Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Development Application part 1 of 2

of 14

Page text read automatically using OCR, there may be inaccuracies

                         Place barcode here   lii~ii~iii
                                                80495436

         THIS IS THE NEXT PART OF A
      MULTIPLE PART RECORD

                  Part     r     Of)_

    Application number:               D{JvJ \){o)--"b 7

                                                   Box’
                                                      .
                                                             Q 51 30
                                                          ....................
                                                                                 .


                                                                                 .
                                                                                         I
                                                                                     .................   .




I\,~aroochydore


[OCR of page images]
ae

L_

Dev

SCRC CORRESPONDENCE

 

—

 

INO

95436

Place barcode her

 

THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD

Part t of_2

omen it C CO crissricee Settings\eje\Desktop\Multi ParKReapset Cover Sheet

4 AUG. Ph?

B

 

 

Marc

‘of 22 AUG 2012 Js

rooch hydore Rll 47

 

Log in to download the original (Development Application part 1 of 2.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 13 pages

Page 2

~   __:"’’’’       I...




               Application Details IDAS form 1                    -




               (Sustainable Planning Act 2009 version 1.0 effective 18 De    mber 2009)



               You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
               necessary information and documentation will result in your application not being a properly made application.

               For all development applications, you must:

               .
                     complete this form (Application details          -
                                                                          IDAS form 1)

               .     complete any other forms relevant to your application
               .     provide any mandatory supporting information identified on the forms as being required to accompany your
                     application.
               All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
               Planning Regulation 2009.

               Applicant details (note:the applicant is the person responsible for making the application and need not be the
               owner of the land. The applicant is responsible for ensuring the information provided on alllDAS application forms is

               correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
               be issued to the applicant.)


               Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
               applicant" button below.


               Name/s (individual or company name in full)                     Ivasard    Marine
                                                                                         Pty             Ltd



               For companies, contact name                                     IRob Donaldson


               Postal address                                                  1169 Avenue,
                                                                                    First                Bribie Island. 4507



               Contact phone number                                            07 34083822


               Mobile number (non-mandatory)


               Fax number (non-mandatory)                                      0734084006


               e-mail address (non-mandatory)




               1. What is the nature of development proposed? (tick all applicable boxes)



               D     material change of use of premises

               D building work
                                                                                                   D
                                                                                                     eVehO
               [8J operational work
               D reconfiguring a lot                                                                             ~el")t
                                                                                                               21
                                                                                                                 46
                                                                                                                          CO(j’l
                                                                                                   A
                                                                                                                   ~
                                                                                                                               ter
                                                                                                   IVI
                                                                                                          rO
                                                                                                                       ’(Jl?
                                                                                                               Oel)
                                                                                                                    ~ctore


[OCR of page images]
: | | | Integrated Development Assessment System form

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
¢ complete this form (Application details - IDAS form 1)
¢ complete any other forms relevant to your application

¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)

 

 

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.

 

Names (individual or company name in full) | \Vasard Marine Pty Ltd

 

 

 

 

 

 

 

 

For companies, contact name Rob Donaldson
Postal address 169 First Avenue, Bribie Island. 4507
Contact phone number 07 34083822
See >

Mobile number (non-mandatory) i
 —RECFEIVED— Cr

L
Fax number (non-mandatory) 107 34084006 | | 2 .

e-mail address (non-mandatory) SCRC
UF N

 

 

 

 

RD
1)

 

 

 

 

 

 

 

1. What is the nature of development proposed? (tick all applicable boxes)

 

material change of use of premises

building work Og Vv

sperat %,
perational work Phy,

reconfiguring a lot

OWOO

ie

SOE engi moaueratam ein ar iiiit : = P bapa ince |
ee ES en ace une iC a oe \> Government

 

Page 3

"
          .."




DDD
12. What type of approval is being sought?
    [8J development permit
    D preliminary approval
    D      both   -
                       provide details below


3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?



    [8J    No

    DYes complete table A and then go to question 5
                  -




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)


Table B          -
                      street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                                      Lot on plan
                        Street Address
                                                                                      description            Local government area

                        Unit   Street       Street name and official       Post              Plan type          (e.g. Logan,Cairns)
                                                                                  Lot No.
                         No.    No.          suburb/locality name          code             and plan no.

