The detention basin will be designed to contain all flows up to a Q20 storm event. Storm events
exceeding Q20 will be expected to sheet flow across the boundaries at or less than pre development
flows.
Refer to Appendix F for the Concept Site Levels and Drainage Plan which details the proposed on-
site detention system.
5.4.4 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak mean/median flow rates were
compared for the catchment and are shown in Table 5-5 below.
Table 5-5 - Comparison of Peak Flows
XPSTORM XPSTORM XPSTORM XPSTORM XPSTORM XPSTORM
Catchment A Catchment A Catchment B Catchment B Catchment C Catchment C
ARI Pre- Post- Pre- Post- Pre- Post-
(years) development development development development development development
Flows Flows (Mitigated) Flows Flows Flows Flows
(m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
1 0.035 0.033 0.021 0.000 0.026 0.029
2 0.043 0.038 0.026 0.000 0.029 0.033
5 0.068 0.052 0.041 0.000 0.039 0.044
10 0.087 0.058 0.052 0.000 0.047 0.050
20 0.107 0.066 0.064 0.000 0.056 0.056
50 0.128 0.099 0.077 0.018 0.066 0.056
100 0.145 0.123 0.085 0.034 0.075 0.056
The XPSTORM hydraulic modelling has demonstrated that the proposed mitigation implemented will
maintain pre-development flows (or less) for all design storms at the LPD located within Lot 46 and
62 on SP132578, southeast of the site. The modelling has also demonstrated that post-development
mitigated flows up to Q20 can be conveyed through the 225 to 450mm diameter stormwater line
traversing the rear of Lots 45, 46 and 62 on SP132578 and Lots 42-44 on SP144002.
Refer to Appendix H for the pre-development XPSTORM results, Appendix I for the post-
development XPSTORM results and Appendix J for the XPSTORM post-development mitigated
results.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.