Original source · versioned page text
16-02-23 Noosa Council Ltr
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
9 February 2023
Table of Contents
1 INTRODUCTION 3
2 CONSTRUCTION PHASE 3
3 OPERATIONAL PHASE 4
3.1.1 Bioretention Basin....................................................................................................................................... 4
3.1.2 Rainwater Harvesting Tank ..................................................................................................................... 5
3.1.3 Basement Pump Systems .......................................................................................................................... 7
Table of Tables
Table 1 - General recommended program of inspection and maintenance – Bioretention Basin 5
Table 2 - General recommended program of inspection and maintenance – Rainwater tanks 6
Table of Appendices
Appendix 1 MPN Plans 8
Appendix 2 Bioretention Basin Construction Checklists and Forms 9
Appendix 3 Bioretention Basin Maintenance Checklist 10
Appendix 4 Rainwater Tank Maintenance Checklist 12
Excellence with Economy in Engineering 2
https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-8999/8600-
8699/8662/reports/09-02-23 operational management and maintenance plan_issue b.docx`
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.