                                         /VOSS1’1 PrM../fOc
                  1            /0
                                         ,N’eQ)F1 /"IC...,t}{)s          11667 4- f((JIRJIIZ ;VOt?S:trlh-79--r
    D Street address / lot on plan
          Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
    D water
                  e.g. jetty, pontoon)
Table C          -
                      premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)


                        Coordinates (note: place each set of
                        coordinates in a separate row)                         Zone                               Local government
                                                                                                Datum
                                                                            reference                             area   (If applicable)
                          Easting       Northing    Latitude   Longitude
                                                                                            D GDA94
                                                                                            DWGS84
                  1
                                                                                            D other



5. Total area of the premises on which the development is proposed (indicate hectares or m2)




6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)




                11 1    Residential




7, Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)


    Installation of new pontoon




                                                                                                         Application Details   -
                                                                                                                                   IDAS form 1
                                                                                                           Version 1.018 December 2009


[OCR of page images]
 

 

ooo

2. What type of approval is being sought?

 

 

 

development permit
(1) preliminary approval
(] both - provide details below

 

3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

] No

[-] Yes - complete table A and then go to question 5

 

4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

Street Address tear om

P Local government area
Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code ‘| and plan no.

 

1 jo | OSA PARADE
NCOS A +7EAIDS
(J Street address / lot on plan
oO Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

48B7| & |KPIS3112| ben HERDS

 

 

 

 

 

 

 

 

 

 

 

Coordinates (note: place each set of

 

 

coordinates in a separate row) Zone Datum Local government
7 ; , reference area (If applicable)
Easting Northing | Latitude | Longitude
(J GDA94
1 ( wese4
(_] other

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate hectares or m*)

 

 

 

6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)

 

 

1 {Residential

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

Installation of new pontoon

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 4

.’       ,..




     ODD
     8. Is owner’s consenhequired for this application? (refer to notes at the end of this form for more information)



     ~ No
     DYes complete either table D, table E or table F as applicable
                    -




     9. Does the application involve a state resource? (e.g. the application involves state land, Or taking quarry
                                                                                                                         .




     materials. Refer to the notes at the end of this form for more information)



     ~No                                        DYes    -
                                                            complete table G



     110. Identify if any of the following apply to the premises (tick applicable box/es)
     ~         adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) complete table H
                                                                                                     -




     o         on   strategic port land under the Transport Infrastructure Act 1994 complete table I
                                                                                         -




     o         in a tidal water area      -
                                              complete table J

     Table H            Name of water body, watercourse or aquifer


               11           NOJ Srl            1/1./Lt.S,.,-

     11. Are there any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow,
                                                                 .




         water, etc.)


     ~No 0Yes                -
                                 ensure the   type, location and dimension of each easement is included in the plans submitted

     12. Does the proposal include new building work or operational work on the premises? (inclu~ing any
         services)

     oNo ~Yes                -
                                 ensure the nature, location and dimensions of   proposed works are included in plans submitted

     13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
         end of this form for more information)


     ~ No      -
                    Go to question 15                       DYes


     15. Has the local government agreed to apply a superseded planning scheme to this application under
         section 96 of the Sustainable Planning Act 2009?



     ~    No

     DYes provide details below
                    -




     16. List below all of the forms and supporting information that accompany this application (include alllDAS
     forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
                                                                                             -.




     question does not apply for applications made online using Smart ~DA)

                                                                                                             Method of lodgement to
                                              Description of attachment or title of attachment                 assessment manager


                        1




                                                                                                         Application Details   -
                                                                                                                                   IDAS fOlm 1
                                                                                                           Version 1.0 18 December 2009


[OCR of page images]
 

 

 

 

 

ooo

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)

 

 

 

XX] No
{_] Yes - complete either table D, table E or table F as applicable

 

9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

 

—X] No (Yes - complete table G

 

 

10. Identify if any of the following apply to the premises (tick applicable box/es)

 

—X] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
[__ onstrategic port land under the Transport Infrastructure Act 1994 - complete table |

(1 _ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

1 | MoesA s/LET—

 

 

 

 

11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)

 

[XINo_ [] Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

12. Does the proposal include new building work or operational work on the premises? (including any
services)

 

me Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)

 

 

[IX] No - Go to question 15 L] Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?

 

 

a)
[]_ Yes - provide details below

 

16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

 

Method of lodgement to

Description of attachment or title of attachment assessment manager

 

 

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

Page 5

 .’
      .’
        ,




ODD

117. Applicant’s declaration
   By        making this application, I declare that all information in this application is true and correct (note: it is
 ~ unlawful to provide false       or misleading information).




