Skip to the record
Beware of cheap imitations.

Original source · versioned page text

16-02-23 Noosa Council Ltr

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 32, section 1. The text section number identifies this passage in the reader.

 9 February 2023



3 OPERATIONAL PHASE
3.1.1 Bioretention Basin

3.1.1.1 General
Vegetation in the bioretention basin plays a key role in maintaining the porosity of the filter media
and a strong healthy growth of vegetation is critical to its performance. The establishment of
plants after the construction phase and ongoing maintenance is therefore a fundamental part of
the operation of the entire device.

Overflow pits require careful monitoring, as these are prone to scour and a build-up of sediment,
debris and gross pollutants. Debris can block outlets and can be unsightly. Inspection and removal
of debris should be undertaken regularly and debris should be removed whenever it is observed
on-site.

3.1.1.2 Maintenance Program
Maintenance of the bioretention basin would involve the following activities:

     •    Removal of sediment where it is smothering the bioretention basin vegetation;
     •    Manual removal and management of invasive seeds. Note herbicides should not be used as
          they would contaminate the downstream receiving waters;
     •    Debris removal in the bioretention basin and adjoining areas;
     •    Repair any damage to the profile as a result of scour, rill erosion or vehicle damage by
          replacement of appropriate fill (to match onsite soil) and revegetation;
     •    Till the bioretention basin surface, or remove the surface layer, if there is evidence of
          clogging;
     •    Regularly water the basin vegetation until plants are established and actively growing;
     •    Fertilising of plants with environmentally friendly products;
     •    Removal of plants that have died and replacement with plants of equivalent size and
          species as detailed in the Landscape Architect’s planting schedule;
     •    Pruning to remove dead or diseased vegetation material and to stimulate growth;
     •    Vegetation pest monitoring and control; and
     •    Inspection and repair of the subsoil drainage system.

Table 1 below sets out the recommended frequency for inspections and maintenance of
bioretention basins during the Operational Phase. Note the Schedule is a guideline only. Routine
clean out and maintenance should be scheduled based on the outcome of routine inspections.




 Excellence with Economy in Engineering                                                                 4
 https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-8999/8600-
 8699/8662/reports/09-02-23 operational management and maintenance plan_issue b.docx`
Log in to download the original file

16-02-23 Noosa Council Ltr.pdf · 13.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.