Skip to the record
Beware of cheap imitations.

Council archive · source document

Development Application part 1 of 2 · OPW12/0287

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

      .,




,()        .,"




      Prescribed tidal work                                              -     IDAS form 28
      (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


      This form must be completed for development applications for prescribed tidal work.


      You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
      necessary information and documentation will result in your application not being a properly made application.


      For all development applications you must:

      .
                 complete Application details IDAS form 1
                                                 -




      .          complete any other forms relevant to your application
      .
                 provide any mandatory supporting information identified on the forms as being required to accompany your
                 application.

      All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
      Regulation 2009.

      11. What type of approval is sought?
      [8]development permit
      opreliminary approval

      2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable boxles)



                                                          Private use    Non-private use   Estimated value of completed works ($)



      0 jetty, pier or wharf                                       D            0
      0 mooring pile                                               D            0
      0 deck or boardwalk                                          D            0

      0 boat ramp or spillway                                      D            0

      [8] pontoon                                                  [gJ          0

      0 revetment, sea wall or retaining wall                      0            0

      0 other please specify below
                      -
                                                                   D            0

      3. Is the.application within a cql-de-sac, a bend in a waterway or other location where the side boundaries of
      the lot are connected to, the work and neighbouring lots are not at right angles to the waterway?


      [8]        No         DYes

      4. Has a registered professional engineer of Queensland (RPEQ),or an interstate equivalent, certified that the
      works comply wit", the design and safety pro isions oJ the IDAS code for development applications for
      prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
      mandatory)’                                            ’..




      o          No         [8]   Yes   -

                                            provide details below


[OCR of page images]
| | 4 Integ rice Development Assessment System form

 

Prescribed tidal work - IDAS form 28

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for prescribed tidal work.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications you must:

e complete Application details - IDAS form 1

e complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

 

1. What type of approval is sought?

 

 

 

KX] development permit
LJ preliminary approval

 

 

2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)

 

 

Private use Non-private use Estimated value of completed works ($)

 

jetty, pier or wharf

Oo

 

 

mooring pile

 

deck or boardwalk

 

 

 

 

pontoon

 

oO
|
boat ramp or spillway Oo
xX
Oo

revetment, sea wall or retaining wall

 

 

OOWOOOO
OOoO000o00

other - please specify below

O
Sqm;

LIL LLL

 

 

3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
ithe lot are connected to the work and neighbouring lots are not at right angles to the waterway?

KI No {] Yes

 

 

 

4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the
lworks comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)

 

 

 

( No Yes - provide details below

 
  

 
  

 
 
  

Oe Watcsacn |
aN Government

Department of Meee ull Planning Q@Plan

Used in these records

About this file

File size
9.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2.pdf · 9.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.