Appendix C - Prelodgement Meeting Minutes · REC15/0011
Attached to the e-mail REC15/0011- Development Application - 1 lot into 11 lots plus balance lot - cover letter, IDAS forms, Reports, Plans - email 1 of 2.
Civil Engineering Officer.- Mark Lewis The application will need to include the following prepared by the relevant specialists: Stormwater A Stormwater Management Plan addressing stormwater quality and quantity for the construction and operational stages of the development. The report must be able to demonstrate non-worsening for quality and quantity. This report would also need to consider the potential for Acid Sulphate soils within the site. In order to minimise the impacts on the vegetation to be retained outside the development area a piped inter-lot drainage system within the development area is required. The necessary bioretention basins must be located clear of the drip zone (as surveyed) of the vegetation to be retained. It is suggested that the number of bioretention basins be kept to a minimum. Maintenance paths must be provided to the basins. The paths must be sufficient to cater for Council’s regular maintenance vehicles. Works within George Street road reserve. There are concerns that the works within the George Street road reserve (provision of access and services to the lots) will have a significant effect on the existing vegetation. Provide a survey plan of the site’s frontage to George Street and extending to the proposed services connection points. Provide a plan of the proposed access driveways/service alignments and provide detail on the proposed construction methods which minimise the impacts on the existing vegetation and other infrastructure. Improvements to the existing road formation. Provide additional detail on the proposed methods to address stormwater runoff issues from the existing formation. In order to protect the existing vegetation and minimise the runoff entering the site it may be necessary to replace the existing flush kerb with an alternate kerb type that conveys runoff to the east and west of the site. 5. INFRASTRUCTURE CHARGES oe A request for written advice for an Infrastructure Contributions Estimate relevant to your proposal may be obtained for a fee of $211. 6. FURTHER ADVICE TO BE SOUGHT You are advised to contact Unitywater and any relevant Queensland Government Agencies for their specific requirements in respect of your proposal. M NOTES Council Project Director. >A. This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective applicants about Council's policies for development. The recorded discussion items and outcomes in no way imply or commit to an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a development proposal have been raised / identified. When a formal development application is lodged, the proposal will be assessed on its planning merits in accordance with Council's policy framework existing at the time of the assessment. FM6082/8-18/04/2013 Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Prelodgement Meeting Minutes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 731 KB (small file)
- File type
No other editions are linked here.