SDA-1116-034770 - Proposed nbn Facility at 23 Jirrima Cres Cooroibah - Response to Information Request
Attached to the e-mail SDA-1116-034770 - Proposed nbn Facility at 23 Jirrima Cres Cooroibah - Response to Information Request .eml, inside MCU16/0099 & OPW16/0218 - Proposed NBN Facility at 23 Jirrima Cres Cooroibah - Response to Information Request.
Please provide the following information in relation to the culvert crossing design:
- please provide information on why a bridge is not suitable at this site (i.e. the reason a
culvert has been proposed instead of a bridge)
The proposed works consist of replacing an existing culvert. A bridge would not be a practical option
for a low height structure in this instance.
- provide information or drawings which detail that the culverts cells extend 100 per cent of
the main channel width or that they comply with the self-assessable code.
The culvert cells are designed to extend 100 per cent of the main channel width, and the crossing
incorporates at least one (box) culvert with a minimum width of 1200mm in accordance with
WWWBW01 Part 3 for amber waterways.
- confirm that the culvert crossing and associated erosion protection are installed at no
steeper gradient than the waterway bed gradient
-
The culvert crossing is to be installed at the gradient of the existing waterway bed.
Prior to undertaking the works, the appointed contractor will prepare a Construction Environmental
Control Plan (CEMP) for approval, identifying risks and management of these risks during
construction, including associated erosion and sediment control/protection required.
- provide detailed designs showing that there are no drops in elevation at the joins of the
culvert invert, apron and scour protection, and how this will be maintained for the life of the
crossing
As shown within the detailed design drawings attached as Appendix B, there will be no drops in
elevation at the joints of the culvert invert, apron or scour protection.
- Confirm which is applicable:
o The culvert will be buried a minimum of 300millimetres to allow bed material deposit
and reform the natural bed on top of the culvert base, or;
o The base of the culvert is the stream bed, or;
o The base of the culvert cell is roughened throughout the culvert floor to simulate
natural bed conditions.
The culvert will be buried a minimum of 300mm to allow for bed material deposit and reform the
natural bed on top of the culvert base.
- Please indicate if any baffles or other roughening elements are to be used
According to WWBW01 Part 3, roughening is only required for red waterways, or amber waterways
where the culvert is installed at less than 300mm below the natural bed level. In this instance, the
proposed culvert will be installed at approximately 550mm below bed level, therefore no baffles or
other roughening elements are proposed to be used.
7. PO25 All waterway barriers are designed, constructed and maintained to provide adequate fish
passage for the site and fish passage is provided for the life of the barrier.
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.