Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

PART RFI - Attachment 1 - Amended Master Plan

of 2

Plans and drawings: the text below has words only, no drawings.

Very large file (12.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                         IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                     CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                    AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                       ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                         COMMENCEMENT OF EXCAVATION
                                                                                                                                                                                      PROP
                                                                                                                                                                                           O
                                                                                                                                                                                      HES B SED
                                                                                                                                                                                           ASIN

                                                                                             CLEANAWAY
                                                                                               DEPOT

                                                                                                                                                                                                                                           CURRENT GREEN
                                                                                                                                                                                                                                             WASTE AREA,
                                                                                                                                                                              GRAVEL HARDSTAND,                                             FUTURE SCRAP
                           SITE ENTRANCE
                                                                                                                                                                              CLEANAWAY VEHICLE                                            METAL STOCKPILE
                                                                                                                            REVIVA                                               PARKING AREA                                                   AREA
                                                                                                                            CENTRE
                                                                                                                                                                                                                                                                           CURRENT GREEN
                                                                                                                                                                                                                                                                            WASTE AREA,
                                                                                                                                                                                                                                                                          FUTURE CONCRETE                                           EXISTING BOREHOLE TO BE
                                                                                                                                                                                                                               ENTRY AND EXIT TO                                                                                   RAISED TO SUIT ULTIMATE FSL
                                                                                                                                                                                                                                                                           CRUSHING AREA
                                                                                                                                                                                     ACCOUNT                                   GRAVEL HARDSTAND
                                                                                                                                                                                    CUSTOMER                                       PARKING
                                                                                                                                                                                   WEIGHBRIDGE


                                                                                                                                                                      PUBLIC                             CURRENT CONCRETE
                                                                                                                                                                   WEIGHBRIDGE                           CRUSHING AND SCRAP
                                                                                                                      TRANSFER                                                                          METAL STOCKPILE AREA,
                                                                                                                      STATION                                                                             PROPOSED FUTURE
                                                                                                                      BUILDING                                                       RRA                COMPOST FACILITY AREA
                                                                                                                                                                                     PAD

                                                                                                                                                                                                                                                                                                                        FUTURE
                                                                                                                                                                                                                                                                                                                       LANDFILL
                                                                                                                                                                                                                                                                                                                        CELL 3.1

                                                                                                                                                                                                            ACCESS ROAD
                                              EUMUNDI-NOOSA ROAD




                                                                                                                                         EXISTING
                                                                                                                                     TRANSFER STATION

                                                                                        FUTURE BUILDING




                                                                                                                                                                                                                                PROPOSED SOLAR FARM




                                                                       LEACHATE TANK FARM TANK STORAGE
                                                                         TO BE ITERATIVELY REVIEWED AND
                                                                                                                                                                                                                                                                                                                                                                      FUTURE
                                                                           REVISED DEPENDING ON SITE
                                                                                                                                                                                                                                                                                                                                                                     LANDFILL
                                                                          OPERATIONS. ALLOCATION TO BE
                                                                                                                                                                                                                                                                                                                                                                     CELL 3.2
                                                                       MADE/MAINTAINED FOR EXTENSION TO
                                                                       NORTH EAST OF EXISTING STRUCTURE




                                                                                                                                                                                                                                                                                            EXISTING
                                                                                                                                                                                                                                                                                            LANDFILL

                                                                                                                                                                                                                                                                                                                                          SCALE 1:1000 (A1) - 1:2000 (A3)

                                                                                                                                                                                                                                                                                                                                     Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                     Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                     Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                     Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                     services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                     contractor prior to commencement of works.

                                                                                                                                                        Approved
Checked -    CJT                                                                                                                                                                                             Drawing title -                                 Project -   DOONAN RESOURCE               Site -                      Project No.     244035       Sheet No.             C1000
Design -    CJT        Drawn -    KR
                                                                                                                                                                                                             SITE MASTERPLAN                                             RECOVERY REDEVELOPMENT        561 EUMUNDI-NOOSA ROAD,     Digital Ref :   C1000 SITE MASTERPLAN    Issue :        A
Scales -    AS SHOWN                                                                                                                                    COVEY ASSOCIATES PTY LTD    124 DUPORTH AVENUE                                                       Client -
                                                                                                                                                                                                                                                                         NOOSA SHIRE COUNCIL           DOONAN                        This Document is copyright and shall not be copied
                                                                   A   18.02.2025   PRELIMINARY ISSUE           CJT
                                                                                                                                                        ABN 59 137 305 992          PO BOX 16                                                                                                                                        without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                      (07) 5443 7777              MAROOCHYDORE QLD 4558                                                                                                                            for the Development and the Site Specified.
                                                                   Issue Date                     Description   By                                      [email protected]
       c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C1000 SITE MASTERPLAN.dwg                                                                                                                                                                                                          Plot 17 April 2025 - 10:03 AM
Log in to download the original file

