Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

001A9301.001

of 39

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Text sections not matched to the original PDF pages. See original document to check page numbers.

Noosa [conic Panel                        Attachments to Decision Notice — Approval with conditions
                   Material change of use (Visitor Accommodation Type 4 - Conventional, Entertainment &
                  Dining Business Type 1 — Food & Beverages, & Retail Business Type 2 — Shop & Salon)
                                                       9, 11, 13 & 19 Hastings Street, Noosa Heads
                                                                                  21 May 2009

                                                                      ATTACHMENT A
Property            ss (Lo/Plam                      se                     CC“‘CSC;C;*C‘*C
 19 Hastings ST,       Lot 12 Plan RP908660
 4567        or
 9 Hastings ST,        Lot 4 Plan RP893438
 4567 |

                               START OF CONDITIONS

 General

 1.    All excess materials associated with the construction of the works are to be removed
       from the site at the completion of the works and all wastes shall be collected from the
       site and disposed of at a licensed waste facility.
2.     Your attention is drawn to the provisions of the Environmental Protection Act 1994 and
       the general environmental duty of care not to pollute the environment or create a
       contaminated site when undertaking works.
 Site Based Management Plan
 3. _- Prior to the commencement of works, a Site Based Management Plan (SBMP) must be
       prepared and be implemented during construction of the works. The SBMP must
       identify all sources of environmental harm, including but not limited to the actual and
       potential release of all contaminants, the potential impact of these sources and what
       actions will be taken to prevent the likelihood of environmental harm being caused.
       The SBMP must also provide for the review and ‘continual improvement’ in the overall
       environmental performance of activities to which this approval relates.

       The SBMP must address the following matters:
         (a) environmental commitments - a commitment by senior management to achieve
             specified and relevant environmental goals;
         (b) identification of environmental issues and potential impacts;
         (c) control measures for routine operations to minimise likelihood of environmental
             harm;
         (d) contingency plans and emergency procedures for non-routine situations
             (including but not limited to the emergency protocol when spills occur and the
             amount of neutralising agent to be kept onsite);
         (e) organisational structure and responsibility;
         (f) effective communication;
         (g) monitoring of contaminant releases;
         (h} conducting environmental impact assessments;
         (i) _ staff training;
         Gj) record keeping; and
         (k) periodic review of environmental performance and continual improvement.

 Page 2 of 9

Used in these records

About this file

File size
8.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A9301.001.pdf · 8.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.