07/1881 - Operational Works - Landscaping [As Published] · 142007.1881

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

'

   

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

 

fom 1 Oactpnait Ayplisetion ics
IDAS Assessment
Checklist —

(Formerly the “Referrals Checklist”)

 

 

 

IMPORTANT NOTE FOR ALL APPLICANTS:

This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the 1DAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensiand State entities (e.g. Environmental Protection
This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the

To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development apptication.

Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from

1.
2.
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3.
determine the assessment manager for the application.
4.
5. __ Itis the responsibility of the applicant to accurately compiete this checklist.
6.
7.
8.
application triggers referral coordination?.
9,
10.
www. ipa.aid.gov.au.
11.

Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 20086.

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

iNote: The fotlowing state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

 

For more information refer to Guide 4. (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above” to Q1, has not been made - complete Part G of Form 1

the application requires assessment by the - a. . . .

administering authority’, (J (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
Ifan entity, other than the administering made - complete Part G of Form 4

authority, is the assessment manager for the
apptication, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kz of Form 1
for approval where an allocation under the Water]
Act 2000 is required.

 

 

&] (ii) none of the above

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed IDAS Assessment Checklist {if applicable).

 

OFFICE USE ONLY (eppticabie to assessment manager}

 

DATE RECEIVED

REFERENCE NUMBER/S

 

1 The assessment manager is responsible for assessing and deciding an iDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?"
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government {for a devolved ERA) or the Queensland Oepartment of Primary Industries and

Fisheries (for a delegated ERA).

Page 1

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1881 - Operational Works - Landscaping [As Published].pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.