Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Development Application part 1 of 2

of 14

Page text read automatically using OCR, there may be inaccuracies

ODD
Ipart 10 Coastal management
              -




10.1    Is the proposed operational work for the following?



interfering with quarry material on state coastal land above high-water mark               DYes            ~ No

disposing of dredge spoil or other solid waste material in tidal water                     DYes            ~ No

draining or allowing drainage or flow water or other matter across state costal land       DYes                ~ No
above high-water mark

constructing or installing works in a watercourse where the works are not assessable                           ~ No
                                                                                     DYes
under Sustainable Planning Act 2009, schedule 3, part 1, table 4, items 3 or 4

reclaiming land under tidal water                                                          DYes                ~ No

constructing an artificial waterway, other than a canal, associated with reconfiguring                         ~ No
                                                                                           DYes
a lot


constructing an artificial waterway that is a canal, associated with reconfiguring a lot DYes                  ~ No

constructing an artificial waterway not associated with reconfiguring a lot on land,
other than state coastal land, above high-water if the maximum surface area of             DYes                ~ No
water on the waterway is at least 5000 square metres

constructing a bank or bund wall to establish a ponded pasture on land, other than         DYes                ~ No
state coastal land, above high-water mark


removing or interfering with coastal dunes on land, other than state coastal land, that DYes                   ~ No
is in an erosion prone area and above high-water mark



.       If you answered no to all of the above, then end of part 10 of this checklist.



Section reference:
.         Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
.         Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 5 and 6
.         Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15
.         Coastal Protection Management Act 1995, section 104A


Notes for completing this form:
.       Applicant details IDAS form 1 and Development application assessment IDAS checklist 1 must be
                            -
                                                                                       -




        completed for all development applications to be considered.
.       The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.


Privacy   -
              please refer to the assessment manager for further details on the use of information recorded in
this form.


Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
                                                                                                         this form.
consequence which may arise from your reliance on this process and the information contained on




                                                                                           Operational works   -
                                                                                                                   IDAS checklist 4
                                                                                                   Version 1.0 December 2009


[OCR of page images]
LILO

Part 10 - Coastal management

 

 

 

10.1 Is the proposed operational work for the following?

 

 

interfering with quarry material on state coastal land above high-water mark O01 Yes Kl No

 

disposing of dredge spoil or other solid waste material in tidal water Yes ] No

 

draining or allowing drainage or flow water or other matter across state costal land
above high-water mark

constructing or installing works in a watercourse where the works are not assessable
under Sustainable Planning Act 2009, schedule 3, part 1, table 4, items 3 or 4

Yes I No

 

0 Yes XI No

 

 

 

reclaiming land under tidal water Yes KI No
ae an artificial waterway, other than a canal, associated with reconfiguring ClYes No
constructing an artificial waterway that is a canal, associated with reconfiguring a lot |[] Yes & No

 

constructing an artificial waterway not associated with reconfiguring a lot on land,
other than state coastal land, above high-water if the maximum surface area of O1Yes XI No
water on the waterway is at least 5000 square metres

 

constructing a bank or bund wall to establish a ponded pasture on land, other than

state coastal land, above high-water mark OYes Xj No

 

removing or interfering with coastal dunes on land, other than state coastal land, that

 

 

 

 

is in an erosion prone area and above high-water mark OYes No

e If you answered no to all of the above, then end of part 10 of this checklist.

Section reference:

e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5

e Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 5 and 6

° Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15

. Coastal Protection Management Act 1995, section 104A

Notes for completing this form:

° Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
completed for all development applications to be considered.

° The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.

Disclaimer:

While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Log in to download the original (Development Application part 1 of 2.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.