 Notes for completing this form


Question 8:
.     Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
      for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
      required under section 263, then an application must contain, or be accompanied by, the written consent of the
      owner, or include a declaration by the applicant that the owner has given written consent to the making of the
      application.
.     Owner’s consent is not required for a mobile and temporary ERA.


Question 9:
.     Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
      regulation may require the application to be supported by certain evidence prescribed under the regulation.
      Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
      required to be given, and the evidence required, to support the application.

Question 13:
.     The Building and Construction Industry (Portable Long Service Leave)Act 1991 prescribes when the portable
      long service leave levy is payable.
.     The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
      are   prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
.     The portable long service leave levy need not be paid when the application is made, but the Building and
      Construction Industry (Portable Long Service Leave)Act 1991 requires the levy to be paid before a development
      permit is issued.
.
      Building and Construction Industry Notification and Payment Forms are available from any Queensland post
      office or agency, on request from QLeave, or can be completed on the QLeave website at
      www.qleave.qld.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.

 Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
 accordance with the proces      and assessment of your application. Your personal details will not be disclosed for a
 purpose outside of the 10                      where required by legislation (including the Right to Information Act
                              ~~: except
 2009) or as required by P. rli~~ This’ rmation may be stored in a departmental database. The information
                                   reqUlrtV’ca
                                                        .




collected will be retaine     as                 he P       Records Act 2002.


OFFICE USE ONLY



Date received




                                                                 ncil.    have been engaged as the private certifier for the
To:                                                               .




                                                                         work referred to in this application.



Date of                                                                              BSA Certification       Building
                        Name
engagement                                                                           license number         classification/s




                                                                                                   Application Details   -
                                                                                                                             IDAS form 1
                                                                                                      Version 1.018 December 2009


[OCR of page images]
ooo

17. Applicant's declaration

 

 

 

 

x By making this application, | declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).

 

 

Notes for completing this form

Question 8:

e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

e Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:
e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable

long service leave levy is payable.
e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy

are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

e The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

e Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the proces: and assessment of your application. Your personal details will not be disclosed fora

OFFICE USE onty /

    
 

 

 

Date received

 

 

 

 

 

 

 

 

 

 

 

10: ilding’ work referred to in this application.
Date of Name BSA Certification Building
engagement license number classification/s

 

 

 

 

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 6

.
    ’,’   ,




ODD

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                                       Date receipted
                                               QLeave Project   Amount                 form sighted by Name of officer who
                     Description of the work                               Date paid
                                               Number           paid ($)               assessment       sighted the form
                                                                                       manager


              1


The Sustainable Planning Act 2009 (SPA)is administered by the Department of Infrastructure and Planning. This
form and          ll other required application materials should be sent to your assessment manager and any referral
ag’ ntte’S.




                                                                                              Application Details   -
                                                                                                                        IDAS form 1
                                                                                                 Version 1.0 18 December 2009


[OCR of page images]
ooo

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Description of the work

QLeave Project
Number

Amount
paid ($)

Date paid

Date receipted
form sighted by|Name of officer who
lassessment __|sighted the form

manager

 

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral

agenties.

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 7

      .,




,()        .,"




      Prescribed tidal work                                              -     IDAS form 28
      (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


      This form must be completed for development applications for prescribed tidal work.


      You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
      necessary information and documentation will result in your application not being a properly made application.


      For all development applications you must:

      .
                 complete Application details IDAS form 1
                                                 -




      .          complete any other forms relevant to your application
      .
                 provide any mandatory supporting information identified on the forms as being required to accompany your
                 application.

      All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
      Regulation 2009.

      11. What type of approval is sought?
      [8]development permit
      opreliminary approval

      2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable boxles)



                                                          Private use    Non-private use   Estimated value of completed works ($)



      0 jetty, pier or wharf                                       D            0
      0 mooring pile                                               D            0
      0 deck or boardwalk                                          D            0

      0 boat ramp or spillway                                      D            0

      [8] pontoon                                                  [gJ          0

      0 revetment, sea wall or retaining wall                      0            0

      0 other please specify below
                      -
                                                                   D            0

      3. Is the.application within a cql-de-sac, a bend in a waterway or other location where the side boundaries of
      the lot are connected to, the work and neighbouring lots are not at right angles to the waterway?


