Council archive · source document
Town Planning Report - Other Change Composting Facility · 132005.638.06
“Specialist services and practical solutions”
• ERA 62 Resource recovery and transfer facility operation:
o 1 operating a facility for receiving and sorting, dismantling, baling or temporarily
storing 1(b) general waste;
o 1 operating a facility for receiving and sorting, dismantling, baling or temporarily
storing 1(c) category 2 regulated waste; and
o 2 operating a facility for receiving and sorting, baling or temporarily storing end-
of-life tyres only; and
• ERA 54 - Mechanical waste reprocessing 2: Operating a facility for receiving and
mechanically reprocessing, in a year, the following quantity of general waste - (c) more
than 10,000t.
The approval for shredding and mulching green waste on site is covered by mechanical waste
reprocessing (ERA54), which includes use of a grinder, crusher, miller, trommel or green waste
shredder. The quantity stipulated in the EA is more than 10,000 tonnes, which is suitable for
the green waste quantity to be processed.
Composting is covered under ERA53, organic material processing, pursuant to Schedule 2 of
the Environmental Protection Regulation 2019. An ERA53 includes composting of more than
200 tonnes of organic material to manufacture soil conditioner, where organic material
includes green waste. Adding composting to the existing operation at the NRRC is a
concurrence ERA, which will require an amendment to the existing EA in accordance with s115
(2) of the Environmental Protection Act 1994.
An ERA53 is not a devolved ERA, therefore the development application is required to be
referred to the State Assessment Referral Agency (SARA). It is expected that SARA will consider
the proposed development and the technical reports provided at the referral stage and impose
conditions with respect to the ERA53. Once the land use is approved, the applicant will make
a subsequent application to amend the current EA. This is provided funding is available for the
proposed composting facility. The EA will be amended before this component of the use
commences.
Collected leachate is returned to the process wherever it can be usefully absorbed, which
recovers moisture and nutrients that would otherwise be lost and reduces the volume
requiring separate management. Where leachate volumes exceed what can be usefully
returned to the process, during high moisture ramp-up periods or where wetter feedstock
streams are introduced, the surplus requires a dedicated storage and treatment pathway 4.
It is noted that the NRRC currently contains a dedicated leachate holding tank as shown on
the Master Plan (refer Figure 2). Further, the site is connected to reticulated sewerage, which
provides a connection for the existing trade waste disposal associated with the current
operation. The design provides for leachate tunnels that are enclosed. A new leachate holding
tank forms part of the proposed development where there is excess leachate that is not able
to be returned to the process. A sucker truck is also to be used to remove excess leachate from
the tunnels.
4 Process Design Strategy, part 2.3, page 11
23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report - Other Change Composting Facility .pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.