RFI (rec. 5.06.26) 26-05-29_Lot 2 Taylor Ct Cooroy_DA Issue i
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
B
20
TENANCY 36 TENANCY 35 TENANCY 34 TENANCY 33 TENANCY 32 TENANCY 31
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
59 m2 59 m2 60 m2 60 m2 60 m2 60 m2
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
117 m2 60 m2 60 m2 60 m2 60 m2
TENANCY 12 TENANCY 13 TENANCY 14 TENANCY 15 TENANCY 16
B NORTH
20 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
01 FLOOR PLAN - BUILDING B REMI RAFTER
- LEVEL 2 Scale @ A3 1:200 LOT 18 TAYLOR COURT
COOROY
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ ST DJ
ST DJ
F 14.05.26 Concrete panel to caretakers
As Indicated 03.12.25
NOTE:- E
D
14.05.26
14.05.26
Preliminary WD Buildings A & B for coordination ST
RFI response with Civil Rev B added ST
DJ
DJ
2025-68
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY C 01.05.26 Revised stages & bin locations ST DJ 09
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS i
GSPublisherVersion 553.0.97.0
FLOOR PLAN - BUIDING B _ LEVEL 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI (rec. 5.06.26) 26-05-29_Lot 2 Taylor Ct Cooroy_DA Issue i.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.