      [8]        No         DYes

      4. Has a registered professional engineer of Queensland (RPEQ),or an interstate equivalent, certified that the
      works comply wit", the design and safety pro isions oJ the IDAS code for development applications for
      prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
      mandatory)’                                            ’..




      o          No         [8]   Yes   -

                                            provide details below


[OCR of page images]
| | 4 Integ rice Development Assessment System form

 

Prescribed tidal work - IDAS form 28

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for prescribed tidal work.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications you must:

e complete Application details - IDAS form 1

e complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

 

1. What type of approval is sought?

 

 

 

KX] development permit
LJ preliminary approval

 

 

2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)

 

 

Private use Non-private use Estimated value of completed works ($)

 

jetty, pier or wharf

Oo

 

 

mooring pile

 

deck or boardwalk

 

 

 

 

pontoon

 

oO
|
boat ramp or spillway Oo
xX
Oo

revetment, sea wall or retaining wall

 

 

OOWOOOO
OOoO000o00

other - please specify below

O
Sqm;

LIL LLL

 

 

3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
ithe lot are connected to the work and neighbouring lots are not at right angles to the waterway?

KI No {] Yes

 

 

 

4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the
lworks comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)

 

 

 

( No Yes - provide details below

 
  

 
  

 
 
  

Oe Watcsacn |
aN Government

Department of Meee ull Planning Q@Plan

Page 8

~..   ’;,




      ODD
      Engineers name/s                             Ilan Barnes & Associates
      Organisation name (if applicable)

      Postal address
                                                   !PO   Box 1378. Caboollure. 4510


      Contact phone number                         10754958444
      Fax number (non-mandatory)

      e-mail address (non-mandatory)

      RPEQ number (or equivalent if
      interstate)                                  13333
      Reference number of all plans to which this certification relates               152425-00
      5. Confirm the following mandatory supporting information accompanies this application



      Plans certified by a registered professional engineer of Queensland
                                                                                           Confirmation of           Method of
      (RPEQ)(or an interstate or international equivalent registered with
      the appropriate professional body) showing:
                                                                                             lodgement              lodgement

      the location (real property description and boundaries) and dimensions
      of the proposed works in relation to the land (including tidal land) that         C8] confirmed
      would abut or adjoin the proposed works

      the proposed works in relation to the locations and levels of lowest
      astronomical tide, highest astronomical tide, mean high water springs             C8] confirmed
      and the coastal management district

      the slope angles of the beds and banks of the tidal area and the finished
      levels of the proposed works
                                                                                        C8] confirmed
      Written statements or evidence

      a copy of the certificate of title for the land (including tidal land) that

      would abut or adjoin the proposed works
                                                                                        C8] confirmed

      details of how the proposed work addresses the IDAS code for
      prescribed tidal work in the Coastal Protection and Management                    C8] confirmed
      Regulation 2003, schedule 4A

                                                                                        C8] confirmed
      details of the largest vessel, if any, to be moored at the structure
                                                                                        D not applicable
      evidence that the proposed work will not prejudice the access rights of
      adjoining property owners in the form of:
                .    letters of support from adjoining property owner; or
                                                                                        C8] confirmed

                .    plans illustrating a water allocation area.

      For applications within a cul-de-sac, a bend in the waterway or
      other location where the side boundaries of the lot connect to the
      work and neighbouring lots are not at right angles to the waterway
      must also provide:


      photos of any constructed neighbouring structures or information about            oconfirmed
      approved but unconstructed neighbouring structures.                               ~ notapplicable

      Privacy   -
                    please refer to your assessment manager for further details on the use of information recorded in
      this form.




                                                                                                   Prescribed tidal work   -
                                                                                                                               IDAS form 28
                                                                                                        Version 1.0 18 December 2009


[OCR of page images]
Oooo

 

Engineers name/s lian Barnes & Associates

 

 

Organisation name (if applicable)

 

 

 

 

 

 

 

 

Postal address PO Box 1378, Caboolture. 4510
Contact phone number [0754958444
Fax number (non-mandatory) [

 

 

e-mail address (non-mandatory) |

 

 

RPEQ number (or equivalent if
interstate)

 

3333

 

 

 

Reference number of all plans to which this certification relates 5 2425-00

 

5. Confirm the following mandatory supporting information accompanies this application

 

 

Plans certified by a registered professional engineer of Queensland
(RPEQ) (or an interstate or international equivalent registered with
the appropriate professional body) showing:

