Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

RFI - ATTACHMENT A - SBSMP - Rev 2

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                         20169 - SBSMP/2
                                                                                                  Page 16




                                          Table 6.6 – MUSIC Parameters

                       Parameter                               Data Used

                      Rainfall Data                         40908 TEWANTIN

                  Modelling Timestep                           6 minutes

                        Routing                    No routing drain links were adopted



                             Table 6.7 – Catchment Runoff Generation Parameters

                                  Parameter                        Residential Catchment


                              Rainfall Threshold                              1

                         Soil Storage Capacity (mm)                          500

                    Initial Storage Capacity (% capacity)                    10

                             Field Capacity (mm)                             200

                      Infiltration Capacity Coefficient a                    211

                      Infiltration Capacity Coefficient b                     5

                             Initial Depth (mm)                              50

                           Daily Recharge Rate (%)                           28

                           Daily Baseflow Rate (%)                           27

                        Daily Deep Seepage Rate (%)                           0


6.3.5 MUSIC Modeling Results
Refer to Figure 6.1 for a print screen schematic of the MUSIC model for the proposed development
and Figure 6.2 for the annual pollutant loads that will be discharged from the site for the proposed
development.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
Log in to download the original file

RFI - ATTACHMENT A - SBSMP - Rev 2.pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.