Council archive · source document
07/1881 - Operational Works - Landscaping [As Published] · 142007.1881
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)
work in ee district C1 (i) _ tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
focal govemment Ecal areas refer to Guide 24, C1 (ii) tidal work that is prescribed tidal work" other than in a canal’2 -complete Pat P of Form 1: of
te crndesion menue seceementty he 8, D1 ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
scape | TO oe tacos re srceen ts tom coer
‘lation to tis gency for ‘he application in to be assessable against the Water Act 2000 ;
boca Eaaaleh is he assessment manager (1 (b) constructing a canal’? intended to be connected to tidal waters;
(©) constructing an artificial waterway;
[0 @)_ reclaiming land under tidal water;
LJ (e) disposing of dredge spoil or other solid waste material in tidal water;
(1 (A) _ interfering with quarry material on State coastal land above high-water mark;
(1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
( (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
C1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal and, above high-water mark; or
(iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)
mark infomation refer to Guide 18. For (C1 (i) tidal work"3 as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; of
fecal government tidal areas refer fo Guide 24. (7 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; or
O10: Reenphoaten Viygecsieteealio” ee LO (iii) carried out within a coastal management district's under the Coastal Act and for -
aa ian Transport ate af Oa) tisposing of dredge spoil or other solid waste material in tidal water - complete Part
ioral —_—,, " manager (71 (b) reclaiming land under tidal water - complete Part M of Form 1; or
{4 (0) constructing a canal"2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
DX] (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For mare information refer to Guide 18.
Unless you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
(fan agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
felation to this matter.
LJ (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district’
Oi (ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
the construction of a new premises with a GFA'S of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2
Dili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Div) reconfiguring a lot!” assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? — complete Part M of Form 1
EX] (v) none of the above
10 Tidal work is defined in sch 10 of tha IPA.
11 Prescribed tidal work is defined in the Coastal! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canat means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and inchides cestain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to catculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway,
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1881 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.