16 February 2023
Issue
The submitted material does not include sufficient detail on the proposed construction
methodology for the construction of the excavation and the basement retaining structures
9. Provide additional detail on the proposed construction methodology for the construction
of the excavation and the basement retaining structures. Please note that the works
must not impact on any adjoining infrastructure, buildings or vegetation. All retaining
works and anchors systems, both above and below ground, both temporary or
permanent, must be wholly contained within the subject site.
Response:
Please refer attached construction methodology for the basement excavation and retaining by
Stockwell Design and Construction.
Should you require further information or clarification on any items within this request for information
response please feel free to contact the undersigned.
Yours faithfully
Lachlan Stephenson
For and on behalf of
MPN CONSULTING PTY LIMITED
ls:ls
Excellence with Economy in Engineering 5
https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-
8999/8600-8699/8662/letter/16-02-23 noosa council ltr.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.