Skip to the record
Search everything, all in one place.

Original source · versioned page text

16-02-23 Noosa Council Ltr

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 44, section 1. The text section number identifies this passage in the reader.

FORM D — FINISHED LEVELS

Purpose: To ensure finished levels of system surface and bunds are correct and meet the design.

ACTION (IF

ITEMS CHECKED SATISFACTORY UNSATISFACTORY)

INITIAL

|
Landscaping topsoil applied to |
surrounding bunds to achieve design
levels

As-constructed survey of system surface |

 

and surrounding bunds completed

Final constructed levels are consistent
with design levels

Under-drainage clean-outs extended 50-
150 mm above filter media

Under-drainage pipes flushed to remove

initial ingress of material

HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)

 

NB: As constructed survey and drawings and photos attached

Signed by superintendent: Signed by bioretention designer:
Print name: Print name:

Date: Date:
Log in to download the original file

16-02-23 Noosa Council Ltr.pdf · 13.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.