OpWorks Delegated Authority Report Appendix OPW17/0225

of 1

Text shows just the words. Original shows the document exactly as it was published.

Decision Notice: 31/08/2017
1.	APPLICATION DETAILS

Application No:	OPW17/0225
Street Address:	61 Elanda St SUNSHINE BEACH  QLD  4567
Real Property Description:	Lot 408 RP 48112
Planning Scheme:	The Noosa Plan (28 October 2016)

2.	DECISION DETAILS

The following type of approval has been issued:
Development Permit for Operational Work (Roadworks, Stormwater, Earthworks & Landscaping)

3.	RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 2 years starting the day that this development approval takes effect.

4.	ASSESSMENT MANAGER CONDITIONS
SITE SPECIFIC CONDITIONS
The stormwater disposal from the site shall be provided in accordance with: Drawings Nos 17044-2(A) and 17044-3(A) by Ian Bradford Plumbing Consultants and must include but not limited to the following:
Infiltration trench/s (units) installed to manufacturer specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant.
Roof charged pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant.
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all completed engineering works conform to the conditions of this Operational Works permit and the intent of the engineering design. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers
The supervising RPEQ or a suitably qualified person (eg plumbing consultant) must certify that completed stormwater drainage works are in compliance with  the conditions of this permit and best engineering practice particularly regarding the below surface charged pipeline and infiltration trenches. The details of inspections and confirmation of compliance must be included in final certification of the completed works.
The current owners and any subsequent owners are responsible for all ongoing maintenance of the stormwater drainage system on the site to ensure it performs in accordance with the intent of its design particularly for the charged stormwater pipelines and the infiltration trenches.
The design and construction of privately owned works must be undertaken in accordance with the approved plans and the relevant standards.  Structural integrity of the works will remain the responsibility of the property owner/developer and must be certified by an RPEQ.
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
14725-C001	C	General Arrangement and Details,  prepared by TOD Consulting	09/08/2017
-	-	Landscape Design-Garage Level	undated
-	-	Landscape Design-Lobby Level	undated
-	-	Plant Schedule, 61 Elanda St	undated

PRIOR TO COMMENCEMENT OF WORKS

Engineering
Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart.  The contact number to arrange a pre-start meeting is 5329 6291. The prestart meeting must include the parties for the following aspects of the works:
Civil engineering works;
Landscape works;
Erosion and sediment control works;
Other relevant parties.
Prior to arranging a Prestart meeting for the operational works, a security bond in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure the performance of all conditions of this approval.  The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit.  Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “prestart” meeting.
Condition report/s including photographs must be completed and submitted to Council prior to the prestart meeting and prior to any works commencing:
The frontage of the site.
All fences bordering the site.
Any buildings and structures on the adjoining properties could potentially be destabilised or impacted on by the proposed works.
The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
A Construction Management Plan must be submitted to Council for approval prior to the prestart meeting and must specifically address the following:
Traffic Management during all aspects of the construct phase including:
A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction.
Maintenance of safe pedestrian access across the frontage of the site at all times both during daily construction and after daily construction has ceased.
Closure of road verge during the construction of the new concrete pathway.
Proposed fencing to the site during the construction phase of the development.
Adequate parking arrangements for construction workers without adversely impacting on the local traffic or the availability of public parking spaces.
No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off.
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures.
Works programme identifying key components of the works and their respective durations.
Identification of complaint management procedures including:
Contact details for the on-site manager.
Dispute resolution procedures.
Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
General
All works must be constructed and work procedure undertaken in accordance with:
The approved plans and conditions detailed in this Decision Notice.
The relevant conditions of the higher order Material Change of Use approval file 132003.221172.7 (23657 DA) to which this approval relates.
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Driveway
Driveway crossover must be constructed generally in accordance with the approved plans and be in compliance with IPWEA Standard Drawings RS-049 and RS-050, and with a longitudinal profile that ensure standard vehicle entering or leaving the site will not bottom down or scrape.
Where there is adjoining a pedestrian path (existing or proposed), a crossfall must be provided for the driveway to match the gradient of the path, for the full width of the path.
The following must be complied with during the construction of the required crossover/driveway:
The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or plain/patterned concrete.
The driveway must be constructed so as not to concentrate stormwater runoff or ponding onto other properties or onto road verge and pathway.
Where applicable, underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway works.
Any stormwater kerb outlet in close proximity to the edge of the new driveways must be provided with an approved kerb adaptor.
Have a minimum clearance of 500mm from any Unitywater/Telstra asset, unless a written approval is obtained from Unitywater/Telstra and submitted to Council.
Have a minimum clearance of 1m from any power pole, unless a written approval is obtained from Energex and submitted to Council.
Pathway
A new 1.2m wide pathway must be constructed in compliance with the higher order approval and in accordance with the following requirements:
Be generally in accordance with the approved plans and in compliance with the higher order approval conditions and standard drawing IPWEAQ RS-065.
All paths, driveways and uncovered parking areas must have a slip resistant surface.
Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists.
The works must include any modifications to existing service covers to ensure the footpath finishes flush with all services and the like, so as not to create any pedestrian safety hazard.
For public safety, new pathway must terminate in a manner that ensures smooth transition to existing surfaces (eg grassed verge, existing adjoining pathway) and shall be extended beyond the frontage of the site if necessary to provide transition to match existing pathway.
Be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility.
Construction hold point(s) with Council’s delegate must be established once the pathway is ready for concreting.
Works within Road Reserve and Reinstatement Works
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All reinstatement and frontage works (eg kerb & channel, new concrete footpath) shall be constructed in accordance with the approved plans and must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Any existing kerb & channel and concrete footpath sections requiring removal due to the new works must be saw-cut and removed to allow for a smooth and neat finish with the new works.
Earthworks
All earthworks must be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical supervision and testing undertaken in accordance with Section 8 of the Standard and/or the recommendation of the certifying engineer (RPEQ).
The supervising RPEQ must confirm that any necessary earthwork stabilisation and earth retention works are carried out to ensure stability of the proposed development works, and that that development works will not cause, short or long term, adverse impact on the stability of adjoining properties and structures.
Stormwater Drainage
Stormwater drainage works must be carried out generally in accordance with the approved plans and the conditions of this approval (refer to Site Specific Conditions).
Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows).
Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3 and be in accordance with best applicable engineering practices.
Environment – Erosion & Sediment Control (E&SC)
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). The E&SC measures must include the protection of the existing stormwater inter-allotment drainage pipeline along the rear boundary.
Prior to the commencement of the use all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Landscape Works
Landscape works must be supervised, undertaken and certified by qualified persons*.  All works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
Landscape works must:
Delineate all planting to grassed area interfaces with a timber edge as per approved landscape plans
Ensure amenity or sales signage and ancillary infrastructure is not installed within the road reserve.
Ensure permanent irrigation is not installed within the road reserve.
Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment contamination and is applied to all planting areas to ensure a minimum 100mm depth once settled.
Street trees must:
Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
Be located in accordance with engineering requirements for safe vehicle and pedestrian sight lines.
Turfed areas must be must be free of pest, diseases and weeds and level with adjoining surfaces.
Damage to Services and Assets
Any damage caused to existing services, streetscape and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification - Landscaping Works
Prior to commencement of use Landscaping certification (prepared by a qualified person*) confirming all landscaping works have been constructed in accordance with conditions of approval and approved plans.
Certification - Engineering Works
Upon completion of the work and prior to the final inspection a certificate must be issued by the supervising RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
Final Inspection
A final inspection of the completed works by Council’s Inspector is required.
As Constructed Plans and ADAC XML Files
Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include:
As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection.
Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines.
The “As-Constructed” drawings will require certification by a:
Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and;
Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum.
The data must be in accordance with Council’s “Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels.
On Maintenance
All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to the commencement of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to council:
Certification that all works have been undertaken and completed in accordance with the requirements of this Permit
As Constructed details in accordance with Council’s Planning Scheme Policy
Off Maintenance
Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection.
A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where:
A Council inspection reveals works do not comply with approval requirements.
Submitted certification incorrectly states works comply with approval requirements.

