Council archive · source document
Information Request REC14_0008 · REC14/0008
REC14/0008 Information Required 2 Provide an amended plan that meets the provisions of the Biodiversity Overlay Code. 3 Please provide a proposal plan with The Noosa Plan’s Biodiversity Overlay overlaid to provide clarity. ENGINEERING & HYDROLOGY Issue No Flood Assessment has been provided for the development. It is acknowledged that a Stormwater Detention and Flood Report was provided as part of the adjoining application (REC13/0146) and a third party review of this report is currently being undertaken for Council. Details will be provided on concerns and issues raised by the third party review as soon as possible. Please note Council has not yet accepted the Stormwater and Flood Report. Information Required 4 Provide a Flood Report for the development. 5 The lot layout may require amending subject to Councils acceptance or other revision of the Stormwater Detention and Flood Report. Issue No detail has been provided in regard to the proposed roadworks. The applicant will be required to construct the formation of Masonry Street connecting to the existing formation of Cordwood Drive within the existing road reserve. These works will also include a footpath on the western side of Masonry Street. The applicant has not provided any comment on the affects of any roadworks and associated filling on the flood plain. Information Required 6 Provide a preliminary engineering design for the necessary road works. The design must be prepared by an RPEQ and extend from the existing formation in Cordwood Drive for the full length of “Masonry Street”. The design must include: (a) Levels (natural surface and finished design) (b) Cross Sections and Longitudinal section (c) All banks and batters (d) Stormwater (e) Existing services (f) Temporary turnaround (if required) 7 Provide comment on the potential affects on the flood plain created by the proposed roadworks. Please note that the Q100 line indicated on the plans is part of the adjoining application and has not been accepted by Council at this time. Issue No detail has been provided on how stormwater from the proposed development and runoff from adjoining properties will be addressed during this stage. It is acknowledged that the applicant for the adjoining stages provided a proposed master plan for the redevelopment of the area including the subject site. Information Required 8 Provide a preliminary engineering design for the necessary stormwater drainage works. The design must be prepared by an RPEQ and include: Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request REC14_0008.pdfRelated documentApplication case desk ↗
About this file
- File size
- 44 KB (small file)
- File type
No other editions are linked here.