Appendix C - Prelodgement Meeting Minutes · REC15/0011
Attached to the e-mail REC15/0011- Development Application - 1 lot into 11 lots plus balance lot - cover letter, IDAS forms, Reports, Plans - email 1 of 2.
Ls
-_ PRE-LODGEMENT NOTES
ese] NOOSA COUNCIL
PRELODGEMENT ADVICE SERVICES
PLANNING ASSESSMENT BRANCH
i L f :
Date 14/04/2015 | Application No | PLM15/0009
Applicant RPS GROUP
Applicant | Name a Title/Organisation
Attendees | JEREMY SCRIVEN PRINCIPAL RPS GROUP
DOUG REYNOLDS TOD CONSULTING
Council Name Title/Branch
Attendees | DENIS WALLACE PLANNING COORDINATOR
MARK LEWIS ENGINEERING COORDINATOR
JACK LEWIS DEVELOPMENT PLANNER
X | ROL
Xx Code Impact
Tewantin & Doonan Locality
Riparian Buffer Area
Environmental Protection Area
Watercourse & Drainage Line
Flood Hazard Area
Area Subject to Min. Floor Height
High & Low Potential Acid Sulphate Soils Areas
Development Type
Levelof Assessment
Planning Locality. |
Overlays
: OPOSAL
Street Address 1 GEORGE ST TEWANTIN QLD 4565
Real Property Description | LOT 1 RP 220516
Proposal Details RECONFIGURING A LOT - 1 LOT INTO 11 DETACHED
HOUSING LOTS AND A BALANCE ENVIRONMENTAL LOT
{Use Type; Number. of: Units/Lots;
Retail GFA, Car. Parking, etc)
This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
applicants about Council's policies for development. The recorded discussion items and outcomes in no way imply or commit to an
approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
development proposal have been raised / identified. When a format development application is lodged, the proposal will be
assessed on its planning merits in accordance with Council's policy framework existing at the time of the assessment.
FM6082/8-1 8/04/2013 Page 1 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
PLM Plans/Docs Title Supporting 122205-07B PROPOSED SUBDIVISION LOTS 1-11 & 900 Information 15513-SK01A | PRELIMINARY STORMWATER LAYOUT PLAN : y 15513-SK02A | PRELIMINARY SEWER RETICULATION (Provided by Applicant) LAYOUT JIN15513 A ENGINEERING REPORT 4. ADVICE & INFORMATION Planning | Officer — Denis Wallace The site has a split zoning under The Noosa Plan and is subject to a number of overlay constraints. The proposal involves subdivision for detached housing outside of the Detached Housing zone and within a number of overlays. Given the departure from planning scheme provisions, a report to a Council meeting will be required. Previous advice issued in association with REC14/0016 was discussed, including the content of Council’s Further Information Request. It was noted the proposal plans indicate dedication of Erosion Prone Areas (40m from H.A.T.) per previous State (SARA) pre-lodgment advice. The development involves relatively complex coordination of infrastructure and service routes and these were discussed at length. Council requests further rationalized lot and infrastructure layout to that shown on the submitted preliminary plans, addressing: e Southern lot boundaries that more closely align with the Detached Housing zone boundary. e Rationalised infrastructure within the park dedication area, with stormwater conveyed via pipes within the residential lots. e Coordination of frontage works (driveways, services, drainage devices, etc) to minimise tree removal. Given the rear lots will benefit from a high standard of amenity and are not surrounded by other dwellings, Council would be likely to support gross lot sizes of 800m’ at the rear if the application demonstrates suitable net building and open space envelopes can be provided and tree retention will be maximised as a result. Given the environmental constraints on the balance lands, public dedication for environmental park is considered warranted, with suitable access provided to biobasins and the like. The proposal involves clearing of mapped vegetation, with that assessment a Council matter (site is less than 5ha). A preliminary rehabilitation plan should be submitted demonstrating the likely vegetation removal from all associated works and demonstrating net-benefit rehabilitation of the proposed park area. Unitywater should be approached for pre-lodgment advice regarding their requirements for Water approvals (including depths/alignment/impacts on road reserve vegetation). This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective applicants about Council's policies for development. The recorded discussion items and outcomes in no way imply or commit to an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a development proposal have been raised / identified. When a formal development application is lodged, the proposal will be assessed on its planning merits in accordance with Council's policy framework existing at the time of the assessment. FM6082/8-18/04/2013 Page 2 of 3
Page 3
Civil Engineering Officer.- Mark Lewis The application will need to include the following prepared by the relevant specialists: Stormwater A Stormwater Management Plan addressing stormwater quality and quantity for the construction and operational stages of the development. The report must be able to demonstrate non-worsening for quality and quantity. This report would also need to consider the potential for Acid Sulphate soils within the site. In order to minimise the impacts on the vegetation to be retained outside the development area a piped inter-lot drainage system within the development area is required. The necessary bioretention basins must be located clear of the drip zone (as surveyed) of the vegetation to be retained. It is suggested that the number of bioretention basins be kept to a minimum. Maintenance paths must be provided to the basins. The paths must be sufficient to cater for Council’s regular maintenance vehicles. Works within George Street road reserve. There are concerns that the works within the George Street road reserve (provision of access and services to the lots) will have a significant effect on the existing vegetation. Provide a survey plan of the site’s frontage to George Street and extending to the proposed services connection points. Provide a plan of the proposed access driveways/service alignments and provide detail on the proposed construction methods which minimise the impacts on the existing vegetation and other infrastructure. Improvements to the existing road formation. Provide additional detail on the proposed methods to address stormwater runoff issues from the existing formation. In order to protect the existing vegetation and minimise the runoff entering the site it may be necessary to replace the existing flush kerb with an alternate kerb type that conveys runoff to the east and west of the site. 5. INFRASTRUCTURE CHARGES oe A request for written advice for an Infrastructure Contributions Estimate relevant to your proposal may be obtained for a fee of $211. 6. FURTHER ADVICE TO BE SOUGHT You are advised to contact Unitywater and any relevant Queensland Government Agencies for their specific requirements in respect of your proposal. M NOTES Council Project Director. >A. This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective applicants about Council's policies for development. The recorded discussion items and outcomes in no way imply or commit to an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a development proposal have been raised / identified. When a formal development application is lodged, the proposal will be assessed on its planning merits in accordance with Council's policy framework existing at the time of the assessment. FM6082/8-18/04/2013 Page 3 of 3
Page 4
Used in these records
Appendix C - Prelodgement Meeting Minutes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 731 KB (small file)
- File type
No other editions are linked here.