5.	REFERRAL AGENCIES
Not Applicable.
6.	REFERENCED DOCUMENTS

Stormwater Quantity Assessment, dated 03/08/2017, prepared by Aquaintel Consulting.

7.	ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Amendments to plans and/or any requested changes to the conditions of this decision notice should be made within the appeal period or the suspended/extended appeal period. Alternatively, an application for “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made along with Council’s applicable fees.
Prestart, On and Off Maintenance Inspections Request
Contact Council on 5329 6291 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period of 20 business days should have been passed or the applicant has have confirmed by a letter or an email that he/she has accepted the conditions of Decision Notice and waived his/her appeal right.
If Council officers are required to undertake additional inspections of the same works, a re-inspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise.
Qualified Person - Landscaping
Qualified Person, for the purpose of:
Supervising landscape works and preparing a landscape certification, is considered to be a landscape architect, landscape designer or horticulturist with a minimum of three years current experience in the field of landscape design.
Environmental Advisory note
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include:
the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council;
Best Practice Erosion and Sediment Control, International Erosion Control Association (2008)
As a general rule, a site is determined to have achieved effective short-term stabilisation if at the completion of the works:
Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and
Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination.
If at the time of the completion of the works, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability:
Evidence that the site has been effectively stabilised in the short term;
Evidence that soil has been adequately ameliorated;
Evidence that seed of annual and perennial grass species has been applied at an adequate rate; and
That grass seed has germinated at a density that is likely to achieve an effective grass cover.

Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that:  “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.”   It is an offence to fail to comply with the duty of care.  Substantial monetary penalties may apply to individuals or corporations breaching this duty of care.  Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
8.	PROPERTY NOTES
Not Applicable.
9.	PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable.
10.	FURTHER DEVELOPMENT PERMITS REQUIRED
Not Applicable
11.	SELF ASSESSABLE CODES
Not Applicable.
12.	SUBMISSIONS
Not Applicable.
13.	REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.
14.	RIGHTS OF APPEAL
You are entitled to appeal against this decision.  A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.
During the appeal period (normally 20 business day), you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval.  If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued.  Only one “negotiated decision notice” may be given.  Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”.
15.	OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.

Yours faithfully

Monkeith Kadhum
Development Engineer

enc:	Approved Plans
Appeal Rights

cc	Unitywater

[word/footer1.xml]
Page 6 of 10

Used in these records

About this file

File size
49 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

OpWorks Delegated Authority Report Appendix OPW17_0225.docx · 49 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.