Confirmation of Method of
lodgement lodgement

 

the location (real property description and boundaries) and dimensions
of the proposed works in relation to the land (including tidal land) that XX] confirmed
would abut or adjoin the proposed works

 

the proposed works in relation to the locations and levels of lowest
astronomical tide, highest astronomical tide, mean high water springs _|[X] confirmed
and the coastal management district

 

the slope angles of the beds and banks of the tidal area and the finished

 

 

TZ
levels of the proposed works confirmed
Written statements or evidence

a copy of the certificate of title for the land (including tidal land) that [XJ confirmed

would abut or adjoin the proposed works

 

details of how the proposed work addresses the IDAS code for
prescribed tidal work in the Coastal Protection and Management X] confirmed
Regulation 2003, schedule 4A

 

KX] confirmed

details of the largest vessel, if any, to be moored at the structure
[not applicable

 

evidence that the proposed work will not prejudice the access rights of
adjoining property owners in the form of:
e letters of support from adjoining property owner; or [X| confirmed

e plans illustrating a water allocation area.

 

For applications within a cul-de-sac, a bend in the waterway or
other location where the side boundaries of the lot connect to the
work and neighbouring lots are not at right angles to the waterway
must also provide:

 

photos of any constructed neighbouring structures or information about i} confirmed
approved but unconstructed neighbouring structures. not applicable

 

 

 

 

 

Privacy - please refer to your assessment manager for further details on the use of information recorded in
this form.

 

Prescribed tidal work - IDAS form 28
Version 1.0 18 December 2009

Page 9

ODD
OFFICE USE ONLY



Date Received   I                             Reference Numbers



The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.




                                                                                   Prescribed tidal work   -
                                                                                                               IDAS form 28
                                                                                        Version 1.018 December 2009


[OCR of page images]
LILO

 

OFFICE USE ONLY

 

 

Date Received

 

 

Reference Numbers

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

 

Prescribed tidal work - IDAS form 28
Version 1.0 18 December 2009

Page 10

~
                     .
    !..
          ~I   ..~
               .




".             ’4




                                                                                               (;;::-:::’i:~’.’,:_~’’-1:..;r Ii.:’:>’,   ,-’
                                                                                                                                               ’-~i:":Y’




          Operational Works                                  -   IDAS Checklist 4
          (Sustainable Planning Act 2009, version 1.0, 18 December 2009)

          This checklist only applies when the development application seeks approval for operational works.

          You should complete all questions unless the checklist indicates otherwise.

          All planning and development applications require applicants to complete the following:

          .
                         Applicant details -IDAS form 1
          .
                         any forms or mandatory supporting information identified as forming part of your application.

          If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
          Infrastructure and Planning’s website, www.dip.qld.gov.au.

          The checklist and relevant sections do not need to be completed for applications relating only to building work
          requiring assessment against the Building Act 1975.


          Ipart 1            -   General questions

          1.1              Is the proposed operational work assessable under the planning scheme?



          I:8J No
                                 .      You must complete Building and operational work assessable against a planning scheme                               -
                                                                                                                                                               IDAS

          DYes                          form 6
                                 .      Continue on to question 1.3



          1.2              Is the proposed operational work assessable under any state planning regulatory provisions?



          I:8J No                .      Go to question 1.9

          DYes                   .      Go to question 1.4


          1.9              Is any ofthe proposed operational work associated with reconfiguring a lot and the reconfiguration is
                           also assessable?


          I:8J No
          DYes                   .      It is recommended that you complete part 6 of this checklist.


          1.10              Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
                            clearing of native vegetation?


          I:8J No
          DYes                   .      It is recommended that you complete part 7 of this checklist.


          1.11              Is any of the proposed operational work for any thing constructed or installed that allows, under the
                            Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
                            using a water truck to plJmp water; and other than under the Water Act 2000,section 20(2), (3)or (5),
                            or from a dam constructed on a watercourse or lake?




          I:8J No                .      It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

          DYes                   .      It is recommended that you complete part 8 (starting from question 8.1) of this checklist.


[OCR of page images]
 

Operational Works - IDAS Checklist 4

(Sustainable Planning Act 2009, version 1.0, 18 December 2009)

This checklist only applies when the development application seeks approval for operational works.
You should complete all questions unless the checklist indicates otherwise.

All planning and development applications require applicants to complete the following:

e Applicant details -IDAS form 1

e any forms or mandatory supporting information identified as forming part of your application.

