Council archive · source document
07/1881 - Operational Works - Landscaping [As Published] · 142007.1881
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river declaration wil state
works thal take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
Ifyou ticked Q13 i), your apptication must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 it) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
13.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
[Jno Dives (ensure you have completed Part Ka of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works
LJ ii) setf-assessable works
(J iii) exempt works
Works that interfere with overland
flow water
The relevant wild river declaration will state
warks that interfere with overland flow water that
afe either self assessable, assessable or exempt
from wild river requirements.
Ifyou ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q145 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
{fyou ticked Q15 ili) your application Is not
‘subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
5.
Does the application involve works that interfere with overland flow water in a FMA?
&) NO oO YES (ensure you have completed Part Kyo of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
LJ ii) self-assessable works
(J ii) exempt works
Waterway barrier works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES to Q16, your application
must be assessed by DPIF against the Witd
Rivers Code and must comply with the code.
16.
Does the application involve building or raising waterway barrier works in a PA?
&) NO (CI YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted,
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
XI No
[1 YES (ensure you have completed Part O: of Form 1)
Works that interfere with water in a
watercourse
Note: If the development is proposed in a HPA,
appiications for all works that interfere with water
in a watercourse (Including dams or weirs,
stream realignment or stream diversion) will not
be accepted.
[na PA, applications for instream dams and
weirs may be accepted in nominated waterways.
\f you ticked box ii) in Q19, your application will
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www.nnw.qld.goy.au or contacting the
department by email on:
[email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
NO LC yYes (ensure you have completed the relevant Part K of Form 1)
If YES,
(1 i) The application is for an instream dam or weir; or
oO ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir,
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1881 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.