RFI (rec. 5.06.26) 26-05-29_Lot 2 Taylor Ct Cooroy_DA Issue i
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
BUILDING B BUILDING C
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
BUILDING A
PART 01 PART 02
@ MIN 2o PITCH
@ MIN 2o PITCH
FALL
FALL
03 KEY PLAN
- LEVEL 1 Scale @ A3 1:2500
STAGE LEGEND
STAGE 1 BOUNDARY
01 FLOOR PLAN - BUILDING A
STAGE 2 BOUNDARY
STAGE 3 BOUNDARY NORTH
- LEVEL 2 - PART 01 Scale @ A3 1:200 STAGE 4 BOUNDARY
STAGE 5 BOUNDARY
A
20
TRIMDEK ROOF SHEETING
@ MIN 2o PITCH
FALL
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ
F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
ROOF PLAN - BUIDING A _ LEVEL 3
A
ST DJ
02 FLOOR PLAN - BUILDING A
20
Scale @ A3 1:200
As Indicated 03.12.25
- LEVEL 2 - PART 02
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 07
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS i
GSPublisherVersion 553.0.97.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI (rec. 5.06.26) 26-05-29_Lot 2 Taylor Ct Cooroy_DA Issue i.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.