If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www.dip.qlid.gov.au.

The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.

 

Part 1 - General questions

 

 

 

 

 

1.1 Is the proposed operational work assessable under the planning scheme?
No

° You must complete Building and operational work assessable against a planning scheme - IDAS
(Yes form 6

° Continue on to question 1.3

 

 

1.2 Is the proposed operational work assessable under any state planning regulatory provisions?

 

 

 

 

 

KX] No ° Go to question 1.9
L)Yes |e Go to question 1.4
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is

also assessable?

 

 

No
(1 Yes ° It is recommended that you complete part 6 of this checklist.

 

 

 

1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation?

 

 

KX] No
(Yes

1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
or from a dam constructed on a watercourse or lake?

 

It is recommended that you complete part 7 of this checklist.

 

 

 

 

 

KX] No
(Yes

It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

 

 

 

 

It is recommended that you complete part 8 (starting from question 8.1) of this checklist.

 

rastructure and (Jey

  

Page 11

ODD
1.12      Is any of the proposed operational work tidal work, other than excluded work defined under the
          Sustainable Planning Regulation 2009?


DNo
[2J Yes        .     It is recommended that you complete part 9 of this checklist.


1.13      Is any of the operational work proposed to be carried out within a coastal management district?



DNo
[2J Yes        .     It is recommended that you complete part 10 of this checklist.


1.14      Is any of the proposed operational work for constructing or raising waterway barrier works under the
          Fisheries Act 1994?


[2J No
DYes           .     It is recommended that you complete part 11 of this checklist.


1.15      Is any of the proposed operational work to be carried out completely or partly within a declared fish
          habitat area under the Fisheries Act 1994?



[2J No
DYes           .     It is recommended that you complete part 12 of this checklist.


1.16      Is any of the proposed operational work removing, destroying or damaging marine plants under the
          Fisheries Act 1994?


[2J No
DYes           .     It is recommended that you complete part 13 of this checklist.


1.17      Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
          Rivers Act 2005?


[2J No
DYes           .      It is recommended that you complete part 14 of this checklist.


1.18      Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
          state-controlled road?


[2J No
DYes           .      It is recommended that you complete part 15 of this checklist.


Section reference:
.         Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2


Ipart 8 Taking or interfering with water
           -




                                                                                       Operational works IDAS checklist 4
                                                                                                        -




                                                                                              Version 1.0 December 2009


[OCR of page images]
LIL

 

 

1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 2009?

 

 

(No
Kk] Yes

 

It is recommended that you complete part 9 of this checklist.

 

 

1.13 Is any of the operational work proposed to be carried out within a coastal management district?

[No

XX] Yes ° It is recommended that you complete part 10 of this checklist.

 

 

 

 

 

1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?

 

 

KX] No

(Yes ° It is recommended that you complete part 11 of this checklist.

 

 

 

 

1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?

 

 

KX] No
(Yes

 

 

It is recommended that you complete part 12 of this checklist.

 

 

1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?

 

 

[IX] No
Yes

 

It is recommended that you complete part 13 of this checklist.

 

 

1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

 

 

KX] No

L] Yes ° It is recommended that you complete part 14 of this checklist.

 

 

 

1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?

 

 

Ix] No

Yes ° It is recommended that you complete part 15 of this checklist.

 

 

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2

 

 

Part 8 - Taking or interfering with water

 

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Page 12

ODD
8.8     Is any of the proposed operational work for any thing constructed or installed that allows, under the
        Water Act 2000, for taking or interfering with artesian water (otherthan using a water truck to pump
        water)?


[8JNo

           .         You must complete Taking artesian or sub-artesian water -IDAS form 12.
DYes        .        This application requires assessment by the Department of Environment and Resource
                     Management as a concurrence agency.


8.9     Is any of the proposed operational work for any thing constructed or installed that allows, under the
        Water Act 2000, for taking overland flow water (otherthan using a water truck to pump water)?



                     Go to question 8.12.

10NO I’
DYes

8.12    Is any of the proposed operational work for any thing constructed or installed that allows, under the
        Water Act 2000, for taking or interfering with subartesian water (otherthan using a water truck to
        pump water)?


                     Go to question 8.14

10NO I’
DYes

8.14    Does any of the proposed operational work for any thing constructed or installed that allows, under
        the Water Act 2000,for interfering with overland flow water (otherthan using a water truck to pump
        water)?


                     Go to question 8.19

10NO I’
DYes

8.19    Is the proposed operational work for the following?


for the construction of a referable dam as defined under the Water Supply (Safety
                                                                                       DYes                ~ No
and Reliability) Act 2008

to increase the storage capacity of a referable dam by more than 10 per cent           DYes                ~ No



.       If yes to any of the above you must complete Referable dam IDAS form 16.
                                                                       -




.       This application requires assessment by the Department of Environment and Resource Management
        (DERM).If DERM is not the assessment manager for the application, the role of the agency will be as a
        concurrence agency and you must give DERM a copy of the application


Section reference:
.       Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
.       Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
.       Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
.       Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
        with subartesian water as assessable)
.       Wild Rivers Act 2005, section 43A
.       Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
        artesian water)
.       Relevant wild river declarations




                                                                                       Operational works   -
                                                                                                               IDAS checklist 4
                                                                                               Version 1.0 December 2009


[OCR of page images]
LILO

8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?

 

 

 

IX]No

 

° You must complete Taking artesian or sub-artesian water - IDAS form 12.
Yes ie This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.

 

 

 

8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?

 

 

KX] No ° Go to question 8.12.
L] Yes

 

 

 

 

8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?

 

 

KK] No . Go to question 8.14
(Yes

 

 

 

 

8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump

 

 

 

 

 

 

 

 

 

 

 

 

 

water)?
KX] No ° Go to question 8.19
CL] Yes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety iS
and Reliability) Act 2008 U1 Yes No
to increase the storage capacity of a referable dam by more than 10 per cent OO Yes &] No
° If yes to any of the above you must complete Referable dam - IDAS form 16.
° This application requires assessment by the Department of Environment and Resource Management

(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application

Section reference:

° Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4

° Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4

° Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11

e Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering

with subartesian water as assessable)

. Wild Rivers Act 2005, section 43A

. Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)

° Relevant wild river declarations

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Page 13

 .
     (




DDD
Ipart 9 Tidal work
            -




9.1       Is any of the proposed tidal work prescribed tidal work?


                       Go to question 9.10

lONe I.
~Yes

9.2       Is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the
          Wild Rivers Act 2005?




10Ne I.
DYes                   Go to question 9.6



19.3      Is the work proposed in a canal?




~Yes I.
lONe                   Go to question 9.5


9.5       Is any of the proposed tidal work for a marina with more than 6 vessel berths?



                .       In addition to this checklist, you must also complete Prescribed tidal work   -
                                                                                                          IDAS form 28.

~No             .      This application requires assessment by the Department of Transport and Main Roads as
                        concurrence agency.


                .       In addition to this checklist, you must also complete Prescribed tidal work   -
                                                                                                          IDAS form 28.
                .       This application requires assessment by the Department of Transport and Main Roads as
DYes                    concurrence agency.

                .       This application requires assessment by the Department of Community Safety as advice agency.


 9.14      Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?


one    only local government tidal area                                                   ~ Yes                D      No

starting in one local government tidal area and extending into another local
                                                                                          D    Yes             ~ No
government tidal area (but in no strategic port tidal area)
in two or more local government tidal areas but not starting in either local
                                                                                          D    Yes             ~ No
government tidal area
one    only strategic port tidal area                                                     D    Yes             ~ No
a tidal area that is not a   strategic port tidal area or a local government tidal area   D Yes                ~ No

 .         The answers you provide above may affect who the Assessment Manager is for the application.




Section reference:
 .         Sustainable Planning Regulation 2009, schedule 5, part 3, table 4, items 6 and 7
 .         Sustainable Planning Regulation 2009, schedule 7, table 2, items 13, 15 and 18
 .         Coastal Protection Management Act 1995, section 104A




                                                                                          Operational works    -
                                                                                                                   IDAS checklist 4
                                                                                                  Version 1.0 December 2009


[OCR of page images]
LIL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part 9 - Tidal work
9.1 Is any of the proposed tidal work prescribed tidal work?
[] No ° Go to question 9.10
kX] Yes
9.2 Is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the
Wild Rivers Act 2005?
No
LlYes |e Go to question 9.6
9.3 Is the work proposed in a canal?
[_] No
KX] Yes ° Go to question 9.5
9.5 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
In addition to this checklist, you must also complete Prescribed tidal work - IDAS form 28.
IX] No This application requires assessment by the Department of Transport and Main Roads as
concurrence agency.
In addition to this checklist, you must also complete Prescribed tidal work - IDAS form 28.
Cres This application requires assessment by the Department of Transport and Main Roads as
concurrence agency.
° This application requires assessment by the Department of Community Safety as advice agency.
9.14 Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
one only local government tidal area x] Yes [] No
starting in one local government tidal area and extending into another local o
government tidal area (but in no strategic port tidal area) [] Yes no
in two or more local government tidal areas but not starting in either local C Yes No
government tidal area
one only strategic port tidal area L] Yes XX] No
a tidal area that is not a strategic port tidal area or a local government tidal area [] Yes ] No

 

 

 

Section

The answers you provide above may affect who the Assessment Manager is for the application.

reference:

Sustainable Planning Regulation 2009, schedule 5, part 3, table 4, items 6 and 7
Sustainable Planning Regulation 2009, schedule 7, table 2, items 13, 15 and 18
Coastal Protection Management Act 1995, section 104A

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

 

Page 14

ODD
Ipart 10 Coastal management
              -




10.1    Is the proposed operational work for the following?



interfering with quarry material on state coastal land above high-water mark               DYes            ~ No

disposing of dredge spoil or other solid waste material in tidal water                     DYes            ~ No

draining or allowing drainage or flow water or other matter across state costal land       DYes                ~ No
above high-water mark

constructing or installing works in a watercourse where the works are not assessable                           ~ No
                                                                                     DYes
under Sustainable Planning Act 2009, schedule 3, part 1, table 4, items 3 or 4

reclaiming land under tidal water                                                          DYes                ~ No

constructing an artificial waterway, other than a canal, associated with reconfiguring                         ~ No
                                                                                           DYes
a lot


constructing an artificial waterway that is a canal, associated with reconfiguring a lot DYes                  ~ No

constructing an artificial waterway not associated with reconfiguring a lot on land,
other than state coastal land, above high-water if the maximum surface area of             DYes                ~ No
water on the waterway is at least 5000 square metres

constructing a bank or bund wall to establish a ponded pasture on land, other than         DYes                ~ No
state coastal land, above high-water mark


removing or interfering with coastal dunes on land, other than state coastal land, that DYes                   ~ No
is in an erosion prone area and above high-water mark



.       If you answered no to all of the above, then end of part 10 of this checklist.



Section reference:
.         Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
.         Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 5 and 6
.         Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15
.         Coastal Protection Management Act 1995, section 104A


Notes for completing this form:
.       Applicant details IDAS form 1 and Development application assessment IDAS checklist 1 must be
                            -
                                                                                       -




        completed for all development applications to be considered.
.       The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.


Privacy   -
              please refer to the assessment manager for further details on the use of information recorded in
this form.


Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
                                                                                                         this form.
consequence which may arise from your reliance on this process and the information contained on




                                                                                           Operational works   -
                                                                                                                   IDAS checklist 4
                                                                                                   Version 1.0 December 2009


[OCR of page images]
LILO

Part 10 - Coastal management

 

 

 

10.1 Is the proposed operational work for the following?

 

 

interfering with quarry material on state coastal land above high-water mark O01 Yes Kl No

 

disposing of dredge spoil or other solid waste material in tidal water Yes ] No

 

draining or allowing drainage or flow water or other matter across state costal land
above high-water mark

constructing or installing works in a watercourse where the works are not assessable
under Sustainable Planning Act 2009, schedule 3, part 1, table 4, items 3 or 4

Yes I No

 

0 Yes XI No

 

 

 

reclaiming land under tidal water Yes KI No
ae an artificial waterway, other than a canal, associated with reconfiguring ClYes No
constructing an artificial waterway that is a canal, associated with reconfiguring a lot |[] Yes & No

 

constructing an artificial waterway not associated with reconfiguring a lot on land,
other than state coastal land, above high-water if the maximum surface area of O1Yes XI No
water on the waterway is at least 5000 square metres

 

constructing a bank or bund wall to establish a ponded pasture on land, other than

state coastal land, above high-water mark OYes Xj No

 

removing or interfering with coastal dunes on land, other than state coastal land, that

 

 

 

 

is in an erosion prone area and above high-water mark OYes No

e If you answered no to all of the above, then end of part 10 of this checklist.

Section reference:

e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5

e Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 5 and 6

° Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15

. Coastal Protection Management Act 1995, section 104A

Notes for completing this form:

° Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
completed for all development applications to be considered.

° The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.

Disclaimer:

While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.