Noosa [conic Panel Attachments to Decision Notice — Approval with conditions
Material change of use (Visitor Accommodation Type 4 - Conventional, Entertainment &
Dining Business Type 1 — Food & Beverages, & Retail Business Type 2 — Shop & Salon)
9, 11, 13 & 19 Hastings Street, Noosa Heads
21 May 2009
ATTACHMENT A
Property ss (Lo/Plam se CC“‘CSC;C;*C‘*C
19 Hastings ST, Lot 12 Plan RP908660
4567 or
9 Hastings ST, Lot 4 Plan RP893438
4567 |
START OF CONDITIONS
General
1. All excess materials associated with the construction of the works are to be removed
from the site at the completion of the works and all wastes shall be collected from the
site and disposed of at a licensed waste facility.
2. Your attention is drawn to the provisions of the Environmental Protection Act 1994 and
the general environmental duty of care not to pollute the environment or create a
contaminated site when undertaking works.
Site Based Management Plan
3. _- Prior to the commencement of works, a Site Based Management Plan (SBMP) must be
prepared and be implemented during construction of the works. The SBMP must
identify all sources of environmental harm, including but not limited to the actual and
potential release of all contaminants, the potential impact of these sources and what
actions will be taken to prevent the likelihood of environmental harm being caused.
The SBMP must also provide for the review and ‘continual improvement’ in the overall
environmental performance of activities to which this approval relates.
The SBMP must address the following matters:
(a) environmental commitments - a commitment by senior management to achieve
specified and relevant environmental goals;
(b) identification of environmental issues and potential impacts;
(c) control measures for routine operations to minimise likelihood of environmental
harm;
(d) contingency plans and emergency procedures for non-routine situations
(including but not limited to the emergency protocol when spills occur and the
amount of neutralising agent to be kept onsite);
(e) organisational structure and responsibility;
(f) effective communication;
(g) monitoring of contaminant releases;
(h} conducting environmental impact assessments;
(i) _ staff training;
Gj) record keeping; and
(k) periodic review of environmental performance and continual improvement.
Page 2 of 9See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A9301.001.pdfRelated documentPublic source context ↗
08/1787 - Decision Notice & Approved Plans - Noosa Iconic Panel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.