Original source · versioned page text
Approved Document Bushfire Management Plan 132004.5633.03
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn1.0 INTRODUCTION Wollemi Eco-Logical has been commissioned to undertake a Site-Specific Bushfire Hazard Assessment and to prepare a Bushfire Management Plan for a proposed development on the subject site (Figure 1). This report aims to assess the Bushfire Hazard and risk to the proposed development with regard to the Queensland State Government Single State Planning Policy - Part E (SPP 2017), the Bushfire Resilient Communities Technical Reference Guide (QFES, 2019) and the Noosa Plan 2017, Division 9 – Natural Hazards Overlays Code, and the Australian Standard – Construction in Bushfire Prone Areas (AS3959-2018). These documents detail both the State and Council interest in Bushfire Hazard with regard to determining suitability of development applications. It is noted that the Bushfire Hazard Assessment methodology is current as at March 2019. Subsequently, this report references currently available best-practice Bushfire Hazard Assessment and Risk Mitigation Methodologies, from the following sources: Vegetation Hazard Classification & Potential Fire-line Intensity for Queensland sourced from ‘A new methodology for state-wide mapping of bushfire prone areas in Queensland’. CSIRO, Australia. (2014); Bushfire Attack Level (BAL), Building setback requirements and Construction Standards as per the Australian Standard AS 3959- 2018 - Construction of buildings in bushfire prone areas. These methodologies are used in conjunction with Noosa Shire Council (NSC) Planning Scheme requirements to ensure appropriate assessment and mitigation of potential bushfire hazard is undertaken. Vegetation composition and extent, slope and industry standard Fuel Load calculations will be used to determine the Potential Bushfire Hazard acting on the proposed development. Once determined, Bushfire Risk Mitigation Measures are detailed in order to demonstrate compliance with Councils Planning Scheme performance outcome to ensure the safety of people and property in the event of a bushfire emergency. This BMP has been prepared by a suitably qualified Bushfire Consultant with 20 years relevant experience in Environmental Management & Bushfire Planning and Design experience specific to South East Queensland. It is noted that the following Bushfire Hazard Assessment Methodology and Bushfire Risk Mitigation Measures applied are current as at 2019. 30 April 2021 35 Rules Road, Pomona - Bushfire Management Plan V5 Page 4 www.wollemi-eco.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.