RFI (rec. 5.06.26) 26-05-29_Lot 2 Taylor Ct Cooroy_DA Issue i
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
NOTE:
ARTIST IMPRESSION - COLOURS ARE INDICITIVE ONLY
01 BUILDING B
-
NORTH
02 BUILDING C
-
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ
F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
3D VIEWS
ST DJ
03 BUILDING D As Indicated 03.12.25
-
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 02
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS i
GSPublisherVersion 553.0.97.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI (rec. 5.06.26) 26-05-29_Lot 2 Taylor Ct Cooroy_DA Issue i.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.