Council archive · source document
Town Planning Report - Other Change Composting Facility · 132005.638.06
“Specialist services and practical solutions”
• The proposed development will have no impact on adjoining premises or scenic
amenity with the existing facility, including the change, to remain screened from
Eumundi Noosa Road (PO3).
With respect to the design requirements (Table 9.3.11.3) the most relevant performance
outcomes are discussed below:
• The siting and design of buildings are compatible with the existing setting and
landscaped character of the area, given the nature of the existing use (PO4).
• The infrastructure has been designed and sited to minimise the visual amenity impacts
(PO5).
• The purpose of the proposed infrastructure is to maximise the reuse and recycling of
by-products associated with the operation of the NRRC (utility installation) consistent
with the zone and current operation (PO12).
• The proposed development will improve the level of risk to public safety for the
operation of the NRRC with improvements being made at the access and egress to
prevent right turns, with traffic flow within the site also being improved more generally
with increased vehicle queuing (PO11).
• The proposed development does not require the clearing of any native vegetation,
being located within an existing operational area of the NRRC (PO13).
• The proposed composting facility will be conducted in an environmentally responsible
manner without causing adverse impacts on environmental values outside of the
existing operational area. The proposed composting facility will not significantly
worsen odour emissions currently being generated from the site. An updated
Stormwater Management Plan will ensure that stormwater runoff and the operation of
the facility will not worsen water quality being discharged from the site to the waterway
towards the north. Leachate from the facility will be effectively managed onsite and
discharged to a holding tank and ultimately connected to reticulated sewerage as trade
waste. The proposed composting facility is also to operate in accordance with an
amended Environmental Authority (EA) to include ERA53 (composting) (PO14); and
• The location and design of the composting facility will not result in the release of
hazardous materials into flood waters, with the land and infrastructure being located
above the 1% AEP level with excess leachate to managed and stored onsite and treated
and or disposed of in a responsible manner (PO15).
The proposed development is consistent with the Infrastructure Activities Code.
10.5 Works Codes
In this case, the most applicable works codes include the following:
• Driveways and Parking Code; and
• Water Quality and Drainage Code.
10.5.1 Driveways and Parking Code
23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report - Other Change Composting Facility .pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.