Council archive · source document
001A9301.001
Plans and drawings: the text below has words only, no drawings.
Text sections not matched to the original PDF pages. See original document to check page numbers.
Noosa Iconic Panel Decision Notice — Approval! with conditions >
Material change of use (Visitor Accommodation Type 4 - Conventional; Entertainment &
Dining Business Type 1 — Food & Beverages, & Retail Business Type 2 ~ Shop & Salon)
9, 11, 13 & 19 Hastings Street, Noosa Heads
21 May 2009
Town Water Supply
73. The site must be connected to Council's existing reticulated water supply in accordance
with Council's standards and requirements including;
a) Provision of a single Body Corporate water meter to measure the total water
consumption (including fire hose reels, but excluding fire hydrants and fire
sprinkler systems), and
b) Individual water meters to each tenement capable of being separately rated.
74. Water meters must be located outside the property boundary, clear of driveways and in
an easily accessible location for reading by Council.
. 75. The applicant must ensure that any construction works undertaken in the vicinity of
Council’s existing water supply will not adversely affect the integrity of the :
infrastructure. All costs associated with repair, replacement or alteration of existing
infrastructure must be met by the applicant
76. The applicant is advised that this development may require the provision of fire
hydrants and a booster pump in accordance with the Building Code of Australia, and
consultation may also be needed with Queensland Fire Services to ensure suitable fire
fighting infrastructure is provided. To this end any necessary fire hydrants shallbe
clearly shown on the plans submitted for both Operational Works and Building Works
approval and if a booster pump is deemed necessary, the plans shail indicate where the
fire truck is to be accommodated in order to provide boosting to the water supply.
Easements (Sewer and Public Thoroughfare) |
77. ~The applicant must provide a 3.0 metre wide sewer easement in favour of Council over
the Council sewerage infrastructure located within the development site. The easement
must be centrally located over the sewer pipe: ;
In addition, the Applicant’s Solicitor shall give Council’s Solicitor an appropriate |
undertaking in writing that the Title Deed and the easement documents will be lodged :
at the Land Titles Office and any additional Titles Office forms or requisitions :
requiring the consent of Council will be attended to promptly. |
A duly executed copy of the easement shall be submitted to Council for perusal prior to
the use commencing. Any changes required by Council’s Solicitor must be corrected
immediately.
78. The applicant must provide an access easement in favour of Council enabling 24 hour
unrestricted access to the Council sewerage infrastructure located within the basement
of the development.
In addition, the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged ;
at the Land Titles Office and any additional Titles Office forms or requisitions ,
requiring the consent of Council will be attended to promptly. ‘
A duly executed copy of the easement shall be submitted to Council for perusal! prior to |
the use commencing. Any changes required by Council’s Solicitor must be corrected
immediately.
79. Reference to the sewerage easement and access easement must be included in the Body
Corporate Community Management Statement. The following clauses must be included
in the Body Corporate Community Management Statement:
, Page 10 of 20 _See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A9301.001.pdfRelated documentPublic source context ↗
08/1787 - Decision Notice & Approved Plans - Noosa Iconic Panel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.