PART RFI - Attachment 1 - Amended Master Plan.pdf · 12.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of the other 1 page

Page 2

                                                                                                                                                                                                                                                                                                                                                   IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                               CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                              AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                 ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                        GRAVEL HARDSTAND,                                                                                                                                                          COMMENCEMENT OF EXCAVATION
                                                                                                                                                                        CLEANAWAY VEHICLE
                                                                                                                                                                           PARKING AREA

                                                                                                                                                                                                  CURRENT GREEN
                                                                                                                                                             PROP                                   WASTE AREA,
                                                                                                                                                                  O
                                                                                                                                                             HES B SED                             FUTURE SCRAP
                                                                                                                                               REVIVA             ASIN
                                                                                                                                               CENTRE                                             METAL STOCKPILE                CURRENT GREEN
                                                                                                                                                                                                       AREA                       WASTE AREA,
                                                                                                                                                                                                                                FUTURE CONCRETE
                                                                                                 CLEANAWAY                                                                                                                       CRUSHING AREA
                                                                                                   DEPOT
                                                                                                                                                                                                                                                       CURRENT CONCRETE
                                                                                                                                                                                                                                                       CRUSHING AND SCRAP
                                                                                                                                                                                                                                                      METAL STOCKPILE AREA,
                                                                                                 SITE ENTRANCE                                                                                                                                          PROPOSED FUTURE
                                                                                                                                                                                                                                                      COMPOST FACILITY AREA



                                                                                                                                  TRANSFER                                                                                                                               FUTURE
                                                                                                                                  STATION                                                                                                                               LANDFILL
                                                                                                                                  BUILDING                                                                                                                               CELL 3.1

                                                                                                                                                                            ACCESS ROAD




                                                                                                                                                                                                                                                                                                   EXISTING
                                                                                                                                                                                     PROPOSED SOLAR FARM                                                                                           LANDFILL
                                                                                                                                                                                                                                                                                                    CELL 2.1
                                                                                                       EUMUNDI-NOOSA ROAD




                                                                                                                                             RU
                                                                                                                                               TC                                                                          EXISTING
                                                                                                                                                 HR
                                                                                                                                                    OA                                                                     LANDFILL                         EXISTING                     FUTURE
                                                                                                                                                      D
                                                                                                                                                                                                                            CELL 1.1                        LANDFILL                    LANDFILL
                                                                                                                                                                                                                                                            CELL 2.2                    CELL 3.2




                                                                                                                                                                                                                                                                                                                                                                  DRIVE
                                                                                                                                                                                                                                                                                                                                                               R HAY
                                                                                                                                                                                                                                                                                                                                                                 E
                                                                                                                                                                                                                                                                                                                                                             WALT
                                                                                                                                                                                                                                                                                                           FUTURE                HES BASIN
                                                                                                                                                                                                                                                                                                          LANDFILL
                                                                                                                                                                                                                                       EXPANSION CELL 1.1      EXPAN                                      CELL 3.3
                                                                                                                                                                                                                                                                        SION C
                                                                                                                                                                                                                                                                              ELL 2.2



                                                                                                                                                                       EMU MOUNTAIN ROAD




                                                                                                                                                                                                                                                                                                                                                    SCALE 1:2000 (A1) - 1:4000 (A3)
                                                                                                                                                                                                                                                               CLEAN WATER
                                                                                                                                                                                                                                                              DIVERSION DRAIN                                                                  Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                               Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                               Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                               Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                               the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                               services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                               contractor prior to commencement of works.

                                                                                                                                                          Approved
Checked -    CJT                                                                                                                                                                                              Drawing title -                               Project -   DOONAN RESOURCE                         Site -                       Project No.     244035       Sheet No.             C1001
Design -    CJT        Drawn -    KR
                                                                                                                                                                                                              COMPLETE SITE MASTERPLAN                                  RECOVERY REDEVELOPMENT                  561 EUMUNDI-NOOSA ROAD,      Digital Ref :   C1000 SITE MASTERPLAN    Issue :        A
Scales -    AS SHOWN                                                                                                                                      COVEY ASSOCIATES PTY LTD    124 DUPORTH AVENUE                                                    Client -
                                                                                                                                                                                                                                                                        NOOSA SHIRE COUNCIL                     DOONAN                         This Document is copyright and shall not be copied
                                                    A   18.02.2025   PRELIMINARY ISSUE                                      CJT
                                                                                                                                                          ABN 59 137 305 992          PO BOX 16                                                                                                                                                without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                        (07) 5443 7777              MAROOCHYDORE QLD 4558                                                                                                                                    for the Development and the Site Specified.
                                                   Issue Date                      Description                              By                            [email protected]
       c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C1000 SITE MASTERPLAN.dwg                                                                                                                                                                                                                    Plot 17 April 2025 - 10:03 AM

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.