Council archive · source document
TOURISM NOOSA FUNDING AND PERFORMANCE DEED 2026–2029 · ATTACHMENT 1_Tourism Noosa Funding and Performance Deed 2026-2029
SCHEDULE 2: Performance Adjustment Calculation
(For the purposes of simplifying this formula “KPIs and Target Metrics” are referred to as “KPIs”)
1. KPI tiers and points
Tier KPIs Points each
Highest 1, 2, 3 3 points
Middle 4, 5, 6 2 points
Lowest 7, 8 1 point
2. Deduction scale based on failed points
Scale
Failed points Deduction % Max deduction
1 10% $35,000
2-3 25% $87,500
4-5 50% $175,000
6-7 75% $262,500
8+ 100% $350,000
3. Example Scenario
KPIs not achieved: KPI 6, KPI 5, KPI 7
Step 1: Count failed points
KPI Tier Points
KPI 6 Middle 2
KPI 5 Lowest 1
KPI 7 Lowest 1
Total failed points 4
Tourism Noosa Funding Deed, 2026-29 Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
TOURISM NOOSA FUNDING AND PERFORMANCE DEED 2026–2029 · ATTACHMENT 1_Tourism Noosa Funding and Performance Deed 2026-2029AttachmentsMeeting 950 · read item & discussion ↗
About this file
- File size
- 391 KB (small file)
- File type
No other editions are linked here.