characteristics and will be constructed to maintain surface and ground water balances.
                The design of the stormwater and treatment system will utilise the new HES basin
                (Layout Plan - Stage 1) and will sustain the environmental values of water dependent
                ecosystems, including downstream aquatic, riparian, wetland and terrestrial
                ecosystems stemming from the waterway to the north of the operational area (PO13).

       The proposed development complies with the Water Quality and Drainage Code.


       11       Conditions of Approval

       It is reasonably expected that the conditions of approval will be updated and reflect the new
       proposal plans for the composting facility and other reference documents, including the
       Odour Impact Assessment, Traffic Impact Assessment, new Stormwater Management Plan (to
       be provided) and the updated Flood Impact Assessment (February 2026). Further, that the
       development approval will refer to the proposal plans for the composting facility, the updated
       Master Plans and the new Layout Plans for Stages 1, 2 & 3.

       It is requested that the staging of the development now be reflected in the approval, to remove
       any doubt about compliance. To clarify, the staging of the development will subject to funding
       and is expected to be as follows:

            •   Stage 1 – The completion and operation of the new HES Basin;
            •   Stage 2 – The construction of the proposed Composting Facility, including the
                upgrading of the internal roadways, new weighbridges and new hardstand area; and
            •   Stage 3 – The construction of the Waste Transfer Station, “Reviva Shop” and expansion
                of the Cleanaway Depot.



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility              Page 31

Page 32

“Specialist services and practical solutions”




       It is also expected that the works recommended by the traffic expert under the TIA to improve
       the level of safety in Eumundi Noosa Road will be undertaken as soon as possible to facilitate
       the existing operation and further improve road safety.

       The applicant requests an opportunity to discuss the conditions of approval under the change
       application prior to the issue of the Decision Notice – Other Change, which allows for the
       proposed composting facility, as well as the altered staging of other approved components
       for the NRRC.


       12       Conclusion

       The proposed composting facility is centrally located within the existing operational area of
       the NRRC. The proposed facility is a logical extension of the existing organic waste
       management and processing on the site, which currently includes mulching and the sale of
       mulched green waste material.

       The proposed composting facility will improve the processing of organic waste, which includes
       some limited low odour food waste products not currently being processed at the NRRC. The
       compost facility will significantly value add to the existing organic waste processing and will
       result in an improved product that can be sold and used as a soil conditioner. No soil
       conditioning is being proposed with the current proposal.

       The proposed composting will replace the existing green waste mulching on the site. The
       proposed composting facility considered an ancillary component of the existing utility
       installation and therefore consistent with the intended use of the land for waste processing
       and recycling.

       A number of specialist reports have been prepared that demonstrate that the proposed
       composting facility will not worsen any adverse odour or water quality impacts, which can be
       managed within the site. It is also not expected that the proposed composting facility will
       worsen existing noise impacts, given the nature of the use, which replaces the existing
       mulching of green waste. Further, the associated noise impacts need to be considered in
       context with other operational aspects of NRRC operation, including concrete crushing and
       the continuous movement of use of heavy machinery other vehicles.

       The proposed composting facility is well located within a central location within the NRRC,
       which is also isolated and removed from the surrounding rural residential properties. The
       design of the development will also result in improved access and road safety measures being
       implemented and improved traffic flow within the site with additional weighbridges and
       increased queuing for vehicles.

       The proposed development will improve onsite processing of organic waste products in the
       form of a compost that could be used as a soil conditioner and sold in a similar manner to the
       current mulched green waste material. The proposed composting facility will provide
       significant community benefit by improving the organic waste processing at the NRRC, without



       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility             Page 32

Page 33

“Specialist services and practical solutions”



       causing significant environmental harm, to be managed under an amended Environmental
       Authority to include ERA53 (composting).

       There are no town planning consequences resulting from the proposed development, which
       should be approved subject to reasonable and relevant conditions.




       23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility     Page 33

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Report - Other Change Composting